My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - AMEND ZONING 2001 W MACARTHUR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
10/03/2017
>
75B - PH - AMEND ZONING 2001 W MACARTHUR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2017 5:09:37 PM
Creation date
9/28/2017 4:44:55 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75B
Date
10/3/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a MV I kONMTNTAL IMI'AOr %FP09T AD Oa NONM Ak]ISTko NC RANCIr YEvt52O Pk Otk CT <br />SANTA ANA', CALIYOAHIA <br />86Y'raMMZK SOLI <br />Rcvfsui Projeti would not result in nesv significant impacts beyond those identified in the <br />Certified FIR. No new mitigation measuresare required, <br />Natural Gas: The Certified EIR concluded that the Approved Project would connect to <br />existing gas pipelines serving lhe-Projact site and that gas scrdicc could be adequately <br />provided to the Project site based on existing supply. The Revised Project includes the <br />development of42 single-familydwclling units on the Project site and a reduction is square <br />footage of the church campus. Natural Gas supplies in California are not constrained and it is <br />assumed that the Revised Projct would incorporate Title 24.!California Green Building Code <br />requirement to ensure that the Rcyised Project would noi'resultin inetficient,:wasteful mmd!'or <br />unneecssaryconsumption Of natural gas. Compliance with Title 24(CaliforniaGreen Building <br />Code requirements would reduce impacts to natural gas to less than significant. The Revised <br />Prcjaa would not result in new significant impacts beyond those identified in the Certified <br />FiR: No new mitigation measures are required. <br />Telephone. The Certified EiR cuncluded that Pacific Bell would be able to accommodate the <br />ApprovW,Project's demand for telephone and interact scryjees and that the Approved Project <br />would not adversely affect facilities or senticc. Consequently, the Certified EIR determined <br />that telephone utilities would not exceed available capacity. The Revised Project includes the <br />developriuent ot'42 single-family residential units and would be significantly smaller than the <br />Approved Project. The Project site islocated in an area currently served by all utilities-, it <br />assumed that a major.telephone carrier would be able to provide telephone service to the <br />residential units and to continue to provide telephone service to the church campus. <br />Therefore, impacts related to telephone service would be less. than significant. The Revised <br />Project,would not result in new significant impacts beyond those identified in the Certified <br />EIR: No new fiiitigation nfeastu6s are required; <br />Libraries. 11ie City is served by the City's Public Library System. The closest library within <br />the Santa tltia Public Librate System, to the Project site is the Newhope Library located at 26 <br />Civic Center Plaza. The Newfiopc Library currently includes a, computer lab available to <br />adults and high school students, a youth computer center, a space for teens; and book <br />materials. <br />As discussed above, development of the Revised Prt?jectwould result in an increase of an <br />estimated 185 new residents. Although implementation ofthe Revised Project would causeun <br />incremental increase in demand for library facilities; this increase would be minimal, and <br />impacts to library facilities would be less than significant. No mitigation would be required, <br />Therefore, the Revised Project would not result in new significant impacts beyond those <br />identified in the Certified-EIR. No new mitigation measures are required. <br />l41idgation Measures: <br />Based on the analysis and information above, Mitigation Measures PS -1 and PS -2 included in the <br />Certified EIR for the Approved Project would be applicable to the Revised Project. However, these <br />measures have been revised as follows to reflect current requirements. 'These changes tiro shown in <br />underline below. <br />I'.'•51101!+�ib1J3c;u:mnti;\dJt'M{���n.dock 109A5i 1?n <br />75B-111 <br />2-62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.