My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RINCON CONSULTANTS, INC. - 2017
Clerk
>
Contracts / Agreements
>
R
>
RINCON CONSULTANTS, INC. - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 4:33:44 PM
Creation date
8/10/2017 10:54:36 AM
Metadata
Fields
Template:
Contracts
Company Name
RINCON CONSULTANTS, INC.
Contract #
A-2017-182
Agency
COMMUNITY DEVELOPMENT
Council Approval Date
8/1/2017
Expiration Date
7/31/2020
Insurance Exp Date
9/22/2018
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Qualifications to Provide <br />Environmental Services — Housing Division <br />Historic American Buildings Survey (NABS) documentation, preservation plans, design guidelines, National Register of <br />Historic Places nominations, and historic context statements. <br />Jennifer Morton, PG, Senior Project Manager <br />Education: B.S., Earth Sciences, University of California, San Diego, California <br />Certifications: Professional Geologist, California; 40 -Hour HAZWOPER OSHA 29 CFR 1910.120; Current 8 -Hour <br />OSHA Refresher Course <br />Role: Phase I and Phase II ESA Management Years of Exp: 16 <br />Me, Morton is a Professional Geologist with experience conducting Phase I and Phase II environmental assessments, as <br />well as assisting with and overseeing remediation projects. Ms. Morton has extensive experience conducting Phase I <br />ESAs for a wide range of property types throughout California. Additionally, Ms. Morton has experience conducting <br />Phase II environmental assessments and groundwater monitoring for numerous leaking underground storage tank (UST) <br />properties throughout California; she has also conducted Phase II assessments in connection with dry cleaning, <br />automotive repair, and manufacturing facilities, as well as former agricultural land and a former oil production property. <br />Ms. Morton has successfully worked with local and state regulatory agencies to comply with assessment requirements, <br />develop property mitigation plans, and to achieve case closures. <br />Additional Support Staff <br />In addition to the key staff identified above, Rincon has a number of field staff that will be available to work on projects <br />stemming from this contract. <br />Years of <br />Name EducationtRegistrations/Certifications !Exp Project Rale <br />B.S., Soil Science <br />Professional Geologisk California (#8663); Certified <br />Turin Snyder, PG, CHG, Hydrogeologist, California (#950); Qualified SWPPP 16 Hazardsl <br />QSD, CPSS Developer/Practitioner (949) Hydrology Studies <br />Certified Professional Soil Scientist, SSSA (#28222); <br />B.A., Environmental Science Phase I and II , and <br />Jake Hurley, QSP Qualified SWPPP Practitioner (#22155); HAZWOPER 10 Remediation <br />_ Support _ <br />Lauren Roenicke B.S., Environmental Studies, UCSB 4 Phase I Support <br />40 Hour HAZWOPER <br />Vanessa Villanueva B.S., Environmental Science 2 Environmental <br />Analysis <br />Lynette Leighton, MEM M.E.M, Industrial Ecology and Urban Planning Environmental <br />B.S., Environmental Policy and Entomology 11 Analysis <br />Relevant Experience <br />The following selected project summaries represent Rincon's broad range of experience supporting local agencies <br />throughout California with environmental compliance programs for housing projects. We believe that our successful and <br />extensive experience on similar on-call contracts demonstrates our qualifications for this contract. <br />Santa Ana Projects <br />First Street Family Apartments Project IS -MND <br />City of Santa Ana, Ali Pezeshl(pour-714-647-5882 <br />Rincon Consultants was contracted by the City of Santa Ana to prepare an IS -MND for a proposed affordable housing <br />development. The proposed project Involved demolition of an existing brick office building and associated surface <br />Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.