My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
STL LANDSCAPE, INC - 2018
Clerk
>
Contracts / Agreements
>
S
>
STL LANDSCAPE, INC - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2022 3:42:35 PM
Creation date
3/22/2018 3:40:37 PM
Metadata
Fields
Template:
Contracts
Company Name
STL LANDSCAPE, INC
Contract #
A-2018-018
Agency
Parks, Recreation, & Community Services
Council Approval Date
2/6/2018
Expiration Date
8/17/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. (4) Four Services manuals have been delivered to The City of Santa Ana authorized <br />representative. <br />6. Once the above requirements have been met a walk through for substantial completion may be <br />requested. The following procedures will be used during the walk through: <br />a) All valve box lids shall be removed from valve boxes and placed faced up adjacent to the <br />valve box prior to beginning the walk through. <br />7. The walk through will proceed as follows: <br />a) Visual Walk Through: This will consist of examining all components of the installed system. <br />A punch list will be established of deficiencies in the construction and workmanship of the <br />system as compared to the construction drawings, details, and specifications. <br />8. Once the Walk Through for Substantial Completion has been completed the architect will provide a <br />copy of all punch list items to The City of Santa Ana authorized representative for review and <br />distribution to the contractor. It is the contractor's responsibility to repair, replace, and adjust all <br />items on the punch before requesting a final walk through. <br />Final Walk Through <br />Before commencement of a final walk through is requested, the following requirements must be <br />entirely satisfied: <br />a) Each item on the walk through for substantial completion has been thoroughly addressed <br />and resolved by the contractor. <br />b) All final record as -built drawings have been produced by the architect and submitted to The <br />City of Santa Ana authorized representative. <br />c) The maintenance manual for the project has been completed and submitted to The City of <br />Santa Ana authorized representative. <br />2. Once the above requirements have been met a final walk through may be requested where the <br />architect and The City of Santa Ana authorized representative will review all corrected items. <br />END OF SECTION <br />Additional Notes <br />Contractor will be responsible for installing a temporary fence <br />Contractor will be responsible for any permits <br />Contractor will be responsible for providing a performance bond <br />City of Santa Ana RFP 17-127 <br />Page 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.