My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
USS CAL BUILDERS, INC.
Clerk
>
Contracts / Agreements
>
U
>
USS CAL BUILDERS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2018 1:40:39 PM
Creation date
1/10/2018 10:44:17 AM
Metadata
Fields
Template:
Contracts
Company Name
USS CAL BUILDERS, INC.
Contract #
Various
Agency
Public Works
Council Approval Date
9/5/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FACTORY ACCEPTANCE TESTING PLAN <br />Items needed for testing include: <br />• Keys for each equipment type <br />• Laptop with Domgar access for viewing the Control Center <br />• License Plates <br />• Valid Credit Cards of Each Type (MC, AMEX, VISA) <br />• NFC Payment Type <br />• Invalid Credit Card <br />• Expired Credit Card <br />• Proximity Cards <br />• AVI Tags <br />• ADVAM OR Codes for each scenario <br />• Validations of each type (Chaser, eVal, OR code) <br />• Cash for POF Transactions <br />FAT Test General Procedures <br />Testing will begin with a physical examination of the components to ensure they are without damage and in <br />working order. Sentry representatives and XXXXXrepresentatives will complete the test scripts as the test <br />progresses with the lane ID and other pertinent information. Any deviations or items of note will be recorded In <br />the comments field. All deviations will be documented, corrected, and re -tested if necessary. Each transaction <br />will be recorded In the FAT Transaction Log to aid in reconciliation during the reporting portion of the FAT. <br />The test procedures identify the user functionality to be tested as listed In the functional specifications. An <br />indication of "Pass", "Fail", or "Deviation" will be recorded In each step of the respective test script. If a function <br />performs as designed but the test script is incorrect, both parties agree to modify the script as long as the <br />specified function works as required. Minor deviations are not to be considered grounds for failure of the FAT. <br />Major deviations found during the FAT will result in the retest of the respective equipment, software, or <br />subsystem before the FAT is considered successfully complete. <br />Minor deviations are defined as any deviation that does not affect system functionality, fee calculation accuracy, <br />transaction count accuracy, exception count accuracy, transaction processing, credit card processing, or <br />calculations. Major deviations are any failures that do affect system functionality, fee calculation accuracy, <br />transaction count accuracy, exception count accuracy, transaction processing, credit card processing, or <br />calculations. <br />Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.