My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25A - AGMT - CONSTRUCTION SURVEYING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
07/05/2017
>
25A - AGMT - CONSTRUCTION SURVEYING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2017 2:56:08 PM
Creation date
6/29/2017 2:47:16 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25A
Date
7/5/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONI.JMLNTIIEIUII:',TIJfI'TI.ON <br />We cannot precisely determine a cost per monument. This due to variables of the site conditions. For instance, <br />monuments that are not on the surface need to be dug up -which can take 10-30 minutes - as compared to a <br />monument existing on the surface. <br />A monument than has 4 existing ties only requires us to verify the ties - tagging thein if they are not currently <br />tagged. Conversely, a monument that has no existing ties will requires us to set lead ties with Lead, tack and tag <br />which will need to then be measured. <br />Our firm has performed these types of projects in the past. We realize that when working with this many <br />monuments in widely varying conditions we will have wide variations in the existing conditions. The worst case <br />scenario is most of the monuments are buried from previous paving projects and the existing ties are no longer <br />srh place. <br />Considering all of these variables including filing of Corner records we are comfortable with it per monument <br />unit cost which will allow us to complete any monument perpetuation project according to the scope outlined. <br />$550.00 per monument to be perpetuated. Once a specific project is isschcd we can provide a more accurate <br />rate to the City. <br />Construction Staking <br />2,000+/- Linear feet per day depending on site conditions. <br />S2,475for one day with a Two -Man Crew <br />Mapcbecking <br />Survey Manager 5165.00/flour <br />1). Woolley & Asmici arcs, I tic, <br />2832 Walnutmi c,Suitu A <br />�aao�l <br />liFi <br />714,34 &a62 <br />. ... .... .. _._ /etc <br />�Phone: <br />---- <br />
The URL can be used to link to this page
Your browser does not support the video tag.