My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KIMLEY-HORN AND ASSOCIATES,INC. - 2017
Clerk
>
Contracts / Agreements
>
K
>
KIMLEY-HORN AND ASSOCIATES,INC. - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2022 12:09:24 PM
Creation date
5/18/2017 11:34:09 AM
Metadata
Fields
Template:
Contracts
Company Name
KIMLEY-HORN AND ASSOCIATES,INC.
Contract #
A-2017-108
Agency
PUBLIC WORKS
Council Approval Date
5/2/2017
Expiration Date
5/2/2018
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7�= <br />Solution: We will begin evaluating sight lines at the <br />initiation of Project work by recording existing sight line <br />deficiencies in the field observation. Our Designer's will <br />seek to eliminate or improve existing deficiencies and <br />review resulting lines of sight on the design base. Areas <br />of concern are annotated with sight lines drawn on an <br />exhibit for evaluation and documentation purposes. See <br />Figure 4 indicating design consideration. <br />Driveways <br />Issue: Driveways present one of the most common Figure 4 - Consideration of sight lines is a critical <br />conflicts with cyclist since they are typically uncontrolled element for a safe bikeway. <br />and occur frequently along the alignment. In addition, <br />driveways tend to be a common area where restricted sight lines cannot be feasibly mitigated. <br />Solution: Our Team will review driveway conditions and note those with sight line deficiencies or other <br />elements that may lead to potential conflicts. We will also identify commercial driveways with significant <br />traffic volumes. At these locations, we will consider adding signage and markings to warn vehicles of <br />oncoming cyclists. For unique conditions, we will consider warning devices or other treatments to notify <br />cyclists and potentially slow travel to promote safety. See Figures 5 and 6 for typical examples. <br />Figure 5 - Painted bike lane at driveways. <br />Scope of Services <br />Figure 6 - Flexible delineator and painted bike <br />lane at driveway. <br />We have reviewed the detailed scope of work contained in Attachment 1 of the City's Request for Proposals. <br />The following is intended to supplement and clarify scope items to demonstrate phases of work to be <br />completed, tasks to be accomplished, and deliverables to be provided. Additional items that may be required <br />to complete the scope of work are described at the end of the matrix under the heading "Optional Items". <br />Design plans and reports indicated herein will follow City standard format unless indicated otherwise. A <br />Drawing List indicating anticipated sheet count is included with our fee in the separate, sealed envelope. We <br />assume a nine -month schedule for design beginning in April 2017 with work completed by January 15, 2018. <br />Our proposed schedule is provided at the end of this section. <br />Task 1: Project Coordination and Meetings <br />Kimley-Horn will meet and/or communicate with City staff and other stakeholders to coordinate design <br />elements. This encompasses coordination with the OC Streetcar design team and other stakeholders, such <br />Kimley»)Horn 10 rRED77007.17I City of Santa Ana <br />
The URL can be used to link to this page
Your browser does not support the video tag.