Laserfiche WebLink
Qualifications to Provide <br />Environmental Services — Housing Division <br />Kunzman Associates, Inc. provides services for transportation planning/traffic engineering, parking, noise/vibration <br />studies, expert witness, peer reviews, and air quality/global climate change/health risk assessments. <br />Key Staff <br />William Kunzman, P.E., will be the Kunzman Associates, Inc. PrincipaHnCharge and assure that manpower and <br />material resources are allocated to complete the project on time and within the budget. His work experience includes <br />employment by the Federal Highway Administration, the Counties of Los Angeles and Riverside, and the City of Irvine, <br />His education includes completing undergraduate studies in engineering at University of California at Los Angeles (1967) <br />and graduate studies in traffic engineering at Yale University (1968). <br />Project Experience <br />Carver Elementary School Consolidation Traffic Impact Analysis (2017) <br />First Carbon Solutions, Charles Holcombe — 909-884-2255 x 1225 <br />Carver Elementary School currently serves kindergarten through 3rd grade and Romero -Cruz Elementary School <br />currently serves 4th and 5th grade students which are proposed to be relocated to Carver Elementary School. The new <br />site will serve kindergarten through 5th grade and its capacity will increase by 300 students. The Romero -Cruz <br />Elementary School site is proposed to be replaced with a 9th through 12th grade community day school. The traffic <br />impact analysis contains documentation of Existing traffic conditions, trips generated by the project, distribution of the <br />project trips to roads outside the project as well as calculation of Existing Plus Project traffic conditions, and Opening <br />Year (2018) traffic conditions without and with the project. <br />The Line at Santa Ana Traffic Impact Analysis (2016) <br />The Line at Santa Ana, Daryl Sequeira -- 310-552-0065 <br />The project site is located east of Harbor Boulevard and south of the Westminster Avenue in the City of Santa Ana. The <br />proposed mixed-use development consists of 4,000 square feet of retail land use and 228 apartment dwelling units. The <br />project site Is proposed to provide access to Westminster Avenue. The traffic impact analysts contains documentation of <br />existing traffic conditions, trips generated by the project, distribution of the project trips to roads outside the project, <br />analysis of existing plus project traffic conditions, and calculation of Opening Year traffic conditions without and with the <br />project. <br />Rincon Consultants, Inc. is proud of its reputation as a leader in the environmental consulting industry that has been <br />developed over the past 23 years. The following references will attest to our performance on past projects. At your <br />request, we would be pleased to provide you with other references or work samples. <br />Community Development <br />Assets Department <br />Mayor's Office of Housing and <br />Commission <br />Mary Carlson <br />Community Development <br />Donald Dean <br />619-236.6079 <br />Eugene Flannery <br />626-586-1740 <br />On -Call Phase I & 11 ESA Services <br />415-701-5598 <br />LA CDC On -Call Environmental <br />NEPA Environmental Review <br />Consulting Services <br />Services On -Call Contract <br />City of Chino Hills <br />Richmond American Homes <br />City of Oxnard <br />Jerrod Walters <br />Sondra Harris <br />Kathleen Mallory <br />909.364-2753 <br />949-467-2633 <br />805.385-8370 <br />Trumark Homes Mixed Use <br />Phase I and Phase II ESA <br />City of Oxnard CDBG Program <br />Develooment MND <br />Portfolio <br />Page 13 <br />