My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FORNESS CONTRUCTION, INC.)-2017
Clerk
>
Contracts / Agreements
>
F
>
FORNESS CONTRUCTION, INC.)-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2022 9:34:55 AM
Creation date
8/29/2017 1:51:47 PM
Metadata
Fields
Template:
Contracts
Company Name
FORNESS CONTRUCTION, INC.
Contract #
A-2017-220
Agency
Public Works
Council Approval Date
8/15/2017
Expiration Date
8/15/2020
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BARRIER ASSEMBLY <br />1. Plywood shall be out to fit over the window and door openings, flush with outside of the <br />molding/trimmer stud. Application of barriers shall be completed so that all lift or pry points are <br />avoided. Plywood board shall be solid sheets without seams or joints. <br />I The 2x4 braces shall be cut to fit the horizontal dimension of the plywood. Two exterior and two <br />interior 2x4 braces shall be provided for each window and three sets for each door. <br />3. Window Assembly— Braces are located horizontally approximately 1/3 of the distance from the <br />top and the bottom of the window. Bolt holes are located 1/3 of the length of the brace from the <br />outside edge of the window jams. Prior to installation, the assembly should be pre-assombled and <br />3/8" holes drilled through all of the components. <br />4. Door Assembly — Door braces will be placed horizontally; one in the center of the doorway and <br />one 1/2 the distance from the center to the top and one 1/2 distance from the center to the bottom <br />of the doorway, Bolt holes are located 1/3 of the length of the brace from the outside edge of the <br />door frame. Prior to installation, the assembly should be pre -assembled and 3/8" holes drilled <br />through all of the components. <br />5. Plywood used to cover exterior openings shall be nailed every 12" along the perimeter of the <br />frame of the window, door, or opening. <br />6. The 2x4 braces on the interior and exterior of the assemblies shall be secured using 3/8" by 12" <br />carriage bolt assemblies. Bolts shall be inserted through the predrilled holes from the exterior <br />with a 1/2" washer place against the exterior brace, a 3/8" washer is placed against the interior <br />brace. The bolt is tightened from the inside so that it slightly compresses the interior brace. The <br />2x4 Bottom Brace shall be cut to width of door trim and drilled to the floor to prevent opening. <br />7, Garage Door— the opening shall be covered with plywood and secured with a minimum of 3- <br />inch-long deck or wood screws installed on 6-inch centers around [lie circumference of the <br />opening. An interior or exterior 2x4 Bottom Brace is required to prevent it from opening and <br />drilled to the floor with masonry screws (or as appropriate). <br />NOTE: These specifications are subject to change upon case by ease scenario. Any changes or <br />recommendations shall be discussed during the walk-through of the property prior to a <br />proposal, quote and or notice to proceed. <br />City of Santa Ana RFP 17-06T___ — --- <br />Page Al-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.