HomeMy WebLinkAboutPRESENTATION - 75DMAINPLACE MALL
EXPANSION &
TRANSFORMATION
ro
June 4, 2019
City Council Meeting
75D
ry M+� �TA
Site Description
General Commercial (C-2)
Zoning
_ District Center (DC) General
L41
Plan
Surrounded by 1-5 & SR-22 fwys,
mixed -use & commercial
developments
Single-family residential across
freeways
Approx. 50 acres
Access from Main St., Main
Place Dr., and Broadway/
75E
G
�j 4 ti tfxiiA s,
c �
PROPOSED SPECIFIC PLAN
Contains standard Specific
Plan components required by
State law
Creates ten development sites
Mixed -use, hotel, office, or
residential lots
Mall expansion to the west
Central community space and
ancillary open space areas
Preserves existing mall at core / 75E
LEGEND
�..� Project Boundary
— — Parcel Line
Commercial Core
Urban Village
N BROADri' AY
PARCEr
I 5
N.A.P.
I
I
PARCEL
...Vle
MAIN STREET ...
-._---- - - - - - -
S .75E
_t
Ro----Project Boundary
sifications
Public Major Arterial
. s Public Secondary
Arterial
Public Local Street
Private Drive Aisle
• Private Drive Aisle' 'r '1 I \i�,
Entryway Classifications
OPrimary Entrance
OSecondary EntranceIr
Proposed Signal
aisle may be converted to
a pedestrian zone as part
of the implementing
project in this location.
r A t
v
U
--------------
N A.P.
I
I
I
I
� MACy'S
75E
ADDITIONAL COMPONENTS
Tentative Parcel Map (TPM)
Allows the site to be divided into 10 developable lots
Addresses street improvements and utilities
Development Agreement (DA)
Reflects community values
Incentivizes development of non-residential and
residential components over time
75E
DEVELOPMENT AGREEMENT
Initial 10-year term Other deal points
Automatic Extensions include:
Redevelopment of former
Nordstrom box and
construction of additional
commercial areas within the
first 7 years
Hotel construction within the
first 8 years
Additional extensions
Term and extensions
Non-residential
development
incentives
City access to open
spaces
Public art
Extensions for increasing gross Positive Local Impacts
annual general fund revenues 75E
generated
ORIGINAL EIR (1983)
Prepared for the Fashion Square Commercial
Center Project
Analyzed impacts of a mixed -use commercial
center:
1,600,000 sq. ft. of commercial,
1,500,000 sq. ft. of office,
1,200 hotel rooms
Required wide range of mitigation measures
Found significant and unavoidable traffic, noise,
population, and aesthetics impacts
75E
1996 ADDENDUM TO EIR
Considered impacts of modifying the approved plan to
expand commercial uses at the site
Provided environmental clearance for the site's current
entitlements:
1,509,255 sq. ft. of commercial
1,500,000 sq. ft. of office
400 hotel rooms
The 1996 entitlements are those which the applicant now
seeks to modify for the MainPlace Transformation Project
Found no new impacts from modifications to 1983
entitlements 75E
MAINPLACE TRANSFORMATION PROJECT
ADDENDUM
wAn addendum analyzes the change (delta)
between the approved entitlements and the
proposed project.
,*The 2019 Addendum analyzes the effects of:
Reducing commercial space by 109,255 sf
Reducing office space by 750,000 sf
Adding 1,900 residential units
75E
ECONOMIC AND FISCAL IMPACTS
Net Fiscal Impact and
Economic Benefit
Analysis prepared by
applicant for the
project
wThe contents and
conclusions of the
Analysis peer -review(
by a City consultant
75E
ECONOMIC AND FISCAL IMPACTS
Phase 1 of the project would generate:
Annual net positive fiscal revenues
With Measure X:
Full buildout would generate:
Annual gross fiscal revenues:
Annual gross expenditures:
Annual net positive fiscal impacts
With Measure X:
$5 million
Up to $7.1 million
$9.3 million
$2.8 million
$6.5 million
Up to $8.9 million
75E
PUBLIC OUTREACH
Over 78 outreach meetings were held with community
groups, representatives, officials, and other interested
parties
Developer's representatives met extensively with neighborhood
groups and local leaders
City staff met extensively with other public agencies; all
questions were answered and no concerns remain
Sunshine Ordinance Community Meeting on May 31,
2018
Planning Commission study session on February 28, 2019
Planning Commission public hearing on May 13, 2019
75E
RECOMMENDATION
Adopt resolutions for:
The 2019 Addendum to the 1983 EIR and Mitigation
Monitoring and Reporting Program
Tentative Parcel Map No. 2018-01 as conditioned to
subdivide the site into ten developable parcels
Adopt ordinances for:
Amendment Application No. 2018-04 to establish the
MainPlace Specific Plan (SP-4)
io Development Agreement No. 2018-02 for the 75E
MainPlace Development Agreement
S A N
75E
Imo`„` !` ��� 1' � . • rr; � � = v -3.-,
F
Mll
Ar-
Il f
f .
I
SPECIFIC PLAN CONTENTS
Development standards and allowable uses
Open space, pedestrian, and circulation plans
Design standards
Buildings
Streets
Implementation
75E
SPECIFIC PLAN CONTENTS
Development standards will ensure
compatibility with surrounding communities
10-story building height limit, unless along Main
Street
15-foot building setbacks from Main Street and
Main Place Drive
Maximum 6-level above -grade parking structures
Pedestrian zones along roadways will create a
place for people, not only vehicles
75E
yir
ZINO A a! areas ++�
in
Msoma Z
t
N
/ 75E
ONSITE STREET CONFIGURATIONS
SPECIFIC PLAN CONTENTS
Land use plan/allowable uses
Curated to create a dynamic, mixed -use village
Permitted, conditionally permitted, and temporary uses
Central open space area adjacent to former
Nordstrom building
Project's focal point
ow City access for public events
Additional open spaces on site will be placed
near uses with high pedestrian activity
75E
1-5
A'
VACANT
(N.A.P.)
241
56'
PUBLIC
MAIN PLACE DRIVE
4'
(from Bedford Road to Broadway)
9'
26 75E
ONSITE PARKING
Parking survey indicates a surplus of more than 1,000 parking
spaces during peak holiday season
New parking standards proposed for the mixed -use village
Maximizes shared parking due to live/work/play options
Commercial: 3.5 spaces per 1,000 sq. ff.
Residential: 1.65 spaces per unit, inclusive of guest
Hotel: ].I spaces per room
Office: 3 spaces per 1,000 sq. ff.
Shared, joint, or reciprocal parking permitted 75E
DEVELOPMENT AGREEMENT DEAL POINTS
Non-residential development incentives
Redevelopment of former Nordstrom box and
construction of additional commercial areas
within the first 7 years - automatic DA extension
Hotel construction within the first 8 years -
automatic DA extension
Additional DA extensions
Extensions for increasing gross annual general
fund revenues generated
*00
DEVELOPMENT AGREEMENT DEAL POINTS
City access to open spaces
12 days per each calendar year
Public art
Valued at one-half of one percent (0.50%)
Two water features
Positive Local Impacts
Minimum 10 free annual events
Local live -work preference and sourcing
Bike lanes, lockers, and supportive features
Local philanthropic engagements (education, arts, culture)
75E
NEW TECHNICAL STUDIES
Traffic Impact Study Hydrology and Hydraulics
Noise Assessment Study
Air Quality Assessment
Greenhouse Gas Emissions
Health Risk Assessment
Water Supply Assessment
Geologic and Seismic
Hazards
Water Quality Management
Plan
Sewer Capacity Study
Fiscal Impact and Economic
Benefit Analysis
75E
WHAT IS AN EIR ADDENDUM?
When an agency is asked to approve
modifications to an existing project,
For which an EIR has previously been certified.
It's a fact -based method of evaluating the
modifications and determining whether
subsequent EIR review might be required.
Public Resources Code §21 166 prohibits
proceeding with a subsequent EIR, unless one of
three specific conditions are met:
75E
EIR ADDENDUM
Substantial project changes proposed that
would result in new or substantially more severe
impacts than disclosed in the previous EIR;
2. Substantial changes in circumstances that would
result in new or substantially more severe
impacts than disclosed in the previous EIR; or
3. Significant new information has come to light
that shows there will be new or substantially
more severe impacts than disclosed in the
previous EIR.
75E
WHAT IS AN EIR ADDENDUM?
EIR Addendum required when changes or
additions are necessary to a previous EIR,
But none of the three circumstances allowing
preparation of a subsequent EIR have
occurred.
75E
MITIGATION MEASURES
1983 EIR's mitigation measures were analyzed to
determine whether they continue to apply
8 are ongoing and applicable
1 1 are no longer applicable, because already
completed or superseded by law
75E
ADDENDUM FOUND REDUCTIONS IN
TRAFFIC FROM CURRENT ENTITLEMENTS
Traffic study considered impacts at 22 study
intersections
Determined that the project would generate
6,251 fewer daily trips than the current
entitlements
165 fewer am peak hour trips
995 fewer pm peak hour trips
No new
or substantially more
severe
traffic
impacts
than
were disclosed
in 1983
EIR
75E
ADDENDUM FOUND REDUCTIONS IN AIR
QUALITY EMISSIONS FROM CURRENT
ENTITLEMENTS
Analysis determined operational emissions would
be far lower than those listed in 1983 EIR
Reactive Organic Gas (ROG) emissions would be
slightly higher than current entitlements, but not
enough to result in a new significant impact
No new or substantially more severe air quality
impacts than were disclosed in 1983 EIR
75E
LEGEND _
—..— Project Boundary
---- Parcel Line
Parking Area XX• Boundary
Number of Spaces
N BROADWAY
75E