My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NICHOLS CONSULTING ENGINEERS (NCE) (2) - 2017
Clerk
>
Contracts / Agreements
>
N
>
NICHOLS CONSULTING ENGINEERS (NCE) (2) - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2020 11:56:03 AM
Creation date
11/20/2017 11:25:11 AM
Metadata
Fields
Template:
Contracts
Company Name
NICHOLS CONSULTING ENGINEERS (NCE)
Contract #
A-2017-290
Agency
PUBLIC WORKS
Council Approval Date
10/17/2017
Expiration Date
10/16/2019
Insurance Exp Date
5/17/2020
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Input pavement distress data into the City's database and calculate Pavement Condition <br />Index (PCI) for each segment utilizing the latest version of StreetSaver software. The <br />consultant shall keep a log of any discrepancies between the database information (i.e. <br />surface type, etc.) and actual field conditions, and shall coordinate with City staff to <br />correct the database as necessary. Corrections/changes to the database shall not be made <br />without prior City staff approval. <br />Task 1.3 - Budgetary Analysis <br />Forecast future PCI values for each segment and create OCTA-required budget scenarios <br />for each network utilizing the latest version of StreetSaver software. The consultant shall <br />coordinate with City staff to develop a 7-year maintenance & rehabilitation strategy <br />(including but not limited to selecting segments, treatment type, costs, and year of <br />implementation). <br />Task 1.4 - Final Report (Optional Task) <br />The consultant shall prepare a final Pavement Management Program report and any other <br />required submittal items, as per OCTA guidelines. The report shall include, without <br />limitation, the methods, findings and recommendations of the consultant, which shall be <br />presented in a single comprehensive document which, should include findings generated <br />as part of other tasks described herein. <br />Local Street Network <br />Task 2.1- Management and Administration <br />See Task LI above. <br />Task 2.2 - Pavement Condition Surveys <br />See Task 1.2 above. <br />Task 2.3 — Budgetary Analysis <br />See Task 1.3 above. <br />Alley Network (Optional Task) <br />Task 3.1- Management and Administration <br />See Task 1.1 above. <br />Task 3.2 - .Pavement Condition Surveys <br />See Task 1.2 above. <br />Cfty of Santa Ana RFP 17-p92 <br />Page Al-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.