Laserfiche WebLink
Grand Avenue Widening Project Environmental Impact Report Section 3.0 <br />Figure 3.5-6 shows the projected 2020 daily traffic volumes on the project segment of Grand <br />Avenue. As shown, the daily midblock volumes range from 31,300 vpd south of Seventeenth Street <br />to 38,000 south of Fruit Street, and 36,600 vpd north of First Street. The 2020 AM and PM peak <br />hour intersection turning volumes are shown in Figures 3.5-7 and 3.5-8, respectively. <br />LOS Analysis. Analysis of future conditions was conducted to determine roadway and <br />intersection operating efficiency as reflected by the LOS measures. Table 3.5-5 summarizes the <br />future LOS for the three midblock locations on the project segment of Grand Avenue under the <br />No Project Alternative and the Build scenario. As shown, the road segments between First and <br />Fruit Streets would operate at LOS E or F in 2020 under the No Project Alternative. Under the <br />Build scenario, these segments would operate at LOS B. The segment south of Seventeenth <br />Street, which already provides six through lanes, would operate at LOS A under both the No <br />Project Alternative and Build scenario. <br />Table 3.5-6 shows the peak hour ICU and LOS values for the No Project Alternative and the <br />Build scenario. As shown, under the 2020 No Project Alternative, unacceptable levels of service <br />at LOS E or F, will occur at the following intersections during at least one of the peak hours: <br />• Seventeenth Street <br />• I-5 northbound ramps <br />• Fourth Street <br />TABLE 3.5-5 <br />2020 ROAD LEVEL OF SERVICE SUMMARY <br />Road Section <br />NO PROJECT <br />ALTERNATIVE <br />BUILD ALTERNATIVE <br />V/C <br />LOS <br />V/C <br />LOS <br />Grand Avenue: <br />PM Peak Hour <br />AM Peak Hour <br />PM Peak Hour <br />Intersection <br />South of Seventeenth Street <br />0.56 <br />A <br />0.56 <br />A <br />South of Fruit Street <br />1.01 <br />F <br />0.67 <br />B <br />North of First Street <br />0.98 <br />E <br />0.65 <br />B <br />TABLE 3.5-6 <br />2020 INTERSECTION LEVEL OF SERVICE SUMMARY <br />R- PROD-ENVIGrand eirWew Text - GrandlSection 3 Split&ction 3.5.doc Page 3.5-12 <br />NO PROJECT ALTERNATIVE <br />BUILD ALTERNATIVE <br />AM Peak Hour <br />PM Peak Hour <br />AM Peak Hour <br />PM Peak Hour <br />Intersection <br />ICU <br />LOS <br />ICU <br />LOS <br />ICU <br />LOS <br />ICU <br />LOS <br />Seventeenth Street <br />0.77 <br />C <br />1.10 <br />F <br />0.65 <br />B <br />0.91 <br />D <br />I-5 northbound ramps <br />0.64 <br />B <br />0.98 <br />E <br />0.64 <br />B <br />0.79 <br />C <br />Santa Ana Blvd./I-5 HOV ramps <br />0.73 <br />C <br />0.89 <br />D <br />0.73 <br />C <br />0.74 <br />F <br />Fruit Street <br />0.59 <br />A <br />0.79 <br />C <br />0.49 <br />A <br />0.65 <br />B <br />OrangeCounty Register Driveway <br />0.45 <br />A <br />0.45 <br />A <br />0.32 <br />A <br />0.35 <br />A <br />Fourth Street <br />0.89 <br />D <br />0.93 <br />E <br />0.74 <br />C <br />0.88 <br />D <br />First Street <br />0.84 <br />D <br />0.85 <br />D <br />0.78 <br />C <br />0.72 <br />C <br />R- PROD-ENVIGrand eirWew Text - GrandlSection 3 Split&ction 3.5.doc Page 3.5-12 <br />