My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55A - RESO SCE STREET LIGHTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
04/03/2018
>
55A - RESO SCE STREET LIGHTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2018 7:42:40 PM
Creation date
3/29/2018 7:21:43 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55A
Date
4/3/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
438
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SIEMENS <br />References <br />The following references are provided to the City for contact. Please feel free to call any or all of the <br />clients listed. <br />Page 111 <br />55A-378 <br />Client Name <br />Cit of Huntington Beach <br />Client Location <br />Huntin ton Beach, CA <br />Start date <br />Nov 2013 - present <br />Completion Date <br />Sept 2017 <br />Contact Nafne <br />Bob Stachelski <br />Contact e-mail <br />bstachels 1 surf-ci -hb.or <br />Contact phone <br />714-535-5523 <br />Phase 1 <br />Street light acquisition consulting and energy efficiency project <br />Implementation. Budget of $1.6 Million. Scope of work Includes: <br />Project description <br />• street light acquisition and retrofit feasibility analysis and <br />program design <br />Project description <br />• construction of new street light circuits and street light poles <br />and fixtures along Olive Avenue, Walnut Avenue and 10th <br />Siemens Role <br />Street and <br />• the Installation of 264 LED street lights In the Shorebreak <br />parking garage <br />• Prime contractor with assistance from the following <br />subcontractors- Northwest Edison and Horizon Underground <br />Prime contractor providing design, installation, procurement, and <br />Siemens Role <br />project management. <br />• Currently implementing LED conversion phase <br />Page 111 <br />55A-378 <br />Client Name <br />City of Rialto <br />Client Location <br />Rialto CA <br />Start date <br />Nov 2014 <br />Completion Date <br />Sept 2017 <br />Contact Name <br />Amy Crow <br />Contact e-mail <br />ocLow2daltoca.gom <br />Contact phone <br />909-421-7221 <br />Street light acquisition consulting and energy efficlency project <br />implementation. Budget of $1.5 Million. Scope of work includes: <br />• street light acquisition and retrofit feasibility analysis and <br />Project description <br />program design, <br />• system wide GIS field audit and <br />• LED conversion of 3,800 cobrahead and decorative street <br />lights <br />Siemens Role <br />Prime contractor providing design, Installation, procurement, and <br />project management. <br />Page 111 <br />55A-378 <br />
The URL can be used to link to this page
Your browser does not support the video tag.