My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NEWCOMB ANDERSON MCCORMICK, INC - 2018
Clerk
>
Contracts / Agreements
>
N
>
NEWCOMB ANDERSON MCCORMICK, INC - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2018 8:55:57 AM
Creation date
4/13/2018 11:02:02 AM
Metadata
Fields
Template:
Contracts
Company Name
NEWCOMB ANDERSON MCCORMICK, INC
Contract #
A-2018-055
Agency
PUBLIC WORKS
Council Approval Date
3/6/2018
Expiration Date
3/5/2021
Insurance Exp Date
11/9/2019
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal No. 2669.01 Water Enterprise Alternative Energy Feasibility Study 1^21 <br />Client <br />Project DescriptionYear <br />Completed <br />SANBAG <br />Preliminary feasibility studies for over 30 MW <br />2012 <br />Duane Baker <br />of PV systems at various San Bernardino <br />(909) 884-8276 <br />county locations <br />Santa Clara USD <br />Feasibility study, procurement and <br />2013 <br />Larry Adams <br />Installation support for 2.8 MW PV system <br />(408) 423-2001 <br />UMManoa <br />Feasibility study, procurement and <br />2014 <br />Steve Meder <br />installation support for 4.8 MW PV system <br />(808) 956-8018 <br />UM System PV <br />Feasibility study for 70 MW PV system <br />2012 <br />Steve Mader <br />Plant <br />(808) 956-8018 <br />Washington USD <br />Feasibllity study, procurement and <br />2013 <br />Scott Lantsberger <br />installation support for 2.5 MW PV system <br />(916) 375-7604 x1010 <br />yolo County <br />Feasibility study, procurement and <br />2013 <br />Terry Vernon <br />installation support for 2.5 MW PV system <br />(530) 666-8066 <br />SCHEDULE <br />A detailed schedule based on the Scope of Services contained in the RFP is provided below in Section Two. NAM <br />is prepared to provide the resources required to complete all of the scoped work in as timely a manner as <br />possible. NAM strives to continually meet client expectations by giving its employee's the bandwidth to address <br />project scope and timelines, NAM's current work load will not prevent any part of the scope work to be fully <br />addresses within the proposed schedule. <br />Copyright © Newoomb Anderson McCormick 2017 CITY OF SANTA ANA <br />
The URL can be used to link to this page
Your browser does not support the video tag.