My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
VOLTAIC-2018
Clerk
>
Contracts / Agreements
>
V
>
VOLTAIC-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2022 12:16:25 PM
Creation date
3/12/2018 1:11:59 PM
Metadata
Fields
Template:
Contracts
Company Name
VOLTAIC
Contract #
A-2018-026
Agency
FINANCE & MANAGEMENT SERVICES
Council Approval Date
2/6/2018
Expiration Date
1/31/2023
Destruction Year
2028
Notes
CTRAX
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
:VOLTAIC <br />Santa Ana Regional Transportation Center <br />Location: 1000 Santa Ana Blvd <br />Santa Ana, CA 92701 <br />NJPA #: 051017 -CPI <br />CHARGING UNIT MOUNTING TYPE(S): BOLLARD <br />TOTAL# OF PARKING FOR EV: Two (2) <br />Price Breakdown: <br />Electrical/Construction, Labor and Material $7,443.00 <br />EVCS Unit(s) and Service(s) $7,355.00 <br />Total Price: $14,798.00 (tax included) <br />Electrical/Construction. Labor and Material Includes: <br />Project #:73-727.4 <br />Perform Site Validation survey (SVS) as required by ChargePoint, Inc. prior to activation of units. SVS fee <br />to ChargePoint, Inc. discounted when using ChargePoint, Inc. Certified Installers. <br />o Standard electrical power consistency evaluation: circuit breaker and electrical panel evaluation. <br />o Cellular network communications test: test for consistency of cellular signal strength. <br />o Charging station evaluation: consistent voltage, amperage, ground, network communication. <br />ELECTRICAL EQUIPMENT UPGRADE <br />• None <br />o Using existing house meter panel located outdoor. <br />CHARGING UNIT INSTALLATION <br />Installation and commissioning of one (1) charging unit to meet NEC requirements <br />Use existing 40A circuit breaker for EVCS overcurrent protection. <br />o Utilization of existing electrical panel to supply 30A circuits to new charging unit. <br />o From the electrical panels) to new charging stations, the new electrical conductors: #6 and #10 <br />ground wires. <br />PROVISIONS FOR FUTURE GROWTH <br />• None. <br />-21 <br />Vld-n Voce Bata r_ornrnumcanons I voltalc'DIVlnon 12681 Pala Dnve, Gaz den grove CA 9?341 Pn, I nal L, U,xy Li tole, <br />
The URL can be used to link to this page
Your browser does not support the video tag.