My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55A - RESO SCE STREET LIGHTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
04/03/2018
>
55A - RESO SCE STREET LIGHTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2018 7:42:40 PM
Creation date
3/29/2018 7:21:43 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55A
Date
4/3/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
438
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
See arlo C. Option 1. Og$on 2 and OMlon 3 <br />Option 1 <br />Option 2 <br />Q9 <br />: Eaton <br />Acuity <br />siemens Response to city Of Santa Ana RFP 17076 <br />Fee Proposal <br />.�r, <br />..1,. .F.,: <br />4 „'Ret r;X,.';;.r;v,:., <br />•::a.>:;��_:; <br />Slemens staff coordinate vkh City staff to <br />Adeount Manager and Senior <br />1 5amo,1 <br />0 0 <br />00 <br />develop OnalllatofLED fixturesfor <br />Energ,ftlnaer <br />4 <br />$ 180.00 <br />6 720.00 <br />project evaluation <br />8676.00 <br />00 <br />169 <br />8 00 <br />Slamens staff evaluates technical <br />50 <br />11 <br />7 <br />2Aa.00 <br />characteristics of agreed upon list of LEO <br />Senior Energy Englneer <br />16 <br />$ 180,00 <br />$ 2,880,00 <br />tudures <br />60 <br />3 <br />3 0 <br />Siemens staff oplimizas LED <br />400 <br />304 <br />S <br />Implementation design for each LEO <br />product selected and develops bin of <br />6anlor Energy Engineer <br />16 <br />$ 160.00 <br />$ 2,880.00 <br />metedafs <br />Siemens presents final report Of LED <br />fhdures, Outlining lighting performance, <br />Account Manager and Senior <br />energy efficiency and life cycle cost <br />EnstgyEnglneer <br />16 <br />$ 180:00 <br />$ 2,880.00 <br />analysis for City staff review and product <br />selection <br />llT lllll�- <br />Total 8 0 <br />$ 1.675485.00 <br />t. daR, "b45 3a, <; ':• <br />.A_ <br />t T.:'.' <br />70 <br />0 <br />1 5amo,1 <br />0 0 <br />00 <br />6314 <br />69.00 <br />1,004.346.00 <br />160 <br />167.00 <br />202.00 <br />8676.00 <br />00 <br />169 <br />8 00 <br />50 <br />11 <br />7 <br />2Aa.00 <br />00 <br />304 <br />Pullet Proof Option <br />$93 $ <br />60 <br />3 <br />Total 8 0 <br />$ 1.675485.00 <br />[Total 7 t 400 99.00 <br />' OOa ti `" A'sni.: p,' <br />t. daR, "b45 3a, <; ':• <br />>'F.dlal" :' tti'"i't <br />50 22:•3 <br />�9454 <br />0 <br />?Y <br />13 .00 <br />6.OD <br />1D0 531 <br />70 <br />844.926.00 <br />150 488 <br />167.00 <br />100 <br />6. $ <br />9 91 . n <br />1157.00 <br />j <br />150 <br />AD 3 <br />281.00 <br />BS 2 0 <br />Bul at Proof Donlon 393 <br />06.0 $ <br />3 57 800 <br />60 <br />3 <br />3 0 <br />4 .00 <br />400 <br />304 <br />S <br />[Total 7 t 400 99.00 <br />' OOa ti `" A'sni.: p,' <br />t. daR, "b45 3a, <; ':• <br />>'F.dlal" :' tti'"i't <br />50 22:•3 <br />70 68 <br />13 .00 <br />9.384.00 <br />1D0 531 <br />1651AD <br />844.926.00 <br />150 488 <br />193.0B184. <br />200 6 <br />6. $ <br />9 91 . n <br />50 31RiJAIQU <br />j <br />5 4. <br />AD 3 <br />281.00 <br />BS 2 0 <br />Bul at Proof Donlon 393 <br />olel 880 <br />55A-408 <br />1 4 .00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.