SIEMENS, INC - 2017
Clerk
>
Contracts / Agreements
>
S
>
SIEMENS, INC - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2018 3:21:00 PM
Creation date
2/7/2018 2:43:00 PM
Metadata
Fields
Template:
Contracts
Company Name
SIEMENS, INC
Contract #
A-2017-289
Agency
POLICE
Council Approval Date
10/17/2017
Expiration Date
11/8/2020
Insurance Exp Date
1/1/1900
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit B-9: MSA with Siemens <br />and City of Santa Ana <br />SIEMENS <br />INR,Cc,tni{y �vr (t:�e <br />City of Santa Ana - Detention Center <br />6o Civic Center Drive <br />Santa Ana, CA <br />Change Order for Adds/Deletes Changes <br />Project Name: City of Santa Ana Detention Center <br />November 14, 2o16 <br />Project Summary: During the course of the project there was additional workperformed, <br />changes to equipment provided and minor scope changes. In order to accurately capture <br />equipment listed for warranty purposes and additional costs, the following items detail the <br />changes to our base scope of work. <br />Engineering labor to convert pdf electrical drawings into Autocad format in order <br />to provide a working set of security drawings ....... $5,500.00 <br />Additional conduit work including labor and materials for such work. Original <br />scope included minimal new conduit (estimated 400') and reusing existing, <br />however during the installation we found a majority of the existing was unusable. <br />New conduit was required for the laundry room cameras, Interview rooms, <br />conduit for PD parking lot entrance camera, as well as 4th floor sectors i and i and <br />Pods A, B, C & D and to complete the wire paths at the exercise rooms and in <br />between the water risers by the cells. We furnished and Installed approximately <br />another 400' of conduit & 40 additional wall penetrations with conduit sleeves <br />and fire caulk ... ... $16,938.00 <br />416 It was identified at the beginning of the installation that 7 Tripplite UPS and 4 <br />Black Hawk Lab racks were not required as the racks in the OF rooms had space <br />for our equipment and there was UPS's recently added. We removed them from <br />the scope and it was requested that we provide a Cisco Smartnet i Year Warranty <br />for the Cisco switches that were being installed. Credit for removed <br />equipment... $(12,087.00) <br />4, Provided Cisco Smartnet t year Warranty on the new Cisco switches... $7,130.00 <br />4- Add 4o external microphones to the Mods. In order to accommodate the <br />external microphones, we needed to return 35 of the Axis P3225 cameras and <br />replace them with 35 P3365 cameras which had the ability to integrate the <br />microphones into the system. Note, 5 of the cameras installed in those areas were <br />of the correct type already so they were able to be used....$11,z8y.oc <br />4. Furnish fiber connectors and labor to trace, polish, terminate and test existing <br />fiber throughout the jail IDF's in order to connect all network <br />switches... $4,586.06 <br />SOW Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.