My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - WIOA
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
08/15/2017
>
25C - AGMT - WIOA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2017 6:37:33 PM
Creation date
8/10/2017 6:23:46 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
25C
Date
8/15/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 3 <br />OTHER SHARED COST BUDGET <br />Co- o at d Pa r ,e me • t r O he Sys e s s, <br />The other system costs budget includes any other shared services that are authorized for and <br />commonly provided through the AJCC partner programs. <br />As with infrastructure costs, other system costs must be allocable according to the proportion of <br />benefit received by each of the AJCC partner programs, consistent with the partner's <br />authorizing federal statute and Uniform Guidance. The MOU Phase ll must also include an <br />agreed upon budget for these other costs along with the agreed upon cost sharing <br />methodology. These costs may be shared through cash or non-cash. <br />Shared Comprehensive Personnel Costs for AJCC Co -located Partners <br />Shared Costs based on Proportionate Square Footage Occupied. <br />mt ACC Sys et Bud eB1CC Person e t n <br />AJCC Personnel Budget Detail <br />Contracted Security Guard 1 FTE @ 56,737.06 <br />Receptionists (SOA) 1 FTE @ $97,207 <br />Total Personnel Budget $153,944.06 <br />lin ti_aFtP:opor`tona a Sha e"�oln"rs'�ruc,�rCos s.A�loc ed fo Each-. <br />Y <br />C0_ oocctte@artner' <br />The cost allocation methodology will be based upon a partner program's occupancy percentage <br />of the AJCC (square footage). This method will ensure a fair and equitable distribution of cost. <br />The initial proportionate share of infrastructure costs allocated to each partner based on the <br />above methodology, each partner's estimated total contribution amount, and whether it will be <br />provided through cash, non-cash (in-kind), and/or third -party in-kind contributions. This initial <br />determination will be periodically reconciled against actual costs incurred and adjusted <br />accordingly due to ADA improvements, new occupancy and/or execution of new lease. <br />AJCC partners may provide cash or non-cash contributions to cover their proportionate share of <br />infrastructure costs. If non-cash or in-kind contributions are used, they cannot include non - <br />infrastructure costs (such as personnel), and they must be valued consistent with Uniform <br />Guidance Section 200.306 to ensure they are fairly evaluated and meet the partner's <br />proportionate share. <br />k � }� �,tr{ Sharetl CoSnprehensiVe Personnel Costs Allocated �o Each '�< � � ? �� , `�, <br />� � <br />FYMh�Ts. 2*.�aPh a F..v;f ..Zn. vJ lkii.5j.1�:�`a =T�Mt Y<1'awtN/I,aA4'.-. L;xf Af. i>[.,�, w? -.£Y5 i,�v.>�. s. N�fRS�d .�.�,f'+Yx . SE•e}k y,� �', <br />The cost allocation methodology will be based upon the same methodology as mentioned <br />above, a partner program's occupancy percentage of the AJCC (square footage). This method <br />will ensure a fair and equitable distribution of cost. <br />a" <br />`Allocation of Proportionate <br />Share of Infrastructure Costs for.Co located Partners £ _ <br />t. S.o i... ..xd <br />Co -located Partner <br />Application of <br />Allocated <br />Amount: <br />Amount: <br />DOR <br />Methodology <br />Initial Share <br />Cash <br />In -Kind <br />Other System Costs <br />1.26% <br />$1,939.70 <br />25C-56 <br />
The URL can be used to link to this page
Your browser does not support the video tag.