My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENTERPRISE AUTOMATION (2)-2018
Clerk
>
Contracts / Agreements
>
E
>
ENTERPRISE AUTOMATION (2)-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 6:18:25 PM
Creation date
3/12/2018 11:07:46 AM
Metadata
Fields
Template:
Contracts
Company Name
ENTERPRISE AUTOMATION
Contract #
A-2018-024
Agency
PUBLIC WORKS
Council Approval Date
2/6/2018
Expiration Date
5/5/2021
Insurance Exp Date
11/13/2019
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENTERPRISE <br />A OMATION <br />Enterprise Automation <br />210 Goddard Irvine CA 92618 USA <br />Tel 949-769-6000 Fax 949-769.6006 <br />w ,ealnt9urator.cog? <br />2. Functional Specification Development: <br />a, Functional specification production <br />b. Functional specification review workshop <br />7.5.1 Preparation <br />The purpose of this phase is to develop a strong understanding of the existing site. <br />EA will leverage this information to provide recommendations for hardware, <br />controls, standardization, and operation upgrades, which will be incorporated into <br />the panel design and functional specifications. <br />7.5.1,1 Site surveys <br />EA will inspect and document the condition of the controls at the existing facilities <br />and catalog the existing controls hardware. Per the RFP, an allowance of one 8 <br />hour day for 2 EA engineers has been provided for each site. We believe that 2 <br />engineers are necessary in order to capture all the information needed and to <br />reduce the risk that something is overlooked or forgotten. <br />The RFP requires that the integrator catalogue all existing controls and <br />equipment. It will also be necessary to collect several key documents related to the <br />site including; <br />1. Cut sheets <br />2. Equipment manuals <br />8. Panel designs <br />4. Electrical plans <br />5. Construction plans <br />6. P&IDs <br />7. Operations documentation <br />EA anticipates that collecting these documents (which should they exist, may or <br />may not actually be located at the site) will take additional effort that is not <br />included in the City's site visit allowance. lMeadditionale b2tia of dludedin <br />the Fee pmpossv <br />Client City of 1.0.0 <br />Document: Response to RFP 1 7- 112 Date: 1112112017 <br />$eCUOM Scope of Services & Schedule Pane Number 16 of 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.