My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - AMEND ZONING 2001 W MACARTHUR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
10/03/2017
>
75B - PH - AMEND ZONING 2001 W MACARTHUR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2017 5:09:37 PM
Creation date
9/28/2017 4:44:55 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75B
Date
10/3/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6NYJXONMGNTAL IMPAOS REPORT ADDENDUM ARMATRONG AAU411R8VIlaU PDOJRCT <br />31FTCMDER 311: SANTA ANA. CALIFORNIA. <br />2.14 PUBLIC: SERVICES <br />New <br />Mare <br />No SuLitmthl <br />slgldaroRt <br />Severe <br />chnD;Ctronr <br />Would Me project: <br />Impart <br />I.P110 <br />A.A N. <br />(a) Would the project result in substantial adverse physical impact's <br />associated with the provision of or need for new or physically <br />all crud govcrrnnental frreilitivs, the construc(i(;i-of which could <br />cause significant environmental impacts,in order to maintain. <br />acceptable service ratios, response times or other performance: <br />objectives for any of the public wrvievs: <br />i) Fire' Protection? <br />❑ <br />❑ <br />ii)Police Protection? <br />-N <br />iii Schools? <br />u <br />iv) Narks? <br />❑ <br />❑ <br />v Other public facilities? <br />Analysis of Project. Chan. -es: <br />a) (i) The Revised Project is a.residential community, which would increase the number of on-site <br />ttisitors and personnel, however, tate addition of 42 single family residential units as a result <br />of the proicot would result,in' a stnall increase in demand for fire protection services, <br />particularly as compared to the I56 residential units and church uses included as part of the <br />Approved Project. The increase in demand would no't iubstatitially affect level of service <br />ratios or response times of fire: protection services. No new. or altered fire facilitie's would be <br />required to accommodate -the Revised pr9ject.'1'1te Certified EIR also concluded that the <br />Approved Project -would notsubstantially affect level of service ratios for ft -o protection and <br />would not increase response times. Therefore, the Revised Project would not resuh in new <br />significantintpacts beyond those identified in the Certified MR. No new mitigation measures <br />are required. <br />(ii) As previously stated in Section 2,12, Population and Housing, the Revised Project would <br />introduce 1$5 pci5ons into the.Pr6jeef site compared to the Approved Project. When <br />compared to'the Approved Project and the City's 2016 population of 334,217 and projected <br />population of 343,100 in 2020, the Reviscd Project would result in a small increase in <br />demand for police protection services which would not substantially affect police level of <br />service ratios or response times. The Certified FIR also concluded that the Approved Project <br />would not substuraiidly affoet level orservice ratios, that response times would not <br />measurably increase, and that City Police staff would be sufficient to respond to the needs of <br />the Approved Project. The Revised Project would not result in naw significant impacts <br />beyond those' identified in the Certified FIR. No new mitigation measures are required. <br />(iii) The Revised Project would restill in the dcvclopment,'61742 single family residential units. <br />Using the generation rule of 0.995 students per dwelling unit as identified in the Certified <br />EIR, the Revised Project would result in the addition of approximately 42 students into the <br />Santa Ann Unified School District (SAUS17). Comparatively, the Certified FIR concluded <br />that the 156 residences included us part of the Approved Project would have resulted in the <br />addition of 155 students to'the.SAUSD. The Certifled EIR determined that because the <br />SAUSD ivas already over -crowded, the Approved Project's impacts relined to the demand on <br />fast W IEU4'mlddctutumSAddcndum.Jucr m:H,VS!I: h <br />75B-109 <br />2-60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.