My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SANTA FE BUILDING MAINTENANCE (2) - 2017
Clerk
>
Contracts / Agreements
>
S
>
SANTA FE BUILDING MAINTENANCE (2) - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2019 8:42:42 AM
Creation date
9/28/2017 3:43:05 PM
Metadata
Fields
Template:
Contracts
Company Name
SANTA FE BUILDING MAINTENANCE
Contract #
A-2017-240
Agency
POLICE
Council Approval Date
9/5/2017
Expiration Date
9/30/2020
Insurance Exp Date
12/15/2019
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Re -Waxing Vinyl & Tile Floors: If there are black marks„ marks from chair glides, or imbedded <br />soil in the finish, they shall be removed before re -waxing. A uniform coat of approved floor finish <br />shall be applied. After the finish has dried, the appearance shall be uniform with. no visible stress <br />marks, swirls, etc. Remove all stripping or detergent solution from the baseboards, door, or other <br />non -floor surfaces and in adjacent spaces, <br />Carpet Cleanina: Carpet cleaning is usually done on a quarterly basis, coordinated through. the <br />Police Administrative Manager to determine exact cleaning locations. Care shall be taken to insure <br />the carpet is thoroughly cleaned and dry prior to opening the area rip to foot traffic. <br />Cleaning,/wipe-down of Vehicle Storage Lockers: <br />dirt, or debris. Care shall be taken not to spray an <br />lockers through the open slots. <br />HI-ANMJALLY <br />y <br />th Wipe down e outside lockers of any dust, <br />cleaning solution or water directly into the <br />Window Cleanin : Completely remove dust, cobwebs, smudges, tapes, oil film acid other types of <br />soil from all interior windows and partitions. Remove drip and splash marks from all adjacent <br />surfaces. Glass in open space and office partitions, entry glass doors and entry area glass panels are <br />included in this project (including police facility & .fail facility). The two (2) atrium skylights in the <br />ceiling of the police facility, Community Room and Lunchroom skylights, and the exterior of the <br />facility windows are not included in this project. <br />AS NEEDED <br />Strin and, Refinish Tile Floors (as needed): All non -fixed furnishings such as tables, chairs, desks, <br />trash receptacles, storage containers shall be removed prior to stripping unless exempted by the City. <br />Remove all removable amarks, heel marks, scuff marks, rust stains, gum and other types of stains and <br />soil, Manual scrubbing devices shall be used m areas inaccessible to the floor mach¢1e. <br />Stairwells: As needed clean/mop the four cement stairwells located at each corner of the PD <br />Facility. <br />Dusting and cleaning of other areas as rearrested: there are several mobile shelving units <br />throughout the Administration building that may require dusting as requested by supervisor. <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.