My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5 GLOBAL, INC. (2) - 2017
Clerk
>
Contracts / Agreements
>
N
>
NV5 GLOBAL, INC. (2) - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 4:28:51 PM
Creation date
4/9/2018 1:43:16 PM
Metadata
Fields
Template:
Contracts
Company Name
NV5 GLOBAL, INC.
Contract #
A-2017-252
Agency
PUBLIC WORKS
Council Approval Date
9/19/2017
Expiration Date
9/18/2019
Insurance Exp Date
5/1/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br />Appendix <br />ATTACIIWNT X <br />SCOPE OF WORT{ <br />CITY OF SANTA ANA <br />REQUEST FOR PROPOSALS <br />FOR <br />CONSTRUCTION ENGINEERING SERVICES FOR <br />WALNUT PUMP STATION BUILDING UPGRADE AND <br />SAN LORE, NZO SEWAGE LIFT STATION <br />RFP NO.: 17-034 <br />Introduction and Background: I <br />The City desires to engage a professional consultant to perform construction engineering <br />set -vices for the Walnut Pump Station Building Upgrade and the San Lorenzo Sewage Lift <br />Station projects—The consultant shall provide two individuals to act as a Project Manager and a <br />Project Engineer, and serve as an extension of City staff to assist the City in managing <br />construction, ensure that the work to be completed in accordance with the contract documents <br />and report directly to the City's Construction Manager or his authorized representative. City <br />staff will manage the construction of the projects and oversee the work of the Project Manager <br />and the Project Engineer. <br />The Walnut Pump Station Building Upgrade project is currently under construction at a <br />construction cost of $3,6 million; the project construction completion is scheduled for spring <br />2018. A separate project is the San Lorenzo Sewage Lift Station at an estimated construction <br />cost of $5,9 million which the City anticipates advertising for construction bids in fall 2017, and <br />starting construction by summer 2018. Total construction duration for the two projects is 36 <br />months. <br />Description of Work: <br />The required services by the Project Manager and the Project Engineer shall include, but not be <br />limited to, the following: <br />The Project Manager may be a registered engineer in the State of California and <br />shall represent the City Construction Manager in the field. <br />2. Attend pre -construction meeting. May schedule and conduct weeldy <br />constriction and progress meetings to discuss such matters as procedures, <br />progress, problems and scheduling. May prepare and promptly distribute <br />minutes. <br />3. May review conshvction schedule, including activity sequences and duration, <br />schedule of submittals and schedule of delivery for products with long lead-time. <br />Update the project schedule as required to show current conditions and revisions <br />required by actual progress, <br />City of Santa Ana RFP 17-034 <br />Page Al -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.