Laserfiche WebLink
Qualifications to Provide <br />Environmental Services- Housing Division <br />Dorado Residential Development Project EIR (2014- 2016) <br />City of Long Beach — Craig Chalfant -- 562-570-6308 <br />Rincon prepared an EIR examining a proposed development Including 40 single family residences on North Norwalk <br />Boulevard in the City of Long Beach, The project site is 5.8 -acres and Is currently developed with a church facility with a <br />parking lot, landscaped area, and a cell tower. The church would be demolished to make room for the housing <br />development. Key issues included biological resources, cultural resources, and traffic. <br />Holt Avenue Apartments IS -MND (2013) <br />City of Pomona, Brad Johnson — 909-620-2191 <br />Rincon prepared an IS -MND on a proposed 62 -unit apartment complex In Pomona. The site is currently occupied by a <br />partially occupied mobile home complex and vacant commercial buildings. The proposed project involved the relocation <br />of the occupants of the existing partially occupied mobile home park and the demolition of site improvements. The <br />proposed apartment complex would consist of a several two-story townhomes and a three-story apartment building. In <br />addition, a number of the units would be designated for Mental Health Services Act housing. Key environmental Issues <br />include historic resources, hazards/health risk, traffic, and noise. <br />Hazards Projects <br />Redevelopment and Housing Rehabilitation Assistance L04— Present) <br />City of Santa Ana Community Development Agency, George Garcia, 714-667-2254 <br />Rincon Consultants, Inc. was awarded an open services contract to conduct Phase I ESAs, Phase II ESAs, Remediation, <br />and Asbestos & Lead -Based Paint Surveys for multiple sites throughout the City of Santa Ana, Since 2004, this has <br />Included more than 60 individual projects and within the last 5 years, 25 projects have been conducted. <br />On -Call Phased 311 Environmental Site Assessment Services (2014) <br />City of San Diego, Real Estate Assets Department, Mary Carlson, 619-236.6079 <br />In 2014, Rincon was awarded a 5 year, $75,000 on-call contract to perform Environmental Site Assessment (ESA) <br />services for the City of San DiegoReal Estate AssetsDepartment. As part of that contract we have completed Phase I <br />ESAs, Phase 11 ESAs (Subsurface Investigations), and Asbestos & LBP Surveys. As requested, the Phase I ESA reports <br />were conducted in general conformance with the ASTM Standard Practice for Environmental Site Assessments. <br />Environmental Portfolio Consultant Services(2006-present) <br />Richmond American Homes, Van Martin — 949-467-2648 <br />Rincon has held a master services agreement with Richmond American Homes since 2006 and has completed hundreds <br />of Phase I ESAs and Phase 11 ESAs as part of Richmond American Homes' acquisition transactions over the past ten <br />years. Sites assessed by Rincon have Included vacant lots, agricultural properties, residential homes, and various <br />commercial/industrial facilities, including bakeries, auto dismantling facilities, junkyards, office buildings, and retail <br />facilities. The Phase I ESAs completed for this client are typically completed within two weeks. <br />Subcansultants <br />VM3 Environmental, Inc, <br />VM3 Environmental, Inc. is the forefront leader in the environmental mold, asbestos, lead paint and allergen inspection <br />and sampling industry since our inception in 2007. We are a MicroBusiness with certified technicians strategically located <br />throughout Southern California allowing us to provide the highest level of service to our municipal, commercial and <br />residential clients. Over the years, cur services include building surveys, project monitoring and management, clearance <br />inspections, air sampling, swab sampling, moisture meter readings, infrared measurement and temperature and humidity <br />meter readings. We ensure that all OSHA, EPA, DOT, HUD arid state regulations are strictly adhered to on all phases of <br />our projects. All of our employees must conduct all work safely and in strict accordance with the plans, instructions and <br />directions of the designated project supervisors and managers. In addition, VM3 has the specific experience in entering <br />tenant spaces and project coordination that this proposal requires. <br />Page 1 I <br />