HomeMy WebLinkAboutRESO 2018-20_2110, 2114 AND 2020 E FIRST STREETLS 6.04.18 RESOLUTION NO. 2018-20 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF SANTA ANA APPROVING SITE PLAN REVIEW NO. 2017-09 AS CONDITIONED AND DENSITY BONUS AGREEMENT NO. 2017-02 AS CONDITIONED FOR A NEW MIXED-USE FAMILY AFFORABLE RENTAL RESIDENTIAL AND COMMERCIAL DEVELOPMENT FOR THE PROPERTIES LOCATED AT 2110, 2114, AND 2020 EAST FIRST STREET BE IT RESOLVED BY THE PLANNING COMMISSION OF THE CITY OF SANTA ANA AS FOLLOWS: Section 1. The Planning Commission of the City of Santa Ana hereby finds, determines and declares as follows: A. Gene Broussard, representing Affordable Housing Land Consultants, Inc. (AMG & Associates, hereinafter referred to as "Applicant'), is requesting approval of Site Plan Review No. 2017-09, as conditioned, and Density Bonus Agreement No. 2017-02, as conditioned, to allow the construction of a new mixed-use 552 -unit family affordable rental residential and commercial development at 2110 and 2114 East First Street. B. The Metro East Mixed Use overlay district was adopted in 2007 as a result of interest in developing mixed-use residential and commercial projects in its project area. The regulating plan, which establishes land uses and development standards, allows a variety of housing and commercial projects, including mixed-use residential communities, live/work units, hotels, and offices. C. The California Density Bonus law allows developers to seek increases in base density for providing on-site housing units in exchange for providing affordable units on site. To help make constructing on-site affordable units feasible, the law allows developers to seek incentives/concessions or waivers that would help the project be built without significant burden and without detriment to public health. D. On June 4, 2018, the Planning Commission of the City of Santa Ana held a duly noticed public hearing and at that time considered all testimony, written and oral. E. Section 41-595.5 of the Santa Ana Municipal Code (SAMC) requires a review by the Planning Commission of all plans within a zoning district classification combined with an OZ suffix where the applicant wants to Resolution No. 2018-20 Page 1 of 11 apply the overlay zone, to ensure the project is in conformity with the overlay zone plan. F. The zoning designation for the subject property is Metro East Mixed Use (MEMU) Overlay Zone (OZ -1) in the Active Urban land use district. G. The Planning Commission determines that the following findings, which must be established in order to grant this Site Plan Review pursuant to SAMC Section 41-595.5, have been established for Site Plan Review No. 2017-09 to allow construction of the proposed project. 1. That the proposed development plan is consistent with and will further the objectives outlined in Section 1.2 for the MEMU overlay district. The proposed development project will be compatible with Section 1.2 (Objectives) of the Metro East Overlay zone. The proposed project will contain 552 residential units (including one manager's unit) with a substantial (up to 10,000 square feet) commercial component. In addition, the project has been designed to feature a public plaza at its frontage on First Street, designed for temporary activities or kiosks. Constructing 552 units in the project area will add to the residential population in the area, stimulating demand for community -serving commercial uses such as restaurants, retail stores, dry cleaning services, and other similar uses. Finally, the project meets several General Plan goals and policies, including the Land Use Element's Goal 2 (to encourage diversity of quality housing, affordability levels, and living experiences), Goal 4 (to provide adequate rental and ownership housing and supportive services), and the Housing Element's policies HE -2.3 and 2.4 (to encourage construction of rental housing, facilitate diverse types of housing, prices, and sizing). 2. That the proposed development plan is consistent with the development standards specified in Section 4 of the MEMU overlay district. Although the project complies with the majority of development standards enumerated in the MEMU regulating plan, it does not meet the requirements for publicly - accessible open space, building setbacks, off-street parking, and driveway widths. These standards require approval of incentives/concessions and/or waivers through the Density Bonus Agreement application. Resolution No. 2018-20 Page 2 of 11 3. That the proposed development plan is designed to be compatible with adjacent development in terms of similarity of scale, height, and site configuration and otherwise achieves the objectives of the Design Principles specified in Section 5 of the MEMU overlay district. The proposed development consists of a six -level project surrounded by multi-level and single -story structures. A single -level school campus abuts the site to the south, and single -story commercial development is to the north across First Street and east abutting the site. A midrise office building abuts the site to the west. The MEMU anticipates developments of this scale or larger in the "Active Urban" land use district, and this development would continue the scale of existing buildings in its immediate vicinity. Moreover, the project contains ground -floor non-residential (commercial and community) spaces at the front of the project, which will activate First Street. These spaces have been designed to feature ground -floor ceiling heights between 12 and 22 feet tall, enhancing the urban, mixed-use atmosphere envisioned by the MEMU overlay district. 4. That the land use uses, site design, and operational considerations in the proposed development plan have been planned in a manner that will result in a compatible and harmonious operation as specified in Section 7 of the MEMU overlay district. The proposed project is consistent with the scale and intensity of projects anticipated in the original MEMU EIR (EIR No. 2006-01) and in the MEMU overlay district regulating plan. No negative impacts from noise, air quality, aesthetics, or traffic are expected except for temporary impacts arising during construction of the project. The site's design is intended to activate its frontage on First Street by providing flexible community areas that can be programmed with activities or temporary uses, and the landscape palette has been carefully selected to complement existing landscape patterns of the surrounding land uses. H. The Planning Commission determines that the following findings, which must be established in order to grant this Density Bonus Agreement pursuant to SAMC Section 41-1607, have been established for Density Bonus Agreement No. 2017-02 to allow construction of the proposed project: 1. That the proposed development will materially assist in accomplishing the goal of providing affordable housing Resolution No. 2018-20 Page 3 of 11 opportunities in economically balanced communities throughout the city. The proposed development will provide 552 affordable rental family housing units, contributing toward the City's rental housing stock to serve the needs of diverse and underserved populations. The area in which the project is proposed, the Metro East Mixed Use overlay district, currently contains one market -rate mixed use community and another entitled market -rate mixed use community. The construction of this project will contribute toward an economically balanced community by providing housing for different demographic and income levels in an area rich with employment opportunities, commercial development, and market -rate housing. 2. That the development will not be inconsistent with the purpose of the underlying zone or applicable designation in the general plan land use element. The project site is located in an area already identified in both the City's Zoning Code (the Metro East Mixed Use overlay district) and General Plan (the Land Use and Housing elements) for new residential communities. Moreover, the proposed density of 80 units per acre is consistent with the anticipated development intensity of 90 units per acre in the General Plan Land Use element, and is below the density bonus provisions in the California Density Bonus Law for family-oriented projects (35 -percent density bonus) and in the City's Housing Opportunity Ordinance (35 - percent density bonus). 3. That the deviation is necessary to make it economically feasible for the Applicant to utilize a density bonus authorized for the development pursuant to section 41-1603. The proposed project requires three deviations through incentives/concessions: publicly -accessible open space, building setbacks (side and rear), and offsite parking, as well as one deviation through a waiver in driveway width. The four deviations are described as follows: First, the MEMU regulating plan requires that publicly - accessible open space be provided along main street -facing fagades. Because the project has frontage on only one street, meeting this requirement would result in the building being pushed back significantly from First Street and would Resolution No. 2018-20 Page 4 of 11 render almost the first 1/4 of the site's depth unusable for building area, resulting in the developer having to construct a parking structure or subterranean parking, significantly increasing building costs. Moreover, in order to maintain the current proposed unit count, the developer would be required to construct additional levels, resulting in a different type of construction (steel-frame/Type I versus wood/Type III), further increasing development costs. If the publically accessible open space standard were applied as written, the result would be a significant loss of units and parking area. Pushing the building back would also reduce the contribution to creating a more urban, walkable environment. The Applicant intends to compensate for this reduction by providing a greater average square footage of private/common open space per unit on the project site. Second, for a project of this size and construction type, OCFA requires 360 -degree circulation on the project site with minimum 20 -foot fire lanes. The addition of landscaping and walkways around the project perimeter results in the project not being able to meet the maximum 10 -foot side yard requirement. Further, for a project of this height, the MEMU requires a 100 -foot rear yard setback. In order to maintain the current proposed unit count, the developer would be required to construct additional levels, resulting in a different type of construction (steel-frame/Type I versus wood/Type III), further increasing development costs. Implementing this standard as written would result in the building being set back an additional 55 feet from the rear lot line, resulting in a significant loss of units and parking area. Third, constructing 2.0 parking spaces per residential unit on the project site would require the developer to construct an additional level of parking either above- or below -grade, resulting in increased construction costs and/or a loss of an entire level of residential units. Staff has analyzed the proposed project and finds that there is potential that the project and neighborhood may be impacted by the reduced parking. The City has identified the MEMU area for high- intensity, mixed use development in order to reduce demands for parking and traffic impacts. However, the MEMU area is still in transition, and portions including the MEMU area have yet to redevelop and produce the pedestrian -scale environment envisioned by the plan. To mitigate these impacts, the applicant prepared a parking study that shows that providing valet service and/or a shuttle to major transit stops will reduce parking demand on the site Resolution No. 2018-20 Page 5 of 11 by 150 parking spaces. The study also identifies the project and its proximity to transit will generate 105 new transit trips. Based on these factors and comparison against other major parking studies prepared by public agencies (San Diego, 2011 and Los Angeles, 2016), the parking study states that the project will have a peak demand of 349 vehicles for the residential component only and 399 parking spaces, including the commercial component. The report and staff analysis also show that the site lies along an express and a standard bus line that provide service approximately every 10 to 15 minutes during rush hour. These lines connect the project to points west (central Santa Ana, Garden Grove, and Westminster), north (Tustin, Orange, and Placentia), and east (central Tustin). Finally, the Applicant is proposing valet service to nearby parking lots and a parking shuttle to major transit stops to further reduce the demand for on-site parking. Fourth, if the project was designed with narrower driveways, the driveways would not conform to minimum standards established for fire ingress/egress by OCFA and for trash truck ingress/egress established by the Public Works Agency and Waste Management, the current waste collector contracted by the City. As a result, a waiver from the maximum driveway width is required. The three requested concessions could be avoided if the project were constructed using a different site plan and building type. If the project were designed with a multi-level parking and/or subterranean parking structure, or if the applicant used different building materials (non-combustible, Type 1) to construct a taller project, additional area on site would become available to provide open space and parking, and to meet the required rear yard setback. However, these changes would increase development costs, resulting in the affordable housing project becoming financially infeasible due to the significantly -increased financial implications of using Type I construction. The Applicant agrees to indemnify, hold harmless, and defend the City of Santa Ana, its officials, officers, agents, and employees, from any and all liability, claims, actions or proceedings that may be brought arising out of its approval of this project, and any approvals associated with the project, including, without limitation, any environmental review or approval, except to the extent caused by the sole negligence of the City of Santa Ana. Resolution No. 2018-20 Page 6 of 11 Section 2. In accordance with the California Environmental Quality Act (CEQA), the recommendation is exempt from further review pursuant to Sections 15162 and 15168 of the CEQA guidelines. In accordance with the California Environmental Quality Act (CEQA), the recommended action has been determined to be adequately evaluated in the previously certified EIR No. 2006-01 as per Sections 15162 and 15168 of the CEQA guidelines. All mitigation measures in EIR No. 2006-01 and associated Mitigation Monitoring and Reporting Program (MMRP) have been enforced and continue to apply to the proposed project. As required by the MMPR, a traffic impact analysis was performed to analyze any potential changes in area traffic as a result of the proposed development. The study concluded that no additional significant impacts would trigger the requirement for additional environmental review. In addition, a health risk assessment (HRA) was prepared to identify any impacts from developing a residential community near a major freeway. The HRA finds that no mitigation measures are required for the project due to its distance from the Santa Ana (1-5) and Costa Mesa (SR -55) freeways. In considering additional analysis, the applicant submitted a greenhouse gas study to indicate that the project will not negatively impact greenhouse gas reduction goals. As outlined in the accompanying staff report, the project is consistent with the City's General Plan and the MEMU regulating plan. Further, it is consistent with the density bonus provisions outlined in the City's Housing Opportunity Ordinance. The project site is located within city limits and is less than five acres in size. It is already in an urbanized setting surrounded by urban uses, and the project has not been identified as habitat for endangered, rare or threatened species. Section 3. The Planning Commission of the City of Santa Ana, after conducting the public hearing, hereby approves Site Plan Review No. 2017-09 and Density Bonus Agreement No. 2017-02 as conditioned in Exhibit A attached hereto and incorporated as though fully set forth herein. This decision is based upon the evidence submitted at the above said hearing, which includes, but is not limited to: the Request for Planning Commission Action dated May 14, 2018, and exhibits attached thereto; and the public testimony, written and oral, all of which are incorporated herein by this reference. ADOPTED this 4t" day of June, 2018 by the following vote: AYES: Commissioners: MCLOUGHLIN, MENDOZA, VERINO, NOES: Commissioners: BACERRA ABSENT: Commissioners: ALDERETE, CONTRERAS-LEO ABSTENTIONS: Commissioners: ***Signature page follows*** Resolution No. 2018-20 Page 7 of 11 Mark oughlin Chairman APPROVED AS TO FORM: Sonia R. Carvalho, City Attorney Lisa Storck Assistant City Attorney CERTIFICATE OF ATTESTATION AND ORIGINALITY I, SARAH BERNAL Recording Secretary, do hereby attest to and certify the attached Resolution No. 2018-20 to be the original resolution adopted by the Planning Commission of the City of Santa Ana on June 4, 2018. Date: 171 b oma/ ('Ulf % " A�j t Recording Secretary City of Santa Ana Resolution No. 2018-20 Page 8 of 11 Conditions for Approval for Site Plan Review No. 2017-09 and Density Bonus Agreement No. 2017-02 Site Plan Review No. 2017-09 and Density Bonus Agreement No. 2017-02 are approved subject to compliance, to the reasonable satisfaction of the Planning Manager, with applicable sections of the Santa Ana Municipal Code, the California Administrative Code, the California Building Standards Code, and all other applicable regulations. In addition, it shall meet the following conditions of approval: The Applicant must comply with each and every condition listed belowrip or to exercising the rights conferred by this site plan review. The Applicant must remain in compliance with all conditions listed below throughout the life of the development project. Failure to comply with each and every condition may result in the revocation of the site plan review. A. Planning Division 1. All proposed site improvements must conform to the Development Project Review approval of DP No. 2016-33. 2. Prior to issuance of building permits for above -ground construction, the Applicant shall record terms into an agreement with the City of Santa Ana detailing operations of the proposed shuttle and/or valet service. The applicant shall provide a map of the off-site parking lot locations and number of off-site parking stalls before occupancy of the facility, as part of the Density Bonus agreement approved by City Council. The terms and contents of the agreement may be included in any required density bonus and/or inclusionary housing agreement and shall be reviewed and approved by the Planning Division, Public Works Agency, and City Attorney's Office prior to recordation. Upon review and approval, proof of the agreement's recordation shall be submitted to the Planning Division prior to building permit issuance. After 12 months of operation, the Applicant shall prepare a review of the operations detailed in the agreement, including the shuttle and/or valet services, for review and analysis by the City, after which modifications and/or alternate parking reduction strategies will be considered if necessary. Any modifications and/or alternate parking reduction strategies will be reviewed by the Planning Manager, after which a determination will be made if the agreement can be amended by the City Manager or his designee, or if the Planning Commission must review any new proposed conditions of approval. The initial "deal points" are outlined below: • AMG must identify which parking lots have agreed to rent out parking spaces for the valet service Resolution No. 2018-xx Page 8 of 11 • AMG must identify specific shuttle stop locations and must obtain approval from the Orange County Transportation Authority (OCTA) if it wishes to utilize its bus stops/pullouts as part of its shuttle service operations • All residents of driving age must disclose any owned, leased, or rented vehicles to be permitted to park on the project site or any properties as part of the valet or shuttle service • Each tenant must agree to lease terms prohibiting parking of his or her vehicle on any City -owned property o Every such agreement must contain penalties/consequences for violating the terms of the agreement o Terms shall also be incorporated into the City's housing plan or agreement for the project • The shuttle shall be operated by the developer and at the developer's sole expense • The developer and/or management company shall maintain a copy of the shuttle's operating plan, including days, times, and frequency of service, with the City's Planning Division and Public Works Agency • The City can record a lien to collect any unpaid fines or monitoring costs • The developer may require include lease provisions that limit the number of vehicles a tenant may possess during the term of occupancy • The developer and/or management company shall coordinate with the City's Planning Division, Public Works Agency, and City Attorney's Office to document and record the agreement 3. Prior to issuance of building permits for above -ground construction, the Applicant shall provide the City of Santa Ana a copy of a recorded easement for reciprocal access (ingress, egress, and fire access) for any and all proposed shared drive aisle(s) between the project site and the adjacent property to the west. 4. Any amendment to this site plan review, including modifications to approved materials, finishes, architecture, site plan, landscaping, unit count, mix, and square footages must be submitted to the Planning Division for review. At that time, staff will determine if administrative relief is available or if the site plan review must be amended. 5. A residential property manager shall be on site at all times that the project is occupied and the developer and onsite management shall at all times maintain a 24-hour emergency contact and contact information on file with the City. 6. All mechanical equipment shall be screened from view from public and courtyard areas. 7. A final detailed amenity plan must be reviewed and approved prior to issuance of any building permits. The plan shall include details on the hardscape design, lighting concepts and outdoor furniture for amenity, plaza, or courtyard areas as Resolution No. 2018-xx Page 9 of 11 well as an installation plan. The exact specifications for these items are subject to the review and approval by the Planning Division. 8. Prior to installation of landscaping, the Applicant shall submit photos and specifications of all trees to be installed on the project site for review and approval by the Planning Division. Specifications shall include, at a minimum, the species, box size (24 inches minimum), brown trunk height (10 -foot minimum), and name and location of the supplier. 9. After project occupancy, landscaping and hardscape materials must be maintained as shown on the approved landscape plans. 10. A Resident Storage Plan shall be provided for the project prior to occupancy. Storage shall be available at no cost to the residents. 11. Prior to issuance of building permits, the Applicant shall submit a construction schedule and staging plan to the Planning Division for review and approval. The plan shall include construction hours, staging areas, parking and site security/screening during project construction. Resolution No. 2018-xx Page 10 of 11