HomeMy WebLinkAboutNS-2950 - Amending Chapter 8 of Santa Ana Municipal Code Updating Solar Streamlining Ordinance for Solar Energy SystemsLS 6.19.18
ORDINANCE NO. NS -2950
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY
OF SANTA ANA AMENDING CHAPTER 8 OF THE
SANTA ANA MUNICIPAL CODE UPDATING SOLAR
STREAMLINING ORDINANCE FOR SOLAR ENERGY
SYSTEMS
THE CITY COUNCIL OF THE CITY OF SANTA ANA DOES ORDAIN AS
FOLLOWS:
Section 1. The City Council of the City of Santa Ana hereby finds, determines,
and declares as follows:
A. Subsection (a) of Section 65850.5 of the California Government Code
provides that it is the policy of the State to promote and encourage the
installation and use of solar energy systems by limiting obstacles to their use
and by minimizing the permitting costs of such systems.
B. The City Council of the City of Santa Ana finds that it is in the interest of the
health, welfare and safety of the public to provide an expedited permitting
process to encourage the effective development of solar technology.
C. In September of 2015, the City adopted an ordinance, consistent with the
goals and intent of subdivision (a) of Section 65850.5 that created an expedited,
streamlined permitting process for small residential rooftop solar energy systems.
D. Effective January 2018, Assembly Bill 1414 expanded the definition of "solar
energy system" and extended the applicability of Section 65850.5 of the
California Government Code to create an expedited, streamlined permitting
process for all solar energy systems through January 1, 2025.
Section 2. Pursuant to the California Environmental Quality Act ("CEQA") and
the State CEQA Guidelines, the adoption of this ordinance is exempt from CEQA review
pursuant to 14 California Code of Regulations section 15061(b)(3), which is applicable if
it can be seen with certainty that there is no possibility that the project may have a
significant effect on the environment. As a result, a Notice of Exemption will be filed
upon adoption of this ordinance.
Section 3. ARTICLE XII of Chapter 8 of the Santa Ana Municipal Code is
hereby amended such that it reads as follows:
Sec. 8-2511 - Solar Energy System Review Process.
(a) Definitions.
Ordinance No, NS -2950
Page 1 of 5
As used herein the following terms shall mean the following:
1. Electronic Submittal - shall mean the utilization of one or more of
the following: e-mail, internet or facsimile.
2. Solar easement - shall mean the right of receiving sunlight across
real property of another for any solar energy system. Any
instrument creating a solar easement shall include, at a minimum,
all of the following:
(1) A description of the dimensions of the easement
expressed in measurable terms, such as vertical or
horizontal angles measured in degrees, or the
hours of the day on specified dates during which
direct sunlight to a specified surface of a solar
collector, device, or structural design feature may
not be obstructed, or a combination of these
descriptions;
(2) The restrictions placed upon vegetation,
structures, and other objects that would impair or
obstruct the passage of sunlight through the
easement; and,
(3) The terms or conditions, if any, under which the
easement may be revised or terminated.
3. Solar energy system — shall mean either of the following:
(1) Any solar collector or other solar energy device
whose primary purpose is to provide for the
collection, storage, and distribution of solar energy
for space heating, space cooling, electric
generation, or for water heating.
(2) A structural design feature of a building, including
either of the following:
(A)Any design feature whose primary purpose is
to provide for the collection, storage, and
distribution of solar energy for electricity
generation, space heating or cooling, or for
water heating.
(B)Any photovoltaic device or technology that is
integrated into a building, including, but not
limited to, photovoltaic windows, siding, and
roofing shingles or tiles.
Ordinance No. NS -2950
Page 2 of 5
(b) Applicability.
This chapter applies to the permitting of all solar energy systems. Solar
energy systems legally established or permitted prior to the effective date of
this chapter are not subject to the requirements of this chapter unless physical
modifications or alterations are undertaken that materially change the size
type, or components of a solar energy
new permitting. Routine operation and
shall not require a permit.
(c) Eligibility.
system in such a way as to require
maintenance or like -kind replacements
The Building Department shall adopt a standard plan and checklist
of all requirements which solar energy systems shall comply with to
be eligible for expedited review.
2. The solar energy system permit process, standard plans, and
checklist shall substantially conform to the recommendations for
expedited permitting, including the checklist and standard
contained in the most current version of the California Solar
Permitting Guidebook adopted by the Governor's Office of Planning
and Research.
3. Prior to submitting an application, the applicant shall:
Verify to the City's reasonable satisfaction through the use of
standard engineering evaluation techniques that the support
structure for the solar energy system is stable and adequate
to transfer all wind, seismic, and dead and live loads
associated with the system to the building foundation.
At the applicant's cost, verify to the applicant's reasonable
satisfaction using standard electrical inspection techniques
that the existing electrical system including existing line, load,
ground and bonding wiring as well as main panel and
subpanel sizes are adequately sized, based on the existing
electrical system's current use, to carry all new photovoltaic
electrical loads.
(d) Review / Issuance Process.
An application that satisfies the information requirements in the
checklist pursuant to Section (c)(2) above, shall be deemed
complete. Upon receipt of an incomplete application, the building
official shall issue a written correction notice detailing all deficiencies
in the application and any additional information required to be
eligible for expedited permit issuance.
2. Upon confirmation by the building official of the application and
supporting documentation being complete and meeting the
Ordinance No. NS -2950
Page 3 of 5
requirements of the checklist, the building official shall
administratively approve the application and issue all required
permits.
3. City building permit approval does not authorize an applicant to
connect the solar energy system to the local utility provider's
electricity grid. The applicant is responsible for obtaining such
approval or permission from the local utility provider.
4. If the property is located within a historical district, is listed on any
historic register or has entered into a Mills Act Agreement, the
applicant shall schedule a consultation with the Planning Manager or
his/her designee pertaining to the proposed work.
(e) Inspections.
For a solar energy system eligible for expedited review, only one
inspection shall be required.
2. If a solar energy system fails inspection, a subsequent inspection is
authorized; however, the subsequent inspection need not conform to
the requirements of this subsection.
Section 4. If any section, subsection, phrase, or clause of this ordinance is for
any reason held to be unconstitutional, such decision shall not affect the validity of the
remaining portions of this ordinance. The City Council hereby declares that it would
have passed this ordinance and each section, subsection, phrase or clause thereof
irrespective of the fact that any one or more sections, subsections, phrases, or clauses
be declared invalid or unconstitutional.
ADOPTED this 1 gth day of June, 2018.
APPROVED AS TO FORM:
Sonia Carvalho, City Attorney
By: L
Lisa Storck
Assistant City Attorney
Ordinance No. NS -2950
Page 4 of 5
AYES: Councilmembers
NOES: Councilmembers
ABSTAIN: Councilmembers
NOT PRESENT: Councilmembers
Pulido, Sarmiento, Solorio, Villegas (4)
None (0)
None (0)
Benavides, Martinez, Tinaiero (3)
CERTIFICATE OF ATTESTATION AND ORIGINALITY
I, MARIA D. HUIZAR, Clerk of the Council, do hereby attest to and certify that the
attached Ordinance No. NS -2950 to be the original ordinance adopted by the City
Council of the City of Santa Ana on June 19, 2018, and that said ordinance was
published in accordance with the Charter of the City of Santa Ana.
Date:
Maria D. Huizar
Clerk of the Council
City of Santa Ana
Ordinance No. NS -2950
Page 5 of 5