My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NETFILE, INC. 2 - 2017
Clerk
>
Contracts / Agreements
>
N
>
NETFILE, INC. 2 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2018 11:56:39 AM
Creation date
12/19/2017 10:34:13 AM
Metadata
Fields
Template:
Contracts
Company Name
NETFILE, INC.
Contract #
N-2017-252
Agency
CLERK OF THE COUNCIL
Expiration Date
10/31/2018
Insurance Exp Date
2/11/2019
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
request must be in writing and the Contractor has 21 working days to complete the deletion of <br />the data from the system. <br />25. NOTICES <br />All notices to the Parties shall, unless otherwise requested in writing, be sent to City addressed as <br />follows: <br />Clerk of the City Council <br />City of Santa Ana <br />20 Civic Center Plaza (M-30) <br />P.O. Box 1988 <br />Santa Ana, CA 92701 <br />And to Contractor addressed as follows: <br />NetFile <br />2707 Aurora Road <br />Mariposa, CA 95338 <br />or by facsimile at (209) 391-2200 <br />26. HOSTING SERVICES <br />a. Availability of Services. <br />Subject to the terms of this Agreement, Contractor shall use its best efforts to provide online <br />access to the City and filers of FPPC forms for twenty-four (24) hours a day, seven (7) days a <br />week upon completion of the parsed database and accepted by the City and thereafter, <br />throughout the term of this Agreement. City agrees that from time to time Contractor's servers <br />may be inaccessible or inoperable for various reasons, including: (i) equipment malfunctions; (ii) <br />periodic maintenance procedures or repairs which Contractor may undertake from time to time; <br />or (iii) causes beyond the control of Contractor or which were not reasonably foreseeable by <br />Contractor, including interruption or failure of communications or transmission links, hostile <br />network attacks or other failures (collectively "Downtime"). Contractor shall provide forty-eight <br />(48) hour advance notice to City in the event of any scheduled Downtime. Contractor shall use <br />its best efforts to minimize any disruption, inaccessibility and/or inoperability in connection with <br />the Downtime, whether scheduled or not. In the event of any Downtime, City shall be entitled to <br />a pro -rata reduction of any payments due and payable to Contractor for such period. <br />b. Backups <br />Contractor shall maintain backup servers and telecommunications connections and <br />maintain weekly backups of City's database of FPPC Form filings on such backup servers. <br />
The URL can be used to link to this page
Your browser does not support the video tag.