Laserfiche WebLink
EXHIBIT 2 <br />RESOLUTION 2017 -XXX <br />3.36% <br />PROPOSED <br />REVENUE <br />FY 16-17 <br />FY 17-18 <br />ACCOUNT <br />DEPARTMENT/MISCELLANEOUS FEE OR SERVICE <br />UNIT <br />FEES <br />FEES <br />SECTION IX <br />PLANNING & BUILDING AGENCY <br />Residential: <br />51603 <br />188) Single Dwelling Unit <br />34.20 <br />35.35 <br />51603 <br />189) Each Additional dwelling unit (2-20) <br />30.09 <br />31.10 <br />51603 <br />190) Each additional Unit (Over 20) <br />18.36 <br />18.98 <br />Miscellaneous: <br />51603 <br />191) Light Standard (Pole) with one fixture <br />23.10 <br />23.88 <br />51603 <br />192) Additional Fixtures - Same Pole <br />0.00 <br />51603 <br />193) Power Pole (Temporary) <br />95.99 <br />99.22 <br />51603 <br />194) Additional Distribution Poles <br />23.10 <br />23.88 <br />51603 <br />195) Swimming Pool, Spa, Fountain <br />112.78 <br />116.57 <br />51603 <br />196) Above Ground Spa <br />48.73 <br />50.37 <br />51603 <br />197) Demolition <br />45.13 <br />46.65 <br />51603 <br />198) Signs & Neon/LED Decorative Lighting <br />69.97 <br />72.33 <br />(refundable bond) <br />New or Total Rewire for Single Family Dwellings: <br />51603 <br />199) SFD (per square foot) <br />sq. ft. <br />0.13 <br />0.14 <br />51603 <br />200) Garage (per square foot) <br />sq. ft. <br />0.13 <br />0.14 <br />51603 <br />201) Temporary Electrical Service, Prior to approval or <br />Each Meter <br />227.34 <br />234.98 <br />Occupancy (30 Days) <br />At the time of application for temporary power, the owner <br />shall post a $1,000.00 cash or cashier's check conforming to the <br />Santa Ana Municipal Code Section 8-1768 for each service <br />meter. This deposit shall be released upon request after the <br />Certificate of Completion or Certificate of Occupancy is issued. <br />Mechanical Fees <br />51604 <br />202) Permit Issuance Fee <br />51.26 <br />52.98 <br />51604 <br />203) Minimum Fee (Nonresidential) <br />68.34 <br />70.64 <br />53603 <br />204) Stand Alone Mechanical Plan Check <br />65% of Subtotal <br />65% of Subtotal <br />75A-1-50 41 <br />