My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - AMEND ZONING 2001 W MACARTHUR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
10/03/2017
>
75B - PH - AMEND ZONING 2001 W MACARTHUR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2017 5:09:37 PM
Creation date
9/28/2017 4:44:55 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75B
Date
10/3/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RNYIRONVENTAL ndTAPT. xIPURT AU VYNDUN ARSISTRONO. RANCID RRYI8L0 PROJRCT. <br />RR ITEUM Sol? SANTA. ANA, CALIFORNIA <br />ora Storm water P.oi <br />management practice <br />but not be limited iii, <br />ana retain scotmem on <br />of"construction debris 1 <br />1Ps)-during construction ac(i <br />on Control and 'Sediment Cc <br />and Good Housekeeping B <br />waste.into receiving waters.. <br />best <br />- <br />d include; <br />leaks; and <br />The Revised Project would be required, to obtain coverage under the Construction General Permit. <br />The ConstructionGenertil Permit requires -prep ration of an SW11PP and implementation of <br />construction BMPs detailed in the SWPPiI, during construction activities. <br />Pollutants ofconcerti'during operation of the Revised Project include suspended solids/sediment, <br />nutrients, padiugcris Nuteriahiius),'pegticides, oil andgrease,'and tmsh'and debris. The southern - <br />portion or the Project site 15,currenily pervious; therefore, the Rev- isedl Project would increase <br />impervious surface area wouldi increase mnoff`from the Projectsite and increase pollutant loading <br />to -downstream receiving waters, The Revised Project would comply with the requirements <br />Orange County Municipal Separate ;Storm Sewer System (NI84) Permit and Drainage Area <br />Managementrplan (DAMP). A Nater Quality Managyment Plan (NN•QMP) would be prcpumd for <br />the Revise-a'Project consistent with the requirements of the Model WMP and Technical <br />Guidance Document: The WQMP would si cciry the Site Design, Sourec Control;.and Low <br />impact Developmenc,,(LID) BMPs tliat would be impletnented totargcl pollutants ofconeern'in <br />"runoff from the Project site to reduce impacts to water quality during•operation. With <br />implementation and maintenance ofpost-construction BiAr's that target pollutants of concern in <br />stormwnterrmof, ,, and compliance with the requirements'of the MS4 Permit, operational impacts <br />related to waste discharge requirement and water quality "standards would be less than significant:. <br />In summary; with implementation of Mitigation Measures GEO 5: and GEO-G, water quality <br />impacts of the Revised Project would be reduced to a less than significant level. 'The Certified <br />LIR also concluded that Mitigation'Mleasures GEO-5'and 080-6 would reduee water quality to a <br />less than significant level. Therefore, the lterased Project would not result hi new,significant <br />impacts,heyond those identified in the Certified SIR. No new mitigation measures are required. <br />b) Groundwater on the Project site was oneomitered'at depths ranging from 13 to 2'7 feel below <br />ground surfice;(bgs) dluringboring-conducted as part of theTreliminary Geotechnical <br />Investigation Report.p'repared forthc Certified EIR. Thertfon%, it is unlikely that groundwater' <br />would be cii"comntercd during construction of the Revised Project and groundwater dewatering <br />would not be required. The Revised Pnijectwould not require biround wafer extraction during <br />operation, TheRevised.Projcet would increase impervious surface area on the Project site which <br />would decrease infiltration. However, on-site soils have low,pemnuability and are not conducive <br />to infiltrationor groundwater recharge in the existing condition: Therefore, the increas .in <br />impervious surface area would not.substmrtially alter fnoundwatcrrecharge, in addition, the <br />Project site is: not in a groundwater recharge area. For ihpse rcasons; impacts related to depletion <br />of groundwater Rupp lies or interference with groundhvater re6argedunng conslrgotion operation <br />of the ApprovedErojecr mould hc_ Ie9s than signiGoanl Anil no.iriitigation is required, The <br />Certified 1 IR also concluded that the Approved Project would haw a less than signifwant impact <br />ED groundwafer supplies and recharge. Therefore, the Revised Project would noCresult in new <br />significant impacts beyond thoseidd'ntified in the Ccriifiui ETR. No new mitigation measures are <br />required. <br />p;5911016,,(,4'' NddendiimlAddundum,ducx QWUS.47u <br />75B-93 <br />z-44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.