Laserfiche WebLink
Appendix <br />ATTACHMENT 1 <br />SCOPE OF WORK <br />CITY OF SANTA ANA <br />REQUEST FOR PROPOSALS <br />FOR <br />FOUNTAIN MAINTENANCE <br />RFP NO.: 17117 <br />Description of Work <br />Exhibit A <br />The Contractor shall furnish all labor, vehicles, chemicals, tools, materials, equipment, transportation, and <br />supervision, except as specified herein as City furnished, to manage and perform maintenance and minor repairs <br />of the fountains identified below: <br />Fountain <br />Location <br />Service Per Week <br />Plaza of the Fountain #1 <br />North of State Building <br />3 Times <br />Plaza of the Fountain #2 <br />East of Law Library <br />3 Times <br />Plaza of the Fountain #3 <br />South of Law Library <br />3 Times <br />Plaza of the Sun Fountain <br />Between City Hall and Main Library <br />3 Times <br />Sasscer Park Fountain <br />Corner of Santa Ana Blvd. and Broadway <br />3 Times <br />V Street Mall Fountain <br />Between Sycamore St. and Broadway <br />3 Times <br />Santa Ana Regional Transportation Center <br />Civic Center Drive and Santiago Street <br />2 Times <br />Responsibilities Included. Fountain maintenance and repair services covered by this specification include the <br />tasks shown in the table below. <br />Fountain Maintenance & Repair <br />(where applicable <br />work shall be performed routinely per manufacturers specifications) <br />1 <br />Maintain pumps <br />2 <br />Maintain pum motors <br />3 <br />�4 <br />Maintain all p mbing i.e. piping, couplings, and fittings <br />Maintain and utilize chlorine and metering(monitorin m e ui W <br />5 <br />Maintain filters <br />6 <br />Maintain fountain nozzles free of debris. Replace when spray pattern deviates from intended <br />desi n <br />7 <br />Maintain valves <br />Routine Maintenance and Operation To Meet All O.C. Health Department Requirements <br />8 <br />Test and adjust the chlorine and other chemicals levels in the water. <br />9 <br />Test the pH level in the water <br />10 <br />Add acid or soda ash as necessary to adjust pH level <br />11 <br />Provide all supplies e, ., chemicals, testers) <br />12 <br />Re lace carbon dioxide gas cylinders when empty and without interru tion to system operation <br />13 <br />Em ty strainer(s) (interceptor basket), skimmers and screens <br />14 <br />Shock treat when required to maintain water free of algae <br />15 <br />Vacuum and clean fountain <br />16 <br />Adjust water level <br />17 <br />Test and re lace underwater li hts as outa es occur. <br />City of Santa Ana RFP 17.117 <br />Page 10 <br />