My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - AMEND ZONING 2001 W MACARTHUR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
10/03/2017
>
75B - PH - AMEND ZONING 2001 W MACARTHUR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2017 5:09:37 PM
Creation date
9/28/2017 4:44:55 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75B
Date
10/3/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMYNTAL1MPA01''NtYONT AUUYNVUN ARMSTRONG RAMI REVISED PROJECT' <br />SEr'rENnSR.Y01]` SANTA AN ,-CALIPORNTA <br />c) \o unique.geolpgic featines are present on the Project site; therefor e, the Revised Project would <br />not result in the loss ofla unique geologic feature.and no mitigation is required, The Certified EIR <br />alsodid not identify any unique geologicfeatures on the Project site. Therefore,.the.Revised <br />Project would -not result in new significant impacts beyond those identified in the Certified E1R- <br />No new mitieation measures are required. <br />it) Asstaled above in Response 2.6..n.iv, there are no existing landslides or potential for landslides <br />on the Project site. Therefore, theReAsed,Project'would not expose people or structures to <br />advcisceffcicts involving landslide's and no mitigation.is required. As stated abo' cin Response <br />2AJi.iii, the Piclimihary Gcolechnioal Investigation Report,prepared for the Certified _EIR <br />concluded that there is a low probability of lateral spreading, non -seismic related differential <br />compaction, collapse, or liquefaction,to occur on the Pruiect site. Therefore, impacts related to <br />lateral spreading would be less than significant and no mitigation is required. The Preliminary <br />Gcowc hnical Investigation Report prepared for the Certified EIR also concluded that there is a <br />low probabilityof nun seismic-relatucl,differential compaction to occur on the Projct site. <br />The PrelintinaryGcolcchnical Investigation Report prepared fortis Certified EIR indicted that <br />soils oil thNPro-ject site have a moderate potential for. cxpani iup. in addition, on-sitic soils may be <br />severely corrosive when wct. Thercrprc, there is a potential for the Revised Project tolii: affc4:tcd <br />by -strata or soil thatareor that would become unstable. The -Revised Projectwould be <br />required to. comply with Mitigation MeasuresGEO-1 through GEO-4 from the.Certitied EIR. <br />Mitigation Measure GEO-1 requires preparation of a final design geotechnical report and <br />compliance with recommendations of the final design geotechnical report: Mitigation Measure <br />GEO-2 requires compliance With the California Building Code, which stipulates appropriate <br />seismic design provisions that shall be inmlentented with design and. construction of the Revised <br />Project, Mitigation Measure GE0-3'requires sufftcientreinforcement of building fotting"s to <br />mitigate -for impitctsrelated to expnnsi��e soils, Mitigation.Measitre Glib -4 requires that,a <br />registered gcologiSL ensure that thatproject adheres to the recumtttendations or the final -design <br />gcotcchnical report, hnplementaiion of Mitigation Measures GEU-1 through GE6-4 would <br />reduce any potential impacts relatui to unstable soils to a lass than significant level. The Certified <br />EIR also concluded Mitigation Measures GFOA through,GFO.4 would reduce irnpaels relined to <br />unstable soils to a less than significant level, Therefore, the Revised Project would not result in <br />new significant impacts beyond those identified in the Certified EIR. No neve mitigation measures <br />are required. <br />e) Similar to the Approvcd Projcct, the Revised Projcct d6eq not include construction of or <br />connections to septic tanks or alternative wastewater disposal systems. Therefore; the Revised <br />Project would not result in impacts related to the soil's capability to adequately support the use of <br />septic tanks or alternative wastewater disposal systems, and no mitigation is required. Therefore, <br />the Revised Project would not result in now signifieaut impacts beyond those identified in the <br />Certified PTR. Therefore, pursuanl.lu,S1ate CEQ.4 Cruielcli ies Section 15162, the City may elect <br />to prepare an, Addetidum to the FIR. <br />I'ASI 1016045AJdrndum'�lddendu..,Iuux 4Y911)i47o <br />75B-81 <br />a-32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.