My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR ENGINEERING, INC. - 2017
Clerk
>
Contracts / Agreements
>
H
>
HDR ENGINEERING, INC. - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2019 11:35:29 AM
Creation date
5/18/2017 11:42:33 AM
Metadata
Fields
Template:
Contracts
Company Name
HDR ENGINEERING, INC.
Contract #
A-2017-085
Agency
PUBLIC WORKS
Council Approval Date
4/18/2017
Expiration Date
4/17/2020
Insurance Exp Date
6/1/2020
Destruction Year
0
Document Relationships
HDR ENGINEERING, INC.
(Amended By)
Path:
\Contracts / Agreements\H
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Policy Number: TB2-641-444950-038 <br />THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. <br />•0 • .. • <br />,► t <br />This endorsement modifies insurance provided under the following: <br />COMMERCIAL GENERAL LIABILITY COVERAGE PART <br />SCHEDULE <br />Designated Construction Project(s): <br />All construction projects not located at premises owned, leased or rented by a Named Insured <br />Information required to complete this Schedule, if not shown above, will be shown in the Declarations. <br />A. For all sums which the insured becomes legally <br />3. Any payments made under Coverage A for <br />obligated to pay as damages caused by 'occur- <br />damages or under Coverage C for medical <br />rences" under Section I — Coverage A, and for all <br />expenses shall reduce the Designated Con - <br />medical expenses caused by accidents under <br />struction Project General Aggregate Limit for <br />Section I — Coverage C, which can be attributed <br />that designated construction project. Such <br />only to ongoing operations at a single designated <br />payments shall not reduce the General Ag- <br />construction project shown in the Schedule <br />gregate Limit shown in the Declarations nor <br />above: <br />shall they reduce any other Designated Con- <br />t. A separate Designated Construction Project <br />struction Project General Aggregate Limit for <br />General Aggregate Limit applies to each des- <br />any other designated construction project <br />ignated construction project, and that limit is <br />shown in the Schedule above. <br />equal to the amount of the General Aggregate <br />4. The limits shown in the Declarations for Each <br />Limit shown in the Declarations. <br />Occurrence, Damage To Premises Rented To <br />2. The Designated Construction Project General <br />You and Medical Expense continue to apply. <br />Aggregate Limit is the most we will pay for the <br />However, instead of being subject to the <br />sum of all damages under Coverage A, ex- <br />General Aggregate Limit shown in the Decla- <br />cept damages because of "bodily injury" or <br />rations, such limits will be subject to the appli- <br />"property damage" included in the "products- <br />cable Designated Construction Project Gen - <br />completed operations hazard", and for medi- <br />eral Aggregate Limit. <br />cal expenses under Coverage C regardless of <br />the number of: <br />a. Insureds; <br />b. Claims made or "suits" brought; or <br />c. Persons or organizations making claims or <br />bringing "suits". <br />CG 25 03 05 09 © Insurance Services Office, Inc., 2008 Page 1 of 2 ❑ <br />REVIEWED BY: EUNICE h EREDIA (PGA orQ ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.