My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR ENGINEERING, INC. - 2017
Clerk
>
Contracts / Agreements
>
H
>
HDR ENGINEERING, INC. - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2019 11:35:29 AM
Creation date
5/18/2017 11:42:33 AM
Metadata
Fields
Template:
Contracts
Company Name
HDR ENGINEERING, INC.
Contract #
A-2017-085
Agency
PUBLIC WORKS
Council Approval Date
4/18/2017
Expiration Date
4/17/2020
Insurance Exp Date
6/1/2020
Destruction Year
0
Document Relationships
HDR ENGINEERING, INC.
(Amended By)
Path:
\Contracts / Agreements\H
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. For all sums which the insured becomes legally <br />obligated to pay as damages caused by "occur- <br />rences" under Section I — Coverage A, and for all <br />medical expenses caused by accidents under <br />Section I — Coverage C, which cannot be at- <br />tributed only to ongoing operations at a single <br />designated construction project shown in the <br />Schedule above: <br />1. Any payments made under Coverage A for <br />damages or under Coverage C for medical <br />expenses shall reduce the amount available <br />under the General Aggregate Limit or the <br />Products -completed Operations Aggregate <br />Limit, whichever is applicable; and <br />2. Such payments shall not reduce any Desig- <br />nated Construction Project General Aggre- <br />gate Limit. <br />C. When coverage for liability arising out of the <br />"products -completed operations hazard" is pro- <br />vided, any payments for damages because of <br />"bodily injury" or "property damage" included in <br />the "products -completed operations hazard" will <br />reduce the Products -completed Operations Ag- <br />gregate Limit, and not reduce the General Ag- <br />gregate Limit nor the Designated Construction <br />Project General Aggregate Limit. <br />D. If the applicable designated construction project <br />has been abandoned, delayed, or abandoned <br />and then restarted, or if the authorized contract- <br />ing parties deviate from plans, blueprints, de- <br />signs, specifications or timetables, the project will <br />still be deemed to be the same construction pro- <br />ject. <br />E. The provisions of Section III — Limits Of Insur- <br />ance not otherwise modified by this endorsement <br />shall continue to apply as stipulated. <br />Page 2 of 2 © Insurance Services Office, Inc., 2008 CG 25 03 05 09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.