My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
P & D CONSULTANTS - 2002
Clerk
>
Contracts / Agreements
>
P
>
P & D CONSULTANTS - 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2020 9:32:30 AM
Creation date
8/10/2017 11:34:03 AM
Metadata
Fields
Template:
Contracts
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Grand Avenue Widening Project Environmental Impact Report Section 1.0 <br />SECTION 1.0 <br />PROJECT DESCRIPTION AND PROJECT OBJECTIVES <br />1.1 PROPOSED PROJECT <br />1.1.1 OVERVIEW <br />The City of Santa Ana is proposing to widen the segment of Grand Avenue between Seventeenth <br />Street on the north and First Street on the south, to the General Plan Circulation Element <br />designation of Major Arterial. As defined in the Circulation Element, a Major Arterial includes six <br />through travel lanes and enhanced features at intersections, including dedicated right and left turn <br />lanes, to maintain the operating capacity of the road. The City of Santa Ana is the lead agency <br />under the California Environmental Quality Act (CEQA) for this E1R for the Grand Avenue <br />widening project. The City is also the lead agency for the proposed Grand Avenue widening <br />project. The City may need an encroachment permit from Caltrans for construction and traffic <br />control measures on Grand Avenue within Caltrans right-of-way for Interstate 5 (I-5) at its <br />interchange with Grand Avenue. <br />The location of the project segment of Grand Avenue is shown in Figure 1-1. The City of Santa <br />Ana developed two build alternatives for the project segment of Grand Avenue. Alternatives 1 and <br />2, which assume cross sections of 100 and 120 feet on the project segment of Grand Avenue, <br />respectively, are shown in Figures 1-2 and 1-3. Typical cross sections on Grand Avenue under <br />these alternatives are also shown in Figures 1-2 and 1-3. In addition, the City has identified a no <br />build or No Project Alternative. Alternatives 1 and 2 and the No Project Alternative are evaluated <br />in this Focused Environmental Impact Report (EIR). These alternatives are described in the <br />following sections. <br />Since the release of the Notice of Preparation, the centerlines for both Alternatives 1 and 2 have <br />been shifted to reduce the extent of takes on the east side of Grand Avenue. In addition, a <br />westbound right turn only lane from southbound Grand Avenue to westbound First Street; a right <br />turn pocket from westbound First Street to northbound Grand Avenue; and a right turn pocket from <br />westbound Seventeenth Street to northbound Grand Avenue have been added to both Alternatives 1 <br />and 2. Also, Alternative 1 no longer includes a bicycle lane. Alternative 2 includes an on -street <br />bicycle trail which is five feet wide in each travel direction. <br />1.1.2 DESCRIPTION OF BUILD ALTERNATIVE 1 <br />Alternative 1 assumes the project segment of Grand Avenue would be widened from the existing <br />four lanes in a cross section that varies from approximately 80 to 110 feet wide, to six lanes in a 100 <br />foot wide cross section, with a landscaped median. The addition of the landscaped, center median <br />would remove the opportunity for some left turns across this segment of Grand Avenue. No existing <br />driveway access would be removed. Under this Alternative, the widening, including the acquisition <br />of right-of-way, would occur intermittently on both the east and west sides of Grand Avenue. <br />Alternative 1 is anticipated to result in the acquisition of a total of 479,239 square feet of right-of- <br />way, in a total of 20 partial takes and 45 full takes of existing parcels along the project segment of <br />Grand Avenue. The existing edge of right-of-way for Grand Avenue, and the proposed edge of <br />right-of-way under Alternative 1, are shown on Figure 1-2. Table 3-1, provided later in this <br />F.•IPROJ-ENVIGrand eirWew Text- GrandlSection 1.0-new.doc Page 1-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.