My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - AMEND ZONING 2001 W MACARTHUR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
10/03/2017
>
75B - PH - AMEND ZONING 2001 W MACARTHUR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2017 5:09:37 PM
Creation date
9/28/2017 4:44:55 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75B
Date
10/3/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9.4 VICONN6Niµ.I51YA4t Y[YopT Aop[NDVM <br />96 YTP.N SCR i41T" - - <br />.Ap NS4R DNC RANCH RRVSpp -Ypo NC'r' <br />SANTA ANA. GALE, OMNIA <br />2.11 NITNERAL. RESOURCES <br />New <br />More NO su6r[aut at <br />fY0lilP (1. CP <br />Si¢nlaoipi <br />.'sole" chauge'from <br />-ImpaYl <br />- <br />Impnir <br />NIc ionsAnldi4ls <br />ed on "a lnc5. ganeial plan, spec fie I ❑ . ❑ ®.. <br />Analysis of Projeef Changes: <br />a) According to die Ciiy'of Santa Aria Cencral Plan, land Use Element(1:998), there are no mineral <br />extraction activates eurrentiv.occutrhig within the City. In addition, according to the Land Use <br />Element, there are no.Significant 1vlincral,Agt,�rcgate Resource Areas (SrVlizA) Designations. <br />Therefore,,the Revised Project would not impact known mineral resources and iio mitigation is <br />required. <br />'I'lre Certified ElWalsoxoncluded that the Approwd Project voitld not result in impacts to <br />tnineral resources because no mineral resources are pregeit:on the Projccl site that are considered <br />Wally, orregionally important. Therefore, the Revised:'Proic& would not result lnnew significant, <br />iinpacts beyond those identified in the Certified EIR and no new mitigation measurus are <br />required. <br />Mitigation Measures:11 <br />No mitigation is required.; <br />Findings Related to Mineral Resources: <br />No New Significant Effects Requiring Major Certified FIR ,Revisions, based on the foregoing <br />analysis and information, there is no evidence'that project modifications require a major change to the <br />Certified E1R. The project changesmi11 not result in new significant environmental impacts related to <br />Mineral Resources, and there_ is substantial increase in the severity of impacts dcsia bed in the <br />Certified EIR. <br />No Substantial Change in _Circumstances Requiring Major Certified -FIR Revisions. There is no <br />information in the record or otherwise available that indicates that there are substantial changes in <br />circumstances pertaining to Mineral Resources that would require major changes to the,Certified EIR.; <br />No New Information Showing Greater Significant Effects than the Certified EiR. This <br />Addendum has analyzed all `available relevantiufor n ition In dcLiirminc whether there is new <br />information that was not available at thetimedie BIR was adopted, -which would indicate th'afa new <br />sigmificant effect not reported in thatdocuinent might occur. Based on the information itIad itnalyses <br />abtiVe, there is no substantial new information indicating that there would be a new significant impact <br />related to IOineraf Resources requiringtnajor revisions to the Certil (A EiR. <br />P(S41(Q167d'ylddentlumiAdJ�n�Innvc4cA��LlHlU5r7 �a� <br />75B-100 <br />2-5 t <br />
The URL can be used to link to this page
Your browser does not support the video tag.