Loading...
HomeMy WebLinkAbout181022_RESO 2018-31_2301 N TUSTIN AVENUELS 10.22.18 RESOLUTION NO. 2018-31 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF SANTA ANA APPROVING CONDITIONAL USE PERMIT NO. 2018-20 AS CONDITIONED TO ALLOW AFTER-HOURS (24-HOUR) OPERATION FOR AN EATING ESTABLISHMENT LOCATED AT 2301 NORTH TUSTIN AVENUE BE IT RESOLVED BY THE PLANNING COMMISSION OF THE CITY OF SANTA ANA AS FOLLOWS: Section 1. The Planning Commission of the City of Santa Ana hereby finds, determines and declares as follows: A. Ralph Deppisch, representing The Liese L. Rego Family Trust ("Applicant'), is requesting approval of Conditional Use Permit No. 2018-20 to allow Starbucks to operate after-hours (24 -hours) in the Arterial Commercial (C5) zoning district at 2301 North Tustin Avenue. B. Santa Ana Municipal Code (SAMC) Section 41-424.50) requires approval of a conditional use permit for eating establishments open at any time between the hours of 12:00 a.m. and 5:00 a.m. and located within one hundred fifty (150) feet of residentially zoned or used property. C. Pursuant to SAMC Section 41-638, the Planning Commission is authorized to review and approve the conditional use permit for this project to as set forth by the Santa Ana Municipal Code. D. On October 8, 2018, the Planning Commission held a duly noticed public hearing for Conditional Use Permit No. 2018-20. At the conclusion of the public hearing, the Commission continued the item to the October 22, 2018 Planning Commission meeting and asked staff and the Applicant to review potential traffic safety measures. E. The Planning Commission of the City of Santa Ana has considered the information and determines that following findings, which must be established in order to grant Conditional Use Permit No. 2018-20, to operate between the hours of 12:00 a.m. and 5:00 a.m. within one hundred fifty (150) feet of residentially zoned and used property, have been established as required by SAMC Section 41-638: 1. That the proposed use will provide a service or facility which will contribute to the general well being of the neighborhood or community. Resolution No. 2018-31 Page 1 of 8 The proposed eating establishment with 24-hour operations will provide a service to persons that are working or residing in the area. The site will be redevelop a vacant lot with a new building with a contemporary design with cement plaster finishes, metal canopies, stained cedar siding, green screens, an outdoor patio and enhanced landscaping which will contribute to the aesthetics of the area. 2. That the proposed use will not, under the circumstances of the particular case, be detrimental to the health, safety, or general welfare of persons residing or working in the vicinity. The proposed operations will not be detrimental to the health, safety or welfare of those residing or working in the vicinity. The closest residential building is approximately 185 feet to the east of the proposed building. In addition, the existing commercial building at 2151 East Santa Clara Avenue creates an additional buffer between the new building with after-hours operations and the residential units. Any light, noise or traffic from the business during after-hours operations will be minimal. In addition, the Police Department has determined that there are no crime related issues and does not object to granting the conditional use permit. 3. That the proposed use will not adversely affect the present economic stability or future economic development of properties surrounding the area. The after-hours operations will not adversely affect the economic stability or future economic development of properties in the surrounding area. The site will be redeveloped with a new building and water efficient landscaping. An eating establishment with after-hours operations will provide additional service and eating opportunities for the area and will provide a commercial business that will generate sales tax revenue for the City. The new businesses will provide job opportunities and allow the business to compete with other after-hours businesses within close proximity. 4. That the proposed use will comply with the regulations and conditions specified in Chapter 41 for such use. The proposed use complies with the regulations and conditions in Chapter 41 including building heights, yards, parking and landscaping. A condition of approval has been added to the conditional use permit for a property Resolution No. 2018-31 Page 2 of 8 maintenance agreement to be recorded against the property which will ensure that the property and all improvements are properly maintained. 5. That the proposed use will not adversely. affect the General Plan of the city or any specific plan applicable to the area of the proposed use. The proposed eating establishment with after-hours operations will not adversely affect the General Plan. The project is located in a General Commercial (GC) General Plan land use designation which allows for commercial uses such as retail, service and eating establishment uses. The project is consistent with several goals and policies of the General Plan, including the Economic Development Element, Land Use Element, and Urban Design Element. Land Use Element Goal 1 promotes a balance of land uses to address basic community needs. Policy 1.10, encourages the location of commercial centers at arterial roadway intersections in commercial districts. The project will provide for a new commercial building on two arterial streets. Land Use Element Goal 2 promotes land uses that enhance the City's economic and fiscal viability. Policy 2.8, promotes rehabilitation of commercial properties, and encourages increased levels of capital investment. The after-hours operations will contribute to the viability of the business and the existing building will be rehabilitated to match the design of the new building. Policy 2.9, supports developments that create a business environment that is safe and attractive. The Condition of Approval for property maintenance will maintain a safe and attractive environment in the community. Economic Development Element Goal 2 maintains and enhances the diversity of the City's economic base. Policy 2.3 encourages the development of mutually beneficial and supportive business clusters within the community. Urban Design Element Goal 1 improves the physical appearance of the City through development of districts that project a sense of place, positive community image and quality environment. Specifically, Policy 1.5 enhances architectural forms, textures, colors, and materials for all projects. Section 2. In accordance with the California Environmental Quality Act, the project is exempt from further review per Section 15303 of the Guidelines for the California Environmental Quality Act. The Class 3 exemption applies to the construction of small structures, which in an urbanized area is defined as a building not exceeding 10,000 square feet in floor area, on sites zoned for such use, not using significant Resolution No. 2018-31 Page 3 of 8 amounts of hazardous substances, where public services are available and the surrounding area is not environmentally sensitive. The proposed building is 3,567 square feet in floor area within the Arterial Commercial zone which allows for service, retail and commercial uses. The proposed tenants are not anticipated to use significant amounts of hazardous substances. There are public services available through the City of Santa Ana and the Orange County Fire Authority and the surrounding area is not environmentally sensitive. As a result, Categorical Exemption, Environmental Review No. 2017-136 will be filed for this project. Section 3. The Applicant agrees to indemnify, hold harmless, and defend the City of Santa Ana, its officials, officers, agents, and employees, from any and all liability, claims, actions or proceedings that may be brought arising out of its approval of this project, and any approvals associated with the project, including, without limitation, any environmental review or approval, except to the extent caused by the sole negligence of the City of Santa Ana. Section 4. The Planning Commission of the City of Santa Ana after conducting the public hearing hereby approves Conditional Use Permit No. 2018-20, as conditioned in Exhibit A, attached hereto and incorporated herein for the project located at 2301 North Tustin Avenue. This decision is based upon the evidence submitted at the abovesaid hearing, which includes, but is not limited to: the Request for Planning Commission Action dated October 8, 2018 and October 22, 2018, and exhibits attached thereto; and the public testimony, written and oral, all of which are incorporated herein by this reference. ADOPTED this 22nd day of October, 2018. AYES: Commissioners: MCLOUGHLIN, MENDOZA, NGUYEN, VERINO (4) NOES: Commissioners: ABSENT: Commissioners: ABSTENTIONS: Commissioners: APPROVED AS TO FORM: Sonia R. Carvalho, City Attorney By:'�&' Lisa Storck Assistant City Attorney ALDERETE, CONTRERAS-LEO, REYNA (3) C Mark WAoughlin Chairperson Resolution No. 2018-31 Page 4 of 8 I CERTIFICATE OF ATTESTATION AND ORIGINALITY I, SARAH BERNAL, Recording Secretary, do hereby attest to and certify the attached Resolution No. 2018-31 to be the original resolution adopted by the Planning Commission of the City of Santa Ana on October 22, 2018. Date: kgT7,K _A4An-- &AwL Recording Secretary City of Santa Ana Resolution No. 2018-31 Page 5 of 8 EXHIBIT A Conditions of Approval for Conditional Use Permit No. 2018-20 Conditional Use Permit No. 2018-20 for after-hours operations (24 -hours) is approved subject to compliance, to the reasonable satisfaction of the Planning Manager, with applicable sections of the Santa Ana Municipal Code, the California Administrative Code, the California Building Standards Code, and all other applicable regulations. In addition, they shall meet the following conditions of approval: The Applicant must comply with each and every condition listed belowrip or to exercising the rights conferred by this conditional use permit. I. The Applicant must remain in compliance with all conditions listed below throughout the life of the conditional use permit Failure to comply with each and every condition may result in the revocation of the conditional use permit 1. All proposed site improvements must conform to the Site Plan Review (DP No. 2017- 37) and the staff report exhibits. 2. Any amendment to this conditional use permit must be submitted to the Planning Division for review. At that time, staff will determine if administrative relief is available or the conditional use permit must be amended. 3. Prior to the issuance of a building permit, a lot merger for 2031 North Tustin Avenue and 2151 East Santa Clara Avenue shall be recorded. 4. Prior to the issuance of a certificate of occupancy, the non -conforming pole sign on 2151 East Santa Clara Avenue must be removed. 5. Prior to the issuance of a building permit, a landscape and irrigation plan is to be submitted for review and approval. The landscape plan shall conform to the commercial landscape standards, Citywide Design Guidelines and the City's Water Efficient Landscape Ordinance. 6. Prior to the issuance of a building permit, a Property Maintenance Agreement must be recorded against the property. The Agreement will be subject to review and applicability by the Planning and Building Agency, the Community Development Agency, the Public Works Agency, and the City Attorney to ensure that the property and all improvements located thereupon are properly maintained, Developer (and the owner of the property upon which the authorized use and/or authorized improvements are located if different from the Applicant) shall execute a maintenance agreement with the City of Santa Ana which shall be recorded against the property and which shall be in a form reasonably satisfactory to the City Attorney. The Maintenance Agreement shall contain covenants, conditions and restrictions relating to the following: Resolution No. 2018-31 Page 6 of 8 (a) Compliance with operational conditions applicable during any period(s) of construction or major repair (e.g., proper screening and securing of the construction site; implementation of proper erosion control, dust control and noise mitigation measure; adherence to approved project phasing etc.); (b) Compliance with ongoing operational conditions, requirements and restrictions, as applicable (including but not limited to hours of operation, security requirements, the proper storage and disposal of trash and debris, enforcement of the parking management plan, and/or restrictions on certain uses, (c) Ongoing compliance with approved design and construction parameters, signage parameters and restrictions as well as landscape designs, as applicable; (d) Ongoing maintenance, repair and upkeep of the property and all improvements located thereupon (including but not limited to controls on the proliferation of trash and debris about the property; the proper and timely removal of graffiti; the timely maintenance, repair and upkeep of damaged, vandalized and/or weathered buildings, structures and/or improvements; the timely maintenance, repair and upkeep of exterior paint, parking striping, lighting and irrigation fixtures, walls and fencing, publicly accessible bathrooms and bathroom fixtures, landscaping and related landscape improvements and the like, as applicable); (e) If Developer and the owner of the property are different (e.g., if the Applicant is a tenant or licensee of the property or any portion thereof), both the Applicant and the owner of the property shall be signatories to the Maintenance Agreement and both shall be jointly and severally liable for compliance with its terms. (f) The Maintenance Agreement shall further provide that any party responsible for complying with its terms shall not assign its ownership interest in the property or any interest in any lease, sublease, license or sublicense, unless the prospective assignee agrees in writing to assume all of the duties and obligations and responsibilities set forth under the Maintenance Agreement. (g) The Maintenance Agreement shall contain provisions relating to the enforcement of its conditions by the City and shall also contain provisions authorizing the City to recover costs and expenses which the City may incur arising out of any enforcement and/or remediation efforts which the City may undertake in order to cure any deficiency in maintenance, repair or upkeep or to enforce any restrictions or conditions upon the use of the property. The Maintenance Agreement shall further provide that any unreimbursed costs and/or expenses incurred by the City to cure a deficiency in maintenance or to enforce use restrictions shall become a lien upon the property in an amount equivalent to the actual costs and/or expense incurred by the City. Resolution No. 2018-31 Page 7 of 8 (h) The execution and recordation of the Maintenance Agreement shall be a condition precedent to the issuance of final approval for any construction permit related to this entitlement. II. The following are requirements that will need to be addressed and/or approved by the Police Department prior to issuance of a building permit: 1. Submitted plans must indicate that all structures and parking lots comply with the provisions of Chapter 8, Article II, Division 3 of the Santa Ana Municipal Code (Building Security Ordinance). All applicable sections must be printed verbatim on the submitted set of plans. III. The following are requirements that will need to be addressed and/or approved by the Orange County Fire Authority prior to issuance of a building permit: 1. Prior to the issuance of a building permit, the Applicant shall submit the Architectural Plans (PR208) for Starbucks to the Orange County Fire Authority for review and approval. IV. The following are requirements that will need to be addressed and/or approved by the Public Works Agency prior to issuance of a building permit: The Applicant shall submit plans to install a `pork chop" right -turn only directional curb on-site within the driveway on Tustin Avenue. The driveway and `pork chop" shall be designed to City Standards and approved by the Public Works Agency. The improvements shall be installed prior to issuance of a Certificate of Occupancy. 2. The Applicant shall submit plans showing the installation of a right -turn only sign at the Santa Clara Avenue driveway. The improvements shall be installed prior to issuance of a Certificate of Occupancy. 3. The Applicant shall submit payment of the fair -share contribution in the amount of $30,898.00 for the Santa Clara Avenue and Tustin Avenue traffic signal modification. Resolution No. 2018-31 Page 8 of 8