My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55A - RESO SCE STREET LIGHTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
04/03/2018
>
55A - RESO SCE STREET LIGHTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2018 7:42:40 PM
Creation date
3/29/2018 7:21:43 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55A
Date
4/3/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
438
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SIEMENS <br />f:=!Ef'rtira <br />Procurement <br />As previously mentioned, Siemens Is a vendor neutral company when it comes to fixture selection and <br />procurement. Because of this, we have developed a strong manufacturer sourcing base, which has <br />given us strong buying power. <br />Siemens has experience with many vendors and can negotiate prices based on our experience. The <br />table below shows some of our recent experience procuring and installing materials from a diverse field <br />of manufacturers. <br />City <br />Manufacturer <br />Santa Monica & San Mateo CA <br />Cree <br />Huntington Beach & Fresno CA <br />Leotek <br />Rialto CA <br />GE <br />Sacramento CA <br />EOI <br />Knoxville TN <br />Aculty <br />Installation <br />Implementation Development <br />Siemens will examine and confirm each staffing plan with the City before work begins. Siemens will <br />have a dedicated field supervisor, project manager, commercial project manager, project coordinator, <br />and warehouse staff to support the project. Siemens staff will use Microsoft Project to track the overall <br />progress of the project and to create overview progress reports, as well as mobile technology that will <br />track progress in real time through the use of tablets in the field. <br />Installation progress will be tracked on a daily basis by the project's Field Supervisor and Project <br />Manager, and a brief status report that Includes project status and any current issues will be provided to <br />the City on a weekly basis, Project team meetings will be held on a regular basis as determined by the <br />City and Siemens. These meetings will includes the Slemens' project management staff, Siemens' field <br />supervisor, and City staff. In addition to progress reports, these meetings will ensure that the project is <br />on schedule, any issues are being addressed, the work is being done safely and to the satisfaction of <br />all stakeholders. <br />Quality control will be a top priority during the Implementation phase of the project. The Siemens project <br />manager and field supervisor will routinely visit the field to perform quality control and Identify <br />opportunities for improvement. Siemens staff will routinely perform Internal project audits and reviews to <br />ensure the project is being executed correctly and efficiently. In addition, Siemens project management <br />and supervisory staff will communicate on a regular basis with City staff and City existing street light <br />maintenance contractor in relation to any issues found in the field that require attentlon. <br />With agreement from the City, Siemens will provide monthly summaries of completed zones for the <br />City's provisional acceptance. This will allow any issues that may arise to be addressed on an on-going <br />basis rather than at the end of the project. In conjunction with this, on a monthly basis, the Siemens <br />energy engineer will use information gathered in the monthly summaries to energy rates are accurately <br />adjusted In accordance with the project's progress. Siemens will coordinate with the utilities to ensure <br />that any inspections are scheduled well in advance, as to not Impact the project schedule or <br />unnecessarily delay any funding. <br />Following the completion of the conversion, Siemens will self -audit the project, and then work with the <br />City on final project Inspection and acceptance, at which time any punchlist Items will be addressed, <br />and the warranty period will begin. <br />Page 18 <br />55A-375 <br />
The URL can be used to link to this page
Your browser does not support the video tag.