My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GUEST HOUSE LP (2)-2016
Clerk
>
Contracts / Agreements
>
G
>
GUEST HOUSE LP (2)-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2017 1:19:42 PM
Creation date
5/2/2017 10:25:26 AM
Metadata
Fields
Template:
Contracts
Company Name
GUEST HOUSE LP
Contract #
A-2016-155
Agency
Community Development
Council Approval Date
6/21/2016
Notes
A-2016-369
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Minimum Standard • Safe, sound and in good working order. Doors shall be <br />impermeable (primed and painted). <br />• Five or more years of practical utility. <br />Rehabilitation • Garage doors and openers that do not meet the minimum standard <br />shall be replaced. Practical, cost effective repairs are acceptable as <br />long as compliance with the miniinum standard will be achieved. <br />Minimum Standard * <br />Homes built before 1978 must comply with 24 CFR Part 35 Subpart <br />J <br />and HUD's Lead Safe Housing Rule regarding the evaluation and <br />control of lead-based paint hazards. <br />• <br />All exterior paint shall be intact and free of corrosion. <br />• <br />Five or more years of practical utility. <br />Rehabilitation • <br />All surfaces to be painted shall be prepared properly. All loose <br />material and peeling paint shall be removed. <br />• <br />All holes and cracks shall be filled and finished so that they blend <br />into the surrounding area. <br />• <br />All stucco surfaces to be painted shall receive a complete and even <br />coverage of stucco paint. <br />• <br />All wood surfaces to be painted shall receive a complete and even <br />coverage of flat exterior paint. <br />• <br />Poor workmanship will not be tolerated. <br />New Paint • Reputable manufacturer. <br />• Highest quality available. <br />• Zero or low VOC paint, caulking and fillers, <br />Minimum Standard • Safe and structurally sound. <br />• All plaster, drywall and paneling shall be safe and intact. <br />Rehabilitation • Walls and wall coverings that do not meet the minimum standard <br />shall be replaced. Practical, cost effective repairs are acceptable as long <br />as compliance with the minimum standard will be achieved. <br />............................ . <br />0 If the project involves a gut rehab, the attic, walls and floor on <br />
The URL can be used to link to this page
Your browser does not support the video tag.