My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
VOLTAIC-2018
Clerk
>
Contracts / Agreements
>
V
>
VOLTAIC-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2022 12:16:25 PM
Creation date
3/12/2018 1:11:59 PM
Metadata
Fields
Template:
Contracts
Company Name
VOLTAIC
Contract #
A-2018-026
Agency
FINANCE & MANAGEMENT SERVICES
Council Approval Date
2/6/2018
Expiration Date
1/31/2023
Destruction Year
2028
Notes
CTRAX
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OLTAIC <br />Project #:73-727,4 <br />Corporate Yard — General Parking <br />Location: 215 South Daisy Avenue <br />Santa Ana, CA 92703 <br />NJPA #: 051017 -CPI <br />CHARGING I)NITMOUNTINGTYPEIS): WALL <br />TOTAL# OF PARKING FOR EV; Two (2) <br />Price Breakdown: <br />Electrical/Construction, Labor and Material $10,393.00 <br />EVCS Unit(s) and Service(s) $6,848.00 <br />Total Price: $17,241.00 (tax included) <br />Electrical/Construction, Labor and Material Includes: <br />• Proposal consists of project management and site planning, engineering and designing for any necessary <br />permit acquisitions. <br />o Permit acquisitions also include the plan checking, and inspection processes (not including <br />actual plan check fee, permitting and/or inspection fees) as required by the authorities having <br />jurisdiction. <br />• Perform Site Validation survey (SVS) as required by ChargePoint, Inc, prior to activation of units. SVS fee <br />to ChargePoint, Inc. discounted when using ChargePoint, Inc. Certified Installers. <br />o Standard electrical power consistency evaluation: circuit breaker and electrical panel evaluation. <br />o Cellular network communications test: test for consistency of cellular signal strength. <br />o Charging station evaluation: consistent voltage, amperage, ground, network communication. <br />ELECTRICAL EQUIPMENT UPGRADE <br />• None. <br />o Use two (2) available spares in existing electrical panel "PA" <br />CHARGING UNIT INSTALLATION <br />Installation and commissioning of one (1) charging unit to meet NEC requirements. <br />Supply and installation of one (1) 40A circuit breakers for EVCS overcurrent protection. <br />o Utilization of existing electrical panels to supply one (1) 30A circuit to new charging unit. <br />o From the electrical panel(s) to new charging stations, the new electrical conductors: #6 and #10 <br />ground wires. <br />-3- <br />Vdeo Vorce flat. Cnmmurl,ra6bn, Joltar Disc Ion Q6°S Pdld `Drive hard n Grove CA 9; 917 Pruit 01111 .anuary 17 + <br />
The URL can be used to link to this page
Your browser does not support the video tag.