HomeMy WebLinkAbout1 - CIP 2018-20191-1
1-2
1-3
EXHIBIT 1
1-4
This page left blank intentionally.
1-5
LS 4.22.19
RESOLUTION NO. 2019-xx
A RESOLUTION OF THE PLANNING COMMISSION OF
THE CITY OF SANTA ANA FINDING THE FISCAL YEAR
2019-2020 CAPITAL IMPROVEMENT PROGRAM
CONSISTENT WITH THE SANTA ANA GENERAL PLAN
BE IT RESOLVED BY THE PLANNING COMMISSION OF THE CITY OF
SANTA ANA AS FOLLOWS:
Section 1. The Planning Commission of the City of Santa Ana hereby finds,
determines and declares as follows:
A. California Government Code Section 65401 requires review of the Capital
Improvement Program (CIP) by the Planning Commission to determine that
the program is consistent with the General Plan.
B. The City has prepared a Fiscal Year 2019-2020 CIP.
C. On April 22, 2019, the Planning Commission reviewed said request and
considered all factors relating to the General Plan consistency of the
Fiscal Year 2019-2020 CIP.
D. The proposed Capital Improvement Program is consistent with the Santa
Ana General Plan because the projects under the Fiscal Year 2019-2020
CIP are consistent with one or more of the following General Plan goals and
policies:
Circulation Element:
i. Policy 1.6 encourages the improvement of intersection
capacity on major arterials to accommodate increased traffic
demands.
ii. Policy 1.7 supports the coordination of traffic signal
synchronization citywide, and with adjacent jurisdictions.
iii. Policy 1.9 encourages the use of the Pacific Electric Railroad
right-of-way as a transportation corridor.
iv. Policy 2.2 supports bus turnouts along heavily traveled arterial
streets to minimize traffic conflicts.
v. Policy 2.5 supports the upkeep of the City’s streets and
parkways based upon an established maintenance schedule.
vi. Policy 3.5 supports the enhancement of sidewalks and
pedestrian systems to promote their use as a means of travel.
vii. Policy 3.6 supports the maximization of public rights-of-way
for pedestrian and bicycle paths.
1-6
viii. Policy 3.8 encourages the development of bicycle paths that
maximize access to major activity centers, neighborhoods
jurisdictions, and regional bicycle paths.
ix. Policy 5.3 encourages the development of landscape
medians on major arterials.
Conservation Element:
x. Goal 1 encourages the protection of the public health, safety
and welfare through effective management of natural
resources.
xi. Goal 2 supports the preservation, maintenance and proper
use of natural and cultural resources.
xii. Goal 3 supports the preservation and enhancement of
aesthetic and environmental quality of the community for the
enjoyment of all residents.
Growth Management Element:
xiii. Goal 1 supports the reduction of traffic congestion.
xiv. Goal 2 supports the improvement of adequate transportation
and public facilities for existing and future residents.
Housing Element:
xv. Policy 1.4 encourages the creation and maintenance of parks
and open spaces; the planting of trees, green parkways and
medians; supports healthy food options, and encourages the
maintenance of continuous pattern of pathways that
encourage an active healthy lifestyle.
xvi. Policy 1.5 encourages quality community facilities, physical
infrastructure, traffic management and parking control, and
other public services to promote the livability, safety, and
vitality of neighborhoods.
Land Use Element:
xvii. Policy 1.7 supports open space in under-served areas.
Open Space, Parks and Recreation Element:
xviii. Goal 1 encourages sufficient open space to meet the
recreational and aesthetic needs of the community.
xix. Goal 2 supports public access and use of open space
facilities.
1-7
Public Safety Element:
xx. Goal 1 encourages the preservation of a safe and secure
environment for all Santa Ana residents and workers.
Section 2. In accordance with the California Environmental Quality Act (CEQA)
and the CEQA Guidelines, the recommended action is Categorically Exempt from CEQA
per Class 6 (Information Collection) Section 15306. This exemption consists of basic data
collection, research, and resource evaluation activities which do not result in a serious or
major disturbance to an environmental resource. These may be strictly for information
gathering purposes, or as part of a study leading to an action which a public agency has
not yet approved, adopted, or funded.
Section 3. The Planning Commission herby determines that the Fiscal Year
2019-2020 Capital Improvement Program is consistent with the goals and policies
outlined in the City’s General Plan.
ADOPTED this 22nd day of April, 2019.
AYES: Commissioners:
NOES: Commissioners:
ABSENT: Commissioners:
ABSTENTIONS: Commissioners:
_______________________
Mark McLoughlin
Chairperson
APPROVED AS TO FORM:
Sonia R. Carvalho, City Attorney
By:________________________
Lisa Storck
Assistant City Attorney
1-8
CERTIFICATE OF ATTESTATION AND ORIGINALITY
I, SARAH BERNAL, Commission Secretary, do hereby attest to and certify the attached
Resolution No. 2019-xx to be the original resolution adopted by the Planning
Commission of the City of Santa Ana on April 22, 2019.
Date: ________________ ____________________________________
Commission Secretary
City of Santa Ana
1-9
EXHIBIT 2
1-10
This page left blank intentionally.
1-11
2019/
2020
CITY OF SANTA ANA
Bristol Protected Bike Lanes
MacArthur Slurry Raitt to
Bristol
Flower Slurry Sunflower to
MacArthur
Roosevelt Walker Community Center and
Recreational Improvements
Parking Structure
Improvements
DRAFT
4/12/2019
1-12
4/12/2019
- 1 -
DESCRIPTION OF FUNDING SOURCES
ACTIVE TRANSPORTATION PROGRAM (ATP) – The ATP was
created by Senate Bill 99 (Chapter 359, Statutes of 2013) and
Assembly Bill 101 (Chapter 354, Statutes of 2013) to encourage
increased use of active modes of transportation, such as biking and
walking. ATP is a federal and state funded program which provides
construction and educational grants for projects that increase the
proportion of biking and walking, increase traffic safety and mobility
for pedestrians and cyclists, and reduce childhood obesity.
ACTIVE TRANSPORTATION PROGRAM SB-1 AUGMENTATION
(ATP SB-1) – Most recently, Road Repair and Accountability Act
of 2017, enacted by Senate Bill 1 (Chapter 20, Statutes of 2017)
added approximately $100 million per year in available funds for
the ATP. This will nearly double the amount of available funds for
the Active Transportation Program.
CELL TOWER REVENUE – The City has 20 cell towers in city park
sites. The revenue generated from the cell sites originally was
budgeted for park improvements (repair work) in the park impacted
by the cell tower. A portion of the revenue is transferred to the
general fund. The remaining portion is used for the original intent
to make park repairs in the park that are impacted by the cell tower.
CIVIC CTR - CAPITAL PROJECT (CIVIC CTR - CAPITAL PROJ)
– Civic Center Funds are generated through parking revenue from
the Civic Center parking lots and structures (i.e., Super Block
Parking Lot, O.C. Courthouse/Library Parking Structure, and the
Stadium Parking Structure). These funds pay for Civic Center
parking structure maintenance, and Civic Center Special Projects.
COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM
(CDBG) – The Housing and Community Development Act of 1974
returns income tax funds to cities and counties to develop viable
urban communities, primarily for the benefit of low and moderate
income people. This U.S. Department of Housing and Urban
Development program gives priority to activities that help to
eliminate blight, with emphasis on residential areas. CDBG
projects are carried out by several operating departments with the
City and by sub-agents. Public hearings are held to plan projects
for the next fiscal year. The selected projects are recommended by
citizens, commissioners, and staff.
GAS TAX – Gas Tax funds are derived from the Motor Vehicle Fuel
Tax (HUTA or Highway Users Tax Account). Motorists pay a tax for
fuel consumption. It is apportioned to cities according to population
and can only be utilized in the maintenance and construction of the
street system. Examples of programs funded by Gas Tax include
Roadway Markings/Signs, as well as Traffic Signals, Street
Maintenance and Street Rehabilitation.
1-13
4/12/2019
- 2 -
DESCRIPTION OF FUNDING SOURCES
GENERAL FUND – The general fund is supported by revenue
received from sales tax, property tax, utility tax and other
miscellaneous tax revenue which provides funding for City
operations.
MEASURE M2 COMPETITIVE STREET: ACE (MM2: ACE)–
Complements freeway improvement initiatives underway and
supplements development mitigation opportunities on arterials
throughout the Master Plan of Arterial Highways (MPAH).
MEASURE M2 FAIRSHARE – This local fair share program
returns a portion of the Measure M2 Streets and Roads revenues
to the cities and the County of Orange once specific program
requirements are met. Disbursement amounts are based on a
formula that accounts for population, street mileage, and sales tax
collected.
OCTA OC STREETCAR FUNDS (OCTA OC STREETCAR
FUNDS) – Orange County Transportation Authority (OCTA) funds
allocated for the OC Streetcar Project.
PARK ACQUISITION & DEVELOPMENT FUNDS (A & D) – Any
person adding a net increase in residential units or converting
apartments to condominiums in the City is charged a Residential
Development Fee. These fees are used for the acquisition,
construction, and renovation of park and recreation facilities. The
City Council has established a standard of two acres of park and
recreation facilities per one thousand (1,000) population in the City.
Fees vary depending on the type and number of residential units.
Fees are paid at the time of application for a building permit, and
no building permit is issued until such fees are paid.
SEWER CONNECTION PROJECTS (SEWER CONNECTION
PROJECTS)– The Sewer Connection Fee is collected from
various types of development based on the number of fixture units
and the cost per lineal foot of construction of a main sewer line. All
monies received by the City as a fee for connection to the public
sewers are deposited into the Sewer Connection Fee Fund and
used for the construction of sewers. Fees are paid at the time of
application for a sewer connection permit, and no connection
permit is issued until such fees are paid.
TRANSPORTATION SYSTEM IMPROVEMENT AREA FUND
(AREA FEES) – Ordinance NS-1651, adopted in 1982,
established the concept of transportation improvement areas. In
addition, the City has executed “Joint Exercise of Powers
Agreements” with the cities of Tustin and Orange specifically
covering areas adjacent to those cities. These Area Fees are
charged to new development to offset the cost of transportation
system improvements within that area. The City has six
transportation improvement areas. The fee charged is based on
the square footage of the proposed development. The fee may be
changed from time to time by resolution of the City Council. Fees
are paid at the time of application for a building permit.
1-14
4/12/2019
- 3 -
DESCRIPTION OF FUNDING SOURCES
WATER CAPITAL FUND – The City charges a user fee for
providing water services to residents and businesses in Santa Ana.
All monies are used to fund operating and maintenance costs, as
well as capital improvements of the City’s water system.
Approximately 10% to 20% of these funds are allocated to water
system capital improvements each year.
1-15
CITY OF SANTA ANAFY 19/20Scale: None1-16
PROJECTS CDBG CAPITAL
OUTLAY
WATER
CAPITAL
SEWER AREA
FEES
A & D
FUNDS
GAS TAX MEASURE
M2
OTHER TOTAL
I.STREET IMPROVEMENTS
FY 19/20 PLANNING
1. Pavement Management 50,000 200,000 250,000
2. Project Development 50,000 100,000 150,000
3. Right-of-Way Management 50,000 100,000 150,000
Subtotal FY 19/20 Planning 150,000 400,000 550,000
FY 19/20 CURB, GUTTER, SIDEWALK IMPROVEMENTS
4. First Street Pedestrian Improvements 4,032,000 (1)4,032,000
5. Omnibus Concrete 50,000 50,000
Subtotal FY 19/20 Curb, Gutter, Sidewalk
Improvements
50,000 4,032,000 4,082,000
FY 19/20 NEIGHBORHOOD STREET RESURFACING
6. Residential Street Repair Program 921,227 921,227
Subtotal FY 19/20 Neighborhood Street Resurfacing 921,227 921,227
FY 19/20 LOCAL STREET RESURFACING
7. Local Street Preventative Maintenance 2,000,000 2,000,000
Subtotal FY 19/20 Local Street Resurfacing 2,000,000 2,000,000
FY 19/20 ARTERIAL STREET REHABILITATION
8. Euclid Street Rehabilitation 1st to Hazard 1,200,000 (2)1,200,000
9. Euclid Street Rehabilitation: City Limit to McFadden 970,000 (2)970,000
10. Euclid Street Rehabilitation: McFadden to 1st 1,100,000 (2)1,100,000
11. MacArthur Boulevard Rehabilitation: Santa Ana River to
Harbor
80,000 (2)80,000
12. MacArthur Boulevard Resurfacing: Flower to Main 1,100,000 (2)1,100,000
13. Main Street Rehabilitation: Warner to Edinger 1,148,541 (2)1,148,541
= Funding approved in Multiple Prior Fiscal Years - 1 -PY
CITY OF SANTA ANA
ONE-YEAR CAPITAL IMPROVEMENT PROGRAM
FY 2019/2020
2019-04-12
1-17
PROJECTS CDBG CAPITAL
OUTLAY
WATER
CAPITAL
SEWER AREA
FEES
A & D
FUNDS
GAS TAX MEASURE
M2
OTHER TOTAL
I.STREET IMPROVEMENTS
Subtotal FY 19/20 Arterial Street Rehabilitation 5,598,541 5,598,541
FY 19/20 STREET/BRIDGE IMPROVEMENTS & WIDENING
14. Bristol Street Improvements and Widening: Phase 3B -
Washington to 17th
(PY)572,000 600,000 1,172,000
Subtotal FY 19/20 Street/Bridge Improvements &
Widening
572,000 600,000 1,172,000
TOTAL STREET IMPROVEMENTS 921,227 572,000 800,000 2,400,000 9,630,541 14,323,768
II.TRAFFIC IMPROVEMENTS
FY 19/20 PLANNING
15. Bike Lane Project Development 80,000 80,000
16. OC Streetcar 1,500,000 (3)1,500,000
17. Traffic Management Plans 50,000 50,000
18. Traffic Safety Project Development 50,000 50,000
Subtotal FY 19/20 Planning 180,000 1,500,000 1,680,000
FY 19/20 TRAFFIC IMPROVEMENTS
19. Edinger Avenue Traffic Signal Synchronization 100,000 100,000
20. Talbert Ave/ MacArthur Blvd Traffic Signal
Synchronization
100,000 100,000
21. Traffic Signal Equipment Replacement 100,000 100,000
22. Warner Avenue Traffic Signal Synchronization 100,000 100,000
Subtotal FY 19/20 Traffic Improvements 400,000 400,000
FY 19/20 TRAFFIC SAFETY / MOBILITY
23. Davis Elementary SRTS 4,834,000 (1)4,834,000
24. Fremont Elementary and Spurgeon Intermediate SRTS 927,000 (4)927,000
= Funding approved in Multiple Prior Fiscal Years - 2 -PY
CITY OF SANTA ANA
ONE-YEAR CAPITAL IMPROVEMENT PROGRAM
FY 2019/2020
2019-04-12
1-18
PROJECTS CDBG CAPITAL
OUTLAY
WATER
CAPITAL
SEWER AREA
FEES
A & D
FUNDS
GAS TAX MEASURE
M2
OTHER TOTAL
II.TRAFFIC IMPROVEMENTS
FY 19/20 TRAFFIC SAFETY / MOBILITY
25. Jackson Elementary Improvements 25,000 25,000
26. Kennedy Elementary and Villa Fundamental Intermediate
SRTS
191,000 (4)191,000
27. West Willits Street Protected Bicycle Lanes: Fairview to
Raitt
2,475,000 (1)2,475,000
Subtotal FY 19/20 Traffic Safety / Mobility 25,000 8,427,000 8,452,000
TOTAL TRAFFIC IMPROVEMENTS 605,000 9,927,000 10,532,000
III.UTILITY/DRAINAGE/LIGHTING IMPROVEMENTS
FY 19/20 SEWER IMPROVEMENTS
28. Bristol Street Sewer Main Improvements Phase 3A - Civic
Center to Washington
260,000 260,000
29. Citywide Sewer Main Improvements 2,860,000 2,860,000
30. Citywide Sewer Main Improvements Phase 2 1,560,000 1,560,000
31. Flower Street Sewer Main Improvements 2,100,000 2,100,000
32. Warner Garnsey Sewer Main Diversion Improvements 135,000 135,000
33. Washington Square Sewer Main Improvements 975,000 975,000
34. Willard Neighborhood Sewer Main Improvements 1,560,000 1,560,000
35. Wright Street Sewer Main Improvements 163,000 163,000
Subtotal FY 19/20 Sewer Improvements 9,613,000 9,613,000
FY 19/20 WATER IMPROVEMENTS
36. Automated Metering Infrastructure - Citywide 817,300 817,300
37. Bristol Street Water Main Improvements Phase 3A - Civic
Center to Washington
200,000 200,000
= Funding approved in Multiple Prior Fiscal Years - 3 -PY
CITY OF SANTA ANA
ONE-YEAR CAPITAL IMPROVEMENT PROGRAM
FY 2019/2020
2019-04-12
1-19
PROJECTS CDBG CAPITAL
OUTLAY
WATER
CAPITAL
SEWER AREA
FEES
A & D
FUNDS
GAS TAX MEASURE
M2
OTHER TOTAL
III.UTILITY/DRAINAGE/LIGHTING IMPROVEMENTS
FY 19/20 WATER IMPROVEMENTS
38. Fisher Park Neighborhood Water Improvements 3,640,000 3,640,000
39. French Park Neighborhood Water Improvements 340,000 340,000
40. Lacy Neighborhood Water Improvements 290,000 290,000
41. Saint Gertrude and Grand Avenue Water Main
Replacement
950,000 950,000
42. Thornton Park Water Main Improvements (PY)2,860,000 2,860,000
43. Warner Avenue Water Main Improvements - Bristol to
Main
150,000 150,000
44. Warner Avenue Water Main Improvements - Main to Oak 100,000 100,000
Subtotal FY 19/20 Water Improvements 9,347,300 9,347,300
FY 19/20 FACILITY IMPROVEMENTS
45. Cambridge Pump Station Improvements 500,000 500,000
46. Pressure Reducing Vault Power & Controls Improvements 120,000 120,000
47. SA-2 Vault Improvements 225,000 225,000
48. SA-5 Vault Relocation 1,150,000 1,150,000
49. Segerstrom (San Lorenzo) Sewer Lift Station
Reconstruction
3,000,000 3,000,000
50. Washington Well Site Improvements 630,000 630,000
51. Well No. 29 - Improvements 2,000,000 2,000,000
52. Well No. 32 - Rehabilitation 2,850,000 2,850,000
Subtotal FY 19/20 Facility Improvements 7,475,000 3,000,000 10,475,000
FY 19/20 STREET LIGHT IMPROVEMENTS
53. Street Light Re-wiring and Repairs 200,000 (5)200,000
Subtotal FY 19/20 Street Light Improvements 200,000 200,000
= Funding approved in Multiple Prior Fiscal Years - 4 -PY
CITY OF SANTA ANA
ONE-YEAR CAPITAL IMPROVEMENT PROGRAM
FY 2019/2020
2019-04-12
1-20
PROJECTS CDBG CAPITAL
OUTLAY
WATER
CAPITAL
SEWER AREA
FEES
A & D
FUNDS
GAS TAX MEASURE
M2
OTHER TOTAL
III.UTILITY/DRAINAGE/LIGHTING IMPROVEMENTS
TOTAL UTILITY/DRAINAGE/LIGHTING
IMPROVEMENTS
16,822,300 12,613,000 200,000 29,635,300
IV.CITY FACILITY IMPROVEMENTS
FY 19/20 PARK FACILITY IMPROVEMENTS
54. 6th and Lacy Park Improvement (PY)185,000 (5)185,000
55. Adams Park Irrigation Renovation 100,000 (6)100,000
56. Adams Park Parking Lot Slurry Seal 65,000 (6)65,000
57. Adams Park Restroom Renovation 250,000 (6)250,000
58. Adams Park Site Furnishings/Signage 100,000 (6)100,000
59. Centennial Park Fencing Between Lake & Play Area (PY)120,000 (5)120,000
60. Centennial Park Security Lights 200,000 200,000
61. Centennial Park Walkway Improvements 625,000 625,000
62. Civic Center Courthouse Dry Streambed 800,000 (7)800,000
63. Civic Center Irrigation Controller Replacement - Phase II 50,000 (7)50,000
64. Civic Center Japanese Garden Renovation 200,000 (7)200,000
65. Civic Center Lift Stations Construction 1,400,000 (7)1,400,000
66. Civic Center Perimeter Lighting Design 186,000 (7)186,000
67. Civic Center Plaza of the Flag/Fountain Re-caulk Plaza
Slab
40,000 (7)40,000
68. Civic Center Plaza of the Flag/Fountain Structural
Analysis
90,000 (7)90,000
69. El Salvador Park Basketball Court & Court Lighting
Renovation
50,000 200,000 (6)250,000
70. El Salvador Pool Replastering 80,000 (6)80,000
71. Jerome Ballfield Lighting 510,000 510,000
= Funding approved in Multiple Prior Fiscal Years - 5 -PY
CITY OF SANTA ANA
ONE-YEAR CAPITAL IMPROVEMENT PROGRAM
FY 2019/2020
2019-04-12
1-21
PROJECTS CDBG CAPITAL
OUTLAY
WATER
CAPITAL
SEWER AREA
FEES
A & D
FUNDS
GAS TAX MEASURE
M2
OTHER TOTAL
IV.CITY FACILITY IMPROVEMENTS
FY 19/20 PARK FACILITY IMPROVEMENTS
72. Jerome French Drain Project (PY)100,000 (6)100,000
73. Jerome Pool Replastering 80,000 (6)80,000
74. Memorial Swimming Pool Replastering (PY)50,357 50,357
75. Riverview Park Ballfield Sports Lighting Renovation 80,000 220,000 (6)300,000
76. Salgado Swimming Pool Replastering (PY)78,846 78,846
77. Santa Anita Park Synthetic Turf (PY)172,443 172,443
78. Stadium Locker Room Renovation 60,000 (6)60,000
79. Stadium Press Box Re-Roofing 15,000 (6)15,000
80. Thornton Park Parking Lot Renovation 100,000 100,000
81. Windsor Park Site Furnishings 30,000 (6)30,000
Subtotal FY 19/20 Park Facility Improvements 1,607,443 259,203 4,371,000 6,237,646
TOTAL CITY FACILITY IMPROVEMENTS 1,607,443 259,203 4,371,000 6,237,646
GRAND TOTAL ONE-YEAR CIP
PROJECTS
2,528,670 0 16,822,300 12,613,000 572,000 259,203 800,000 3,005,000 24,128,541 60,728,714
= Funding approved in Multiple Prior Fiscal Years - 6 -PY
CITY OF SANTA ANA
ONE-YEAR CAPITAL IMPROVEMENT PROGRAM
FY 2019/2020
2019-04-12
1-22
CITY OF SANTA ANA ONE-YEAR CAPITAL IMPROVEMENT PROGRAM FY 2019/2020 "OTHER" FUNDING SOURCES (1) ACTIVE TRANSPORTATION PROGRAM(2) ROAD MAINTENANCE AND REHABILITATION ACCOUNT(3) OCTA OC STREETCAR FUNDS (4) ACTIVE TRANSPORTATION PROGRAM SB1 AUGMENTATION(5) GENERAL FUND (6) CELL TOWER REVENUE (7) CIVIC CTR - CAPITAL PROJECT 2019-04-121-23
PROJECT TITLE:
Pavement Management
PROJECT CATEGORY:
Street Improvements -
Planning
PROJECT NEED:
The Pavement Management System (PMS) should be
current and updated in order to better program projects
for the City's CIP and to understand the total deferred
maintenance of the network for budgeting purposes.
Also, OCTA requires updated PMS reports to continue
the City's eligibility for Measure M funds.
PROJECT DESCRIPTION:
The City's Pavement Management System was first
prepared in 1992. This project provides for a
Citywide inventory of street pavement to identify any
changes in condition and record any damage.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
GAS TAX $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000
M2 LOCAL
FAIRSHARE
$200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000
TOTAL $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Engineering $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000
TOTAL $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $250,000
LOCATION MAP
CITYWIDE
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Design Engineering Kenny Nguyen, Senior Civil Engineer
- 1 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-24
PROJECT TITLE:
Project Development
PROJECT CATEGORY:
Street Improvements -
Planning
PROJECT NEED:
Staff consistently applies for grant funding to implement
the Capital Improvement Program. A significant amount
of staff effort is expended in analyzing a project to
determine its feasibility and competitiveness. In
addition, staff participates in various regional inter-
agency forums and responds to Council, resident, and
business inquiries.
PROJECT DESCRIPTION:
Includes staff coordination related to grant application
preparation and submittal. Project Development also
entails staff response to City Council, resident, and
business inquiries. This includes planning,
environmental, preliminary engineering, and right-
ofway.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
GAS TAX $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000
M2 LOCAL
FAIRSHARE
$100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $100,000
TOTAL $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $150,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Other $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $150,000
TOTAL $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $150,000
LOCATION MAP
CITYWIDE
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Design Engineering Jason Gabriel, Principal Civil Engineer
- 2 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-25
PROJECT TITLE:
Right-of-Way Management
PROJECT CATEGORY:
Street Improvements -
Planning
PROJECT NEED:
Each fiscal year, the Public Works Agency undertakes
several roadway widening projects which require right-
of-way acquisitions. Additionally, the Public Works
Agency is responsible for maintaining and coordinating
all real estate activities (i.e., City-owned properties,
easements, etc.).
PROJECT DESCRIPTION:
This project provides for the management and
administration of right-of-way acquisitions/real estate
transactions, which requires coordination of activities
with the City Attorney's Office and other agencies.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
GAS TAX $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000
M2 LOCAL
FAIRSHARE
$100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $100,000
TOTAL $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $150,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Other $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $150,000
TOTAL $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $150,000
LOCATION MAP
CITYWIDE
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Design Engineering Jason Gabriel, Principal Civil Engineer
- 3 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-26
PROJECT TITLE:
First Street Pedestrian Improvements
PROJECT CATEGORY:
Street Improvements -
Curb, Gutter, Sidewalk Improvements
PROJECT NEED:
This project is designed to increase pedestrian safety
and mobility along the corridor.
PROJECT DESCRIPTION:
Design and construction of pedestrian safety
improvements including sidewalk widening, protected
pedestrian crossings and ADA upgrades.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
ATP $4,032,000
TOTAL $4,032,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $4,032,000
TOTAL $4,032,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Design Engineering Sean Thomas, Senior Civil Engineer
- 4 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-27
PROJECT TITLE:
Omnibus Concrete
PROJECT CATEGORY:
Street Improvements -
Curb, Gutter, Sidewalk Improvements
PROJECT NEED:
Curbs, gutters, sidewalks throughout the City have
deteriorated and need replacement to reduce potential
liability and improve the City's image.
PROJECT DESCRIPTION:
Replacement of defective sidewalk, curb, gutter, and
installation of wheelchair ramps.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
GAS TAX $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000
TOTAL $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Engineering $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000
TOTAL $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000
LOCATION MAP
CITYWIDE
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Design Engineering Jason Gabriel, Principal Civil Engineer
- 5 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-28
PROJECT TITLE:
Residential Street Repair Program
PROJECT CATEGORY:
Street Improvements -
Neighborhood Street Resurfacing
PROJECT NEED:
The local street network has 316 miles citywide. In
2007 the City embarked on an extensive citywide
improvement plan to rehabilitate and slurry seal the
majority of the network. By the end of 2015, the City
has completed rehabilitating all asphalt residential
streets and currently working toward improving all
residential concrete streets.
PROJECT DESCRIPTION:
This project entails the rehabilitation of existing
roadway pavement for local streets. The project will
include the removal and replacement of existing
concrete streets. Various replacement pavement
strategies will be investigated to determine the most
cost effective and maintainable treatment. Minor
concrete repair to severely damaged or missing curbs,
gutters, sidewalks, and wheelchair ramps will also be
included. Work in FY 19/20 will focus on the Heninger
Neighborhood.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
CDBG Programs $921,227 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000
TOTAL $921,227 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $852,977 $925,000 $925,000 $925,000 $925,000 $925,000 $925,000
Engineering $68,250 $75,000 $75,000 $75,000 $75,000 $75,000 $75,000
TOTAL $921,227 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Design Engineering Jason Gabriel, Principal Civil Engineer
- 6 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-29
PROJECT TITLE:
Local Street Preventative Maintenance
PROJECT CATEGORY:
Street Improvements -
Local Street Resurfacing
PROJECT NEED:
The City's Pavement Management Program has been
developed to identify the preventative maintenance
requirements for the City's street network. The
application of a surface seal to streets with
improvements constructed in the last 10 years will
ensure a high level of service for years to come.
PROJECT DESCRIPTION:
This project provides for the application of crack seal
and slurry seal to various streets citywide.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
M2 LOCAL
FAIRSHARE
$2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000
TOTAL $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $1,850,000 $1,850,000 $1,850,000 $1,850,000 $1,850,000 $1,850,000 $1,850,000
Engineering $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $150,000
TOTAL $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000
LOCATION MAP
CITYWIDE
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Design Engineering Kenny Nguyen, Senior Civil Engineer
- 7 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-30
PROJECT TITLE:
Euclid Street Rehabilitation 1st to Hazard
PROJECT CATEGORY:
Street Improvements -
Arterial Street Rehabilitation
PROJECT NEED:
The City's Pavement Management Program (PMP) has
been developed to prioritize and recommend the most
cost-effective roadway repairs, and maximize the return
from available funding for street pavement. This
segment of Euclid Street pavement rehabilitation is
identified as a high priority in the PMP.
PROJECT DESCRIPTION:
Reconstruction/resurfacing of existing pavement and
replacement/installation of missing or damaged, curbs,
gutters, sidewalks, driveway approaches, and
wheelchair ramps within this segment of roadway.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
RMRA SB1 $1,200,000
TOTAL $1,200,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $1,111,000
Engineering $89,000
TOTAL $1,200,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Design Engineering Sean Thomas, Senior Civil Engineer
- 8 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-31
PROJECT TITLE:
Euclid Street Rehabilitation: City Limit to
McFadden
PROJECT CATEGORY:
Street Improvements -
Arterial Street Rehabilitation
PROJECT NEED:
The City's Pavement Management Program (PMP) has
been developed to prioritize and recommend the most
cost-effective roadway repairs, and maximize the return
from available funding for street pavement. This
segment of Euclid Street pavement rehabilitation is
identified as a high priority in the PMP.
PROJECT DESCRIPTION:
Reconstruction/resurfacing of existing pavement and
replacement/installation of missing or damaged, curbs,
gutters, sidewalks, driveway approaches, and
wheelchair ramps within this segment of roadway.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
RMRA SB1 $970,000
TOTAL $970,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $895,000
Engineering $75,000
TOTAL $970,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Design Engineering Sean Thomas, Senior Civil Engineer
- 9 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-32
PROJECT TITLE:
Euclid Street Rehabilitation: McFadden to 1st
PROJECT CATEGORY:
Street Improvements -
Arterial Street Rehabilitation
PROJECT NEED:
The City's Pavement Management Program (PMP) has
been developed to prioritize and recommend the most
cost-effective roadway repairs, and maximize the return
from available funding for street pavement. This
segment of Euclid Street pavement rehabilitation is
identified as a high priority in the PMP.
PROJECT DESCRIPTION:
Reconstruction/resurfacing of existing pavement and
replacement/installation of missing or damaged, curbs,
gutters, sidewalks, driveway approaches, and
wheelchair ramps within this segment of roadway.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
RMRA SB1 $1,100,000
TOTAL $1,100,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $1,019,000
Engineering $81,000
TOTAL $1,100,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Design Engineering Sean Thomas, Senior Civil Engineer
- 10 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-33
PROJECT TITLE:
MacArthur Boulevard Rehabilitation: Santa Ana
River to Harbor
PROJECT CATEGORY:
Street Improvements -
Arterial Street Rehabilitation
PROJECT NEED:
The City's Pavement Management Program (PMP) has
been developed to prioritize and recommend the most
cost-effective roadway repairs, and maximize the return
from available funding for street pavement. This
segment of MacArthur Boulevard pavement
rehabilitation is identified as a high priority in the PMP.
PROJECT DESCRIPTION:
Reconstruction/resurfacing of existing pavement as a
joint project with City of Costa Mesa
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
RMRA SB1 $80,000
TOTAL $80,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $80,000
TOTAL $80,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Design Engineering Kenny Nguyen, Senior Civil Engineer
- 11 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-34
PROJECT TITLE:
MacArthur Boulevard Resurfacing: Flower to
Main
PROJECT CATEGORY:
Street Improvements -
Arterial Street Rehabilitation
PROJECT NEED:
The City's Pavement Management Program (PMP) has
been developed to prioritize and recommend the most
cost-effective roadway repairs, and maximize the return
from available funding for street pavement. This
segment of MacArthur Boulevard pavement
rehabilitation is identified as a high priority in the PMP.
PROJECT DESCRIPTION:
Reconstruction/resurfacing of existing pavement and
replacement/installation of missing or damaged, curbs,
gutters, sidewalks, driveway approaches, and
wheelchair ramps within this segment of roadway.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
RMRA SB1 $1,100,000
TOTAL $1,100,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $1,019,000
Engineering $81,000
TOTAL $1,100,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Design Engineering Kenny Nguyen, Senior Civil Engineer
- 12 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-35
PROJECT TITLE:
Main Street Rehabilitation: Warner to Edinger
PROJECT CATEGORY:
Street Improvements -
Arterial Street Rehabilitation
PROJECT NEED:
The City's Pavement Management Program (PMP) has
been developed to prioritize and recommend the most
cost-effective roadway repairs, and maximize the return
from available funding for street pavement. This
segment of Main Street pavement rehabilitation is
identified as a high priority in the PMP.
PROJECT DESCRIPTION:
Reconstruction/resurfacing of existing pavement and
replacement/installation of missing or damaged, curbs,
gutters, sidewalks, driveway approaches, and
wheelchair ramps within this segment of roadway.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
RMRA SB1 $1,148,541
TOTAL $1,148,541
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $1,148,541
TOTAL $1,148,541
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Design Engineering Jason Gabriel, Principal Civil Engineer
- 13 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-36
PROJECT TITLE:
Bristol Street Improvements and Widening:
Phase 3B - Washington to 17th
PROJECT CATEGORY:
Street Improvements -
Street/Bridge Improvements & Widening
PROJECT NEED:
Bristol Street from Washington Avenue to 17th Street
(Phase 3B) is part of the City's plan to widen
Bristol Street from Warner Avenue to Memory Lane,
which was approved by City Council in 1990 and
reevaluated in 2015. Existing roadway has only 2 lanes
in each direction and is operating at a LOS F. This
widening is needed to improve traffic flow and create
complete streets features.
PROJECT DESCRIPTION:
The Bristol Street Improvements project was planned
and designed to incorporate complete street concepts
with storm drain quality features. The improvements
include widening of the street from four lanes to six
lanes, with bus turnouts, raised median, protected bike
lanes, and sound walls. The project also brings native
and organic landscaping that beautifies a fully
developed urban area.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
GAS TAX (PY)$600,000
TSIA AREA F (PY)$572,000
TOTAL $1,172,000
PY = Funds awarded in Multiple Prior Fiscal Years
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $572,000
Right-Of-Way $600,000
TOTAL $1,172,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Design Engineering Sean Thomas, Senior Civil Engineer
- 14 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-37
PROJECT TITLE:
Bike Lane Project Development
PROJECT CATEGORY:
Traffic Improvements -
Planning
PROJECT NEED:
This project is designed to increase bicyclists' safety
and mobility.
PROJECT DESCRIPTION:
Provides for the engineering services that are
necessary for grant applications,
development/preparation of plans, specifications, bike
hut maintenance and estimates related to bike lane
projects, In addition, provides City matching funds for
grant funded bicycle facilities projects and allows for
bicycle facilities improvements.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
M2 LOCAL
FAIRSHARE
$80,000 $80,000 $80,000 $80,000 $80,000 $80,000 $80,000
TOTAL $80,000 $80,000 $80,000 $80,000 $80,000 $80,000 $80,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Engineering $80,000 $80,000 $80,000 $80,000 $80,000 $80,000 $80,000
TOTAL $80,000 $80,000 $80,000 $80,000 $80,000 $80,000 $80,000
LOCATION MAP
CITYWIDE
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Traffic Engineering Zdenek Kekula, Senior Civil Engineer
- 15 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-38
PROJECT TITLE:
OC Streetcar
PROJECT CATEGORY:
Traffic Improvements -
Planning
PROJECT NEED:
The project will enhance transit service and support
economic development along the proposed streetcar
corridor.
PROJECT DESCRIPTION:
The cities of Santa Ana and Garden Grove are jointly
developing a modern streetcar system. The streetcar
will travel from the Santa Ana Regional Transportation
Center (SARTC) through downtown Santa Ana, the
Civic Center area, and the Willowick site. The system
will terminate at a new transit hub at the corner of
Harbor Blvd. and Westminster Ave.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
OC STREETCAR
FUND
$1,500,000
TOTAL $1,500,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Engineering $1,500,000
TOTAL $1,500,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Design Engineering Jason Gabriel, Principal Civil Engineer
- 16 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-39
PROJECT TITLE:
Traffic Management Plans
PROJECT CATEGORY:
Traffic Improvements -
Planning
PROJECT NEED:
1) To collect traffic data for traffic signal timing, arterial
traffic studies, preparation of traffic flow maps, and to
conduct new traffic signal and left-turn signal needs
analysis to request state and federal grants. 2) To
reduce the City's liability related to traffic safety issues
by maintaining the storage of and access to traffic
investigation records in the computer database.
PROJECT DESCRIPTION:
Conduct a variety of traffic counts at various locations
Citywide to collect data needed for traffic management
planning, signal priority studies, signal timing, etc.,
preparation of aerial maps, and to maintain the storage
and management of accident and traffic investigation
records.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
M2 LOCAL
FAIRSHARE
$50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000
TOTAL $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Other $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000
TOTAL $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000
LOCATION MAP
CITYWIDE
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Traffic Engineering Zdenek Kekula, Senior Civil Engineer
- 17 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-40
PROJECT TITLE:
Traffic Safety Project Development
PROJECT CATEGORY:
Traffic Improvements -
Planning
PROJECT NEED:
This project is designed to increase traffic safety for all
users in the City.
PROJECT DESCRIPTION:
Provides for the engineering design services that are
necessary for grant applications, environmental
documents, development/preparation of plans,
specification, and estimates related to traffic safety
improvement projects. In addition, provides City
matching funds for grant funded traffic safety projects.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
M2 LOCAL
FAIRSHARE
$50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000
TOTAL $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Engineering $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000
TOTAL $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000
LOCATION MAP
CITYWIDE
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Traffic Engineering Zdenek Kekula, Senior Civil Engineer
- 18 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-41
PROJECT TITLE:
Edinger Avenue Traffic Signal Synchronization
PROJECT CATEGORY:
Traffic Improvements -
Traffic Improvements
PROJECT NEED:
OCTA Traffic Signal Synchronization Master Plan
identified that Edinger Ave Corridor is part of
countywide corridor system that needs multi-jurisdiction
synchronization. This project will provide traffic signal
upgrades and synchronize traffic signals across
jurisdictional boundaries to reduce traffic congestion
and maintain the synchronization improvement for 3
years.
PROJECT DESCRIPTION:
To provide inter-agency traffic signal coordination and
traffic infrastructure upgrades on Edinger Ave from
Bolsa Chica St in City of Huntington Beach to SR-55
Ramps in Santa Ana. The project involves the Cities of
Santa Ana, Huntington Beach, Westminster, Fountain
Valley and Caltrans D12.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
M2 LOCAL
FAIRSHARE
$100,000
TOTAL $100,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $100,000
TOTAL $100,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Traffic Engineering Cesar Rodriguez, Senior Civil Engineer
- 19 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-42
PROJECT TITLE:
Talbert Ave/ MacArthur Blvd Traffic Signal
Synchronization
PROJECT CATEGORY:
Traffic Improvements -
Traffic Improvements
PROJECT NEED:
OCTA Traffic Signal Synchronization Master Plan
identified that Talbert Ave/ MacArthur Blvd Corridor is
part of countywide corridor system that needs multi-
jurisdiction synchronization. This project will provide
traffic signal upgrades and synchronize traffic signals
across jurisdictional boundaries to reduce traffic
congestion and maintain the synchronization
improvement for 3 years.
PROJECT DESCRIPTION:
To provide inter-agency traffic signal coordination and
traffic infrastructure upgrades on Talbert Ave/
MacArthur Blvd from Walmart Shopping Center in City
of Huntington Beach to SR-55 Ramp in Santa Ana. The
project involves the Cities of Santa Ana, Huntington
Beach, Fountain Valley and Caltrans D12.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
M2 LOCAL
FAIRSHARE
$100,000
TOTAL $100,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $100,000
TOTAL $100,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Traffic Engineering Cesar Rodriguez, Senior Civil Engineer
- 20 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-43
PROJECT TITLE:
Traffic Signal Equipment Replacement
PROJECT CATEGORY:
Traffic Improvements -
Traffic Improvements
PROJECT NEED:
Much of the traffic signal, pedestrian and monitoring
equipment in the City is old and no longer supported by
the manufacturers. This equipment needs to be
upgraded to maintain operations and to meet current
standards.
PROJECT DESCRIPTION:
Replace outdated traffic signal and monitoring
equipment, such as cabinets, conflict monitors,
controllers, CCTV, and communication equipment, both
in the field and in the traffic management center.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
M2 LOCAL
FAIRSHARE
$100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $100,000
TOTAL $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $100,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $100,000
TOTAL $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $100,000
LOCATION MAP
CITYWIDE
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Transportation & Traffic Engineering Cesar Rodriguez, Senior Civil Engineer
- 21 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-44
PROJECT TITLE:
Warner Avenue Traffic Signal Synchronization
PROJECT CATEGORY:
Traffic Improvements -
Traffic Improvements
PROJECT NEED:
OCTA Traffic Signal Synchronization Master Plan
identified that Warner Ave Corridor is part of
countywide corridor system that needs multi-jurisdiction
synchronization. This project will provide traffic signal
upgrades and synchronize traffic signals across
jurisdictional boundaries to reduce traffic congestion
and maintain the synchronization improvement for 3
years.
PROJECT DESCRIPTION:
To provide inter-agency traffic signal coordination and
traffic infrastructure upgrades on Warner Ave from
Pacific Coast Highway in City of Huntington Beach to
Pullman St in Santa Ana. The project involves the
Cities of Santa Ana, Huntington Beach, Fountain Valley
and Caltrans D12.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
M2 LOCAL
FAIRSHARE
$100,000
TOTAL $100,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $100,000
TOTAL $100,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Traffic Engineering Cesar Rodriguez, Senior Civil Engineer
- 22 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-45
PROJECT TITLE:
Davis Elementary SRTS
PROJECT CATEGORY:
Traffic Improvements -
Traffic Safety / Mobility
PROJECT NEED:
Project is designed to increase pedestrian safety and
mobility.
PROJECT DESCRIPTION:
Installation of bulb-outs at crossings adjacent to Davis
Elementary, reconstruction and installation of ADA
compliant curb ramps, sections of sidewalk and
driveways along the safe routes to school (SRTS).
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
ATP $4,834,000
TOTAL $4,834,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $4,834,000
TOTAL $4,834,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Design Engineering Kenny Nguyen, Senior Civil Engineer
- 23 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-46
PROJECT TITLE:
Fremont Elementary and Spurgeon Intermediate
SRTS
PROJECT CATEGORY:
Traffic Improvements -
Traffic Safety / Mobility
PROJECT NEED:
Project is designed to increase pedestrian/bicyclist
safety and mobility.
PROJECT DESCRIPTION:
Installation of bulbouts, traffic circles, missing
sidewalks, sidewalk repairs, enhanced marked
crosswalks, bike routes, bike lanes, new traffic signal
for safe routes to school (SRTS) for Fremont
Elementary and Spurgeon Intermediate.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
ATP - SB1
Augmentation
$927,000 $4,849,000
TOTAL $927,000 $4,849,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $4,849,000
Engineering $843,000
Environmental $84,000
TOTAL $927,000 $4,849,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Design Engineering Jason Gabriel, Principal Civil Engineer
- 24 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-47
PROJECT TITLE:
Jackson Elementary Improvements
PROJECT CATEGORY:
Traffic Improvements -
Traffic Safety / Mobility
PROJECT NEED:
This project is designed to increase pedestrian safety
and mobility.
PROJECT DESCRIPTION:
Garden Grove Unified School District and City joint
project for Jackson Elementary School improvements
including sidewalk improvements along McFadden
Avenue.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
M2 LOCAL
FAIRSHARE
$25,000
TOTAL $25,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $25,000
TOTAL $25,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Traffic Engineering Zdenek Kekula, Senior Civil Engineer
- 25 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-48
PROJECT TITLE:
Kennedy Elementary and Villa Fundamental
Intermediate SRTS
PROJECT CATEGORY:
Traffic Improvements -
Traffic Safety / Mobility
PROJECT NEED:
Project is designed to increase pedestrian/bicylist
safety and mobility.
PROJECT DESCRIPTION:
Installation of bulbouts, missing sidewalk, sidewalk
repairs, left turn arrows, enhance marked crosswalks,
bike lanes along the safe routes to school for Kennedy
Elementary and Villa Fundamental Intermediate.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
ATP - SB1
Augmentation
$191,000 $1,291,000
TOTAL $191,000 $1,291,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $1,291,000
Engineering $168,000
Environmental $23,000
TOTAL $191,000 $1,291,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Traffic Engineering Zdenek Kekula, Senior Civil Engineer
- 26 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-49
PROJECT TITLE:
West Willits Street Protected Bicycle Lanes:
Fairview to Raitt
PROJECT CATEGORY:
Traffic Improvements -
Traffic Safety / Mobility
PROJECT NEED:
Project is designed to increase bicyclists' safety and
mobility.
PROJECT DESCRIPTION:
Design and construction of a protected bikeway along
Willits Street including raised medians, bike detection,
and crosswalk enhancements.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
ATP $2,475,000
TOTAL $2,475,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $2,475,000
TOTAL $2,475,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Design Engineering Sean Thomas, Senior Civil Engineer
- 27 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-50
PROJECT TITLE:
Bristol Street Sewer Main Improvements Phase
3A - Civic Center to Washington
PROJECT CATEGORY:
Utility/Drainage/Lighting Improvements -
Sewer Improvements
PROJECT NEED:
The properties fronting the Bristol Street corridor within
the project limits no longer need sewer laterals.
PROJECT DESCRIPTION:
Sewer lateral abandonments along the sewer main in
Bristol in coordination with the Bristol Street Widening
Project.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
SEWER $260,000
TOTAL $260,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $260,000
TOTAL $260,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Water Resources Armando Fernandez, Senior Civil Engineer
- 28 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-51
PROJECT TITLE:
Citywide Sewer Main Improvements
PROJECT CATEGORY:
Utility/Drainage/Lighting Improvements -
Sewer Improvements
PROJECT NEED:
This project is required to maintain effective operation
of the City's sanitary sewer system. These
improvements will eliminate the undersized sewer
mains, reduce sewer maintenance, and prevent
sewer spills.
PROJECT DESCRIPTION:
This project will replace existing deteriorated and over
capacity sewer mains, and related sewer assets, such
as, manholes and laterals.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
SEWER $2,860,000
TOTAL $2,860,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $2,860,000
TOTAL $2,860,000
LOCATION MAP
CITYWIDE
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Water Resources Armando Fernandez, Senior Civil Engineer
- 29 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-52
PROJECT TITLE:
Citywide Sewer Main Improvements Phase 2
PROJECT CATEGORY:
Utility/Drainage/Lighting Improvements -
Sewer Improvements
PROJECT NEED:
This project is required to maintain effective operation
of the City's sanitary sewer system. These
improvements will eliminate the undersized sewer
mains, reduce sewer maintenance, and prevent sewer
spills.
PROJECT DESCRIPTION:
This project will replace existing deteriorated and over
capacity sewer mains, and related sewer assets, such
as manholes and laterals.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
SEWER $1,560,000
TOTAL $1,560,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $1,560,000
TOTAL $1,560,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Water Resources Armando Fernandez, Senior Civil Engineer
- 30 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-53
PROJECT TITLE:
Flower Street Sewer Main Improvements
PROJECT CATEGORY:
Utility/Drainage/Lighting Improvements -
Sewer Improvements
PROJECT NEED:
This project is required to maintain effective operation
of the City's sanitary sewer system, eliminate sewer
capacity related issues, reduce sewer maintenance
requirements and prevent sewer spills.
PROJECT DESCRIPTION:
Sewer capacity improvement include upsizing 1,554
feet of 12 inch pipe to 15 inch pipe, upsizing 783 feet
of 10 inch pipe to 15 inch pipe, and upsizing 634 feet
of 8 inch pipe to 10 inch pipe.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
SEWER
CONNECTION
PROJECTS
$2,100,000
TOTAL $2,100,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $1,950,000
Engineering $150,000
TOTAL $2,100,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Water Resources Armando Fernandez, Senior Civil Engineer
- 31 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-54
PROJECT TITLE:
Warner Garnsey Sewer Main Diversion
Improvements
PROJECT CATEGORY:
Utility/Drainage/Lighting Improvements -
Sewer Improvements
PROJECT NEED:
Sewer diversion at this intersection will move flow to
another conveyance sewer line that can handle the
additional hydraulic capacity of the existing sewer along
Warner Avenue.
PROJECT DESCRIPTION:
Flow Diversion and sewer main upsize
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
SEWER $135,000 $877,500 $877,500
TOTAL $135,000 $877,500 $877,500
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $877,500 $877,500
Engineering $135,000
TOTAL $135,000 $877,500 $877,500
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Design Engineering Armando Fernandez, Senior Civil Engineer
- 32 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-55
PROJECT TITLE:
Washington Square Sewer Main Improvements
PROJECT CATEGORY:
Utility/Drainage/Lighting Improvements -
Sewer Improvements
PROJECT NEED:
This Project is required to maintain effective operation
of the City's sanitary sewer system, eliminate sewer
main obstructions, reduce sewer maintenance
requirements, and prevent sewer spills.
PROJECT DESCRIPTION:
Construction of sanitary sewer pipe lines to replace
obsolete and/or undersized facilities.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
SEWER $975,000
TOTAL $975,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $975,000
TOTAL $975,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Water Resources Armando Fernandez, Senior Civil Engineer
- 33 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-56
PROJECT TITLE:
Willard Neighborhood Sewer Main
Improvements
PROJECT CATEGORY:
Utility/Drainage/Lighting Improvements -
Sewer Improvements
PROJECT NEED:
This project is required to maintain effective operation
of the City's sanitary sewer system, eliminate sewer
main obstructions, reduce sewer maintenance
requirements and prevent sewer spills.
PROJECT DESCRIPTION:
Sewer main improvements involve replacing old,
deteriorating sewer mains, laterals and manholes.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
SEWER $1,560,000
TOTAL $1,560,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $1,560,000
TOTAL $1,560,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Water Resources Armando Fernandez, Senior Civil Engineer
- 34 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-57
PROJECT TITLE:
Wright Street Sewer Main Improvements
PROJECT CATEGORY:
Utility/Drainage/Lighting Improvements -
Sewer Improvements
PROJECT NEED:
This project is required to maintain effective operation
of the City's sanitary sewer system, eliminate sewer
main obstructions, reduce sewer maintenance
requirements, and prevent sewer spills.
PROJECT DESCRIPTION:
Construction of sanitary sewer pipe lines to replace
obsolete and undersized facilities.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
SEWER
CONNECTION
PROJECTS
$163,000 $1,059,500 $1,059,500
TOTAL $163,000 $1,059,500 $1,059,500
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $1,059,500 $1,059,500
Engineering $163,000
TOTAL $163,000 $1,059,500 $1,059,500
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Water Resources Armando Fernandez, Senior Civil Engineer
- 35 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-58
PROJECT TITLE:
Automated Metering Infrastructure - Citywide
PROJECT CATEGORY:
Utility/Drainage/Lighting Improvements -
Water Improvements
PROJECT NEED:
Existing water meters are aging and in need of
replacement. Smart meters allow for greater accuracy
and customer engagement.
PROJECT DESCRIPTION:
Replacement of all manual read water meters with new
smart water meters.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
WTR UTY CAPITAL
PROJECTS
$817,300 $5,566,000 $5,566,000 $5,568,000
TOTAL $817,300 $5,566,000 $5,566,000 $5,568,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $5,566,000 $5,566,000 $5,568,000
Engineering $817,300
TOTAL $817,300 $5,566,000 $5,566,000 $5,568,000
LOCATION MAP
CITYWIDE
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Water Resources Armando Fernandez, Senior Civil Engineer
- 36 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-59
PROJECT TITLE:
Bristol Street Water Main Improvements Phase
3A - Civic Center to Washington
PROJECT CATEGORY:
Utility/Drainage/Lighting Improvements -
Water Improvements
PROJECT NEED:
This project will replace old, aging pipelines, valves and
water services within the Bristol Street Widening Phase
3A area.
PROJECT DESCRIPTION:
Water main replacements in conjunction with Bristol
Street Widening Phase 3A
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
WTR UTY CAPITAL
PROJECTS
$200,000
TOTAL $200,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $200,000
TOTAL $200,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Water Resources Armando Fernandez, Senior Civil Engineer
- 37 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-60
PROJECT TITLE:
Fisher Park Neighborhood Water Improvements
PROJECT CATEGORY:
Utility/Drainage/Lighting Improvements -
Water Improvements
PROJECT NEED:
Replacement of obsolete water mains to ensure
system reliability and protect water quality
PROJECT DESCRIPTION:
Replace aging water distribution pipelines and related
appurtenances including fire hydrants and valves in the
Fisher Park Neighborhood.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
WTR UTY CAPITAL
PROJECTS
$3,640,000
TOTAL $3,640,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $3,380,000
Engineering $260,000
TOTAL $3,640,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Water Resources Armando Fernandez, Senior Civil Engineer
- 38 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-61
PROJECT TITLE:
French Park Neighborhood Water Improvements
PROJECT CATEGORY:
Utility/Drainage/Lighting Improvements -
Water Improvements
PROJECT NEED:
Replacement of obsolete water main to ensure system
reliability and to protect water quality.
PROJECT DESCRIPTION:
Replace aging water distribution pipelines and related
appurtenances including fire hydrants and valves in the
French Park Neighborhood.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
WTR UTY CAPITAL
PROJECTS
$340,000 $4,420,000
TOTAL $340,000 $4,420,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $4,420,000
Engineering $340,000
TOTAL $340,000 $4,420,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Water Resources Armando Fernandez, Senior Civil Engineer
- 39 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-62
PROJECT TITLE:
Lacy Neighborhood Water Improvements
PROJECT CATEGORY:
Utility/Drainage/Lighting Improvements -
Water Improvements
PROJECT NEED:
Replacement of obsolete water mains to ensure system
reliability and to protect water quality.
PROJECT DESCRIPTION:
Replace aging water distribution pipelines and related
appurtenances including fire hydrants and valves in the
Lacy Neighborhood.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
WTR UTY CAPITAL
PROJECTS
$290,000 $3,770,000
TOTAL $290,000 $3,770,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $3,770,000
Engineering $290,000
TOTAL $290,000 $3,770,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Water Resources Armando Fernandez, Senior Civil Engineer
- 40 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-63
PROJECT TITLE:
Saint Gertrude and Grand Avenue Water Main
Replacement
PROJECT CATEGORY:
Utility/Drainage/Lighting Improvements -
Water Improvements
PROJECT NEED:
Replacement of obsolete water mains to ensure system
reliability and to protect water quality.
PROJECT DESCRIPTION:
Replace aging water distribution pipelines and related
appurtenances including fire hydrants and valves.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
WTR UTY CAPITAL
PROJECTS
$950,000
TOTAL $950,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $950,000
TOTAL $950,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Water Resources Armando Fernandez, Senior Civil Engineer
- 41 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-64
PROJECT TITLE:
Thornton Park Water Main Improvements
PROJECT CATEGORY:
Utility/Drainage/Lighting Improvements -
Water Improvements
PROJECT NEED:
Replacement of obsolete water mains to ensure
system reliability and to protect water quality.
PROJECT DESCRIPTION:
Replace aging water distribution pipelines and related
appurtenances including fire hydrants and valves in the
Thornton Park Neighborhood.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
WTR UTY CAPITAL
PROJECTS
(PY)$2,860,000
TOTAL $2,860,000
PY = Funds awarded in Multiple Prior Fiscal Years
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $2,860,000
TOTAL $2,860,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Water Resources Armando Fernandez, Senior Civil Engineer
- 42 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-65
PROJECT TITLE:
Warner Avenue Water Main Improvements -
Bristol to Main
PROJECT CATEGORY:
Utility/Drainage/Lighting Improvements -
Water Improvements
PROJECT NEED:
Replacement of obsolete water mains to ensure system
reliability and to protect water quality.
PROJECT DESCRIPTION:
Replace aging water distribution pipelines and related
appurtenances including fire hydrants and valves.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
WTR UTY CAPITAL
PROJECTS
$150,000 $975,000 $975,000
TOTAL $150,000 $975,000 $975,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $975,000 $975,000
Engineering $150,000
TOTAL $150,000 $975,000 $975,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Water Resources Armando Fernandez, Senior Civil Engineer
- 43 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-66
PROJECT TITLE:
Warner Avenue Water Main Improvements -
Main to Oak
PROJECT CATEGORY:
Utility/Drainage/Lighting Improvements -
Water Improvements
PROJECT NEED:
Replacement of water mains to ensure system
reliability and to protect water quality.
PROJECT DESCRIPTION:
Replace aging water distribution pipelines and related
appurtenances including fire hydrants and valves in the
vicinity of the Warner Avenue Widening.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
WTR UTY CAPITAL
PROJECTS
$100,000 $1,300,000 $1,300,000
TOTAL $100,000 $1,300,000 $1,300,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $1,300,000 $1,300,000
Engineering $100,000
TOTAL $100,000 $1,300,000 $1,300,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Water Resources Armando Fernandez, Senior Civil Engineer
- 44 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-67
PROJECT TITLE:
Cambridge Pump Station Improvements
PROJECT CATEGORY:
Utility/Drainage/Lighting Improvements -
Facility Improvements
PROJECT NEED:
This project is required to maintain effective operation
of the City's water system and to provide reliability to
the City water supply.
PROJECT DESCRIPTION:
This project will replace the existing pump motors and
discharge heads, upgrade electrical control systems
and construct a new building over existing pumps.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
WTR UTY CAPITAL
PROJECTS
$500,000 $1,625,000 $1,625,000
TOTAL $500,000 $1,625,000 $1,625,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $1,625,000 $1,625,000
Engineering $500,000
TOTAL $500,000 $1,625,000 $1,625,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Water Resources Armando Fernandez, Senior Civil Engineer
- 45 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-68
PROJECT TITLE:
Pressure Reducing Vault Power & Controls
Improvements
PROJECT CATEGORY:
Utility/Drainage/Lighting Improvements -
Facility Improvements
PROJECT NEED:
The existing structure and equipment is obsolete and
non-functional.
PROJECT DESCRIPTION:
This project will replace the existing obsolete Pressure
Reducing Vault structure. Improvements include a new
vault structure, new piping, new flow control valves,
power controls and new communications equipment.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
WTR UTY CAPITAL
PROJECTS
$120,000 $520,000 $520,000
TOTAL $120,000 $520,000 $520,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $520,000 $520,000
Engineering $120,000
TOTAL $120,000 $520,000 $520,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Water Resources Armando Fernandez, Senior Civil Engineer
- 46 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-69
PROJECT TITLE:
SA-2 Vault Improvements
PROJECT CATEGORY:
Utility/Drainage/Lighting Improvements -
Facility Improvements
PROJECT NEED:
This vault is aging with deteriorated piping, valving and
instrumentation that needs replacement.
PROJECT DESCRIPTION:
Vault rehabilitation and pipe rehabilitation at MWD
connection. Includes new instrumentation, control
panels and strucural vault improvements
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
WTR UTY CAPITAL
PROJECTS
$225,000 $1,950,000
TOTAL $225,000 $1,950,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $1,950,000
Engineering $225,000
TOTAL $225,000 $1,950,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Water Resources Armando Fernandez, Senior Civil Engineer
- 47 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-70
PROJECT TITLE:
SA-5 Vault Relocation
PROJECT CATEGORY:
Utility/Drainage/Lighting Improvements -
Facility Improvements
PROJECT NEED:
The existing vault is in need of repair and floods,
damaging existing piping, instrumentation and valving.
PROJECT DESCRIPTION:
City water connection with Metropolitan Water District
to be relocated and improved with new piping, vault
and control system.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
WTR UTY CAPITAL
PROJECTS
$1,150,000
TOTAL $1,150,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $1,150,000
TOTAL $1,150,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Design Engineering Armando Fernandez, Senior Civil Engineer
- 48 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-71
PROJECT TITLE:
Segerstrom (San Lorenzo) Sewer Lift Station
Reconstruction
PROJECT CATEGORY:
Utility/Drainage/Lighting Improvements -
Facility Improvements
PROJECT NEED:
The existing wet well is too shallow, resulting in
surcharging of incoming sewer mains. This project is
required to prevent sewer mains from plugging and to
prevent spills.
PROJECT DESCRIPTION:
Reconstruct existing sewer lift station.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
SEWER
CONNECTION
PROJECTS
$3,000,000
TOTAL $3,000,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $3,000,000
TOTAL $3,000,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Water Resources Armando Fernandez, Senior Civil Engineer
- 49 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-72
PROJECT TITLE:
Washington Well Site Improvements
PROJECT CATEGORY:
Utility/Drainage/Lighting Improvements -
Facility Improvements
PROJECT NEED:
A new well will help increase the reliability, performance
and customer experience.
PROJECT DESCRIPTION:
Design of a new well site with a new pump, motor,
instrumentation and site improvements.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
WTR UTY CAPITAL
PROJECTS
$630,000 $2,730,000 $2,730,000
TOTAL $630,000 $2,730,000 $2,730,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $2,730,000 $2,730,000
Engineering $630,000
TOTAL $630,000 $2,730,000 $2,730,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Water Resources Armando Fernandez, Senior Civil Engineer
- 50 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-73
PROJECT TITLE:
Well No. 29 - Improvements
PROJECT CATEGORY:
Utility/Drainage/Lighting Improvements -
Facility Improvements
PROJECT NEED:
This well site was damaged by a vehicular accident
and is currently non-operable. Improvements to the
electrical, disinfection treatment train, and piping
components are necessary to return this asset to
service.
PROJECT DESCRIPTION:
This project will rebuild components of the existing
Well No. 29 damaged by a vehicular accident. The
project will include making well site improvements
such as a secure perimeter wall, well house and
associated electrical and piping components.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
WTR UTY CAPITAL
PROJECTS
$2,000,000 $2,160,000
TOTAL $2,000,000 $2,160,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $2,000,000 $2,160,000
TOTAL $2,000,000 $2,160,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Water Resources Armando Fernandez, Senior Civil Engineer
- 51 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-74
PROJECT TITLE:
Well No. 32 - Rehabilitation
PROJECT CATEGORY:
Utility/Drainage/Lighting Improvements -
Facility Improvements
PROJECT NEED:
This project is required to maintain effective operation
of the City's water system and to provide reliability to
the City water supply.
PROJECT DESCRIPTION:
Rehabilitate the well and bring facility up to current
codes and standards. Improvements include
upgrading the power supply, motor control systems,
Supervisory Control and Data Acquisition (SCADA)
system, and constructing new discharge pipeline.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
WTR UTY CAPITAL
PROJECTS
$2,850,000 $3,000,000
TOTAL $2,850,000 $3,000,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $2,850,000 $3,000,000
TOTAL $2,850,000 $3,000,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Water Resources Armando Fernandez, Senior Civil Engineer
- 52 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-75
PROJECT TITLE:
Street Light Re-wiring and Repairs
PROJECT CATEGORY:
Utility/Drainage/Lighting Improvements -
Street Light Improvements
PROJECT NEED:
Repairs to City street lights due to faulty wiring or theft.
PROJECT DESCRIPTION:
Citywide street light re-wiring and light fixture
modifications.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
GENERAL FUND $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000
TOTAL $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000
TOTAL $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000
LOCATION MAP
CITYWIDE
CONTACT:DATE:
12-Apr-2019
AGENCY
Public Works Agency
DIVISION:
Construction Engineering Tyrone Chesanek, Principal Civil Engineer
- 53 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-76
PROJECT TITLE:
6th and Lacy Park Improvement
PROJECT CATEGORY:
City Facility Improvements -
Park Facility Improvements
PROJECT NEED:
The City's Municipal Code recommends the City
meets a 2 acre per 1,000 population ratio of open
space. Currently the City ratio is 1.1 acres per 1,000
population. This new park site will help increase the
park ratio in the City of Santa Ana. In addition, this new
park site has been submitted to the National Park
Service for the land conversion of the Santa Ana
College site at Centennial Park. Staff is currently doing
public outreach meetings to identify the design of this
new park site.
PROJECT DESCRIPTION:
Preparation of design plans and construction of the
6th and Lacy Park site.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
GENERAL FUND (PY)$185,000
TOTAL $185,000
PY = Funds awarded in Multiple Prior Fiscal Years
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $185,000
TOTAL $185,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Parks, Rec. & Community Services
DIVISION:
Administration Ron Ono, Administrative Services Manager
- 54 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-77
PROJECT TITLE:
Adams Park Irrigation Renovation
PROJECT CATEGORY:
City Facility Improvements -
Park Facility Improvements
PROJECT NEED:
Adams Park is over 50 years old and the irrigation
system has been compromised with mismatched
irrigation heads. Project will include redesign and
modification of the irrigation system to ensure adequate
water coverage on the grass.
PROJECT DESCRIPTION:
Modification and redesign of irrigation system to
accommodate the installation of new irrigation heads.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
CELL TOWER
REVENUE
$100,000
TOTAL $100,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $100,000
TOTAL $100,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Parks, Rec. & Community Services
DIVISION:
Administrative Services Ron Ono, Administrative Services Manager
- 55 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-78
PROJECT TITLE:
Adams Park Parking Lot Slurry Seal
PROJECT CATEGORY:
City Facility Improvements -
Park Facility Improvements
PROJECT NEED:
To extend the life and condition of Adams Park Parking
Lot it is recommended the parking lot get slurry sealed
every 5 years. The parking lot is starting to deteriorate
and it's time to repair and slurry seal the lot to extend
its useful life.
PROJECT DESCRIPTION:
Preparation of design plans to renovate and apply
slurry seal on to Adams Park Parking Lot.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
CELL TOWER
REVENUE
$65,000
TOTAL $65,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $58,876
Engineering $6,124
TOTAL $65,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Parks, Rec. & Community Services
DIVISION:
Administrative Services Ron Ono, Administrative Services Manager
- 56 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-79
PROJECT TITLE:
Adams Park Restroom Renovation
PROJECT CATEGORY:
City Facility Improvements -
Park Facility Improvements
PROJECT NEED:
Adams Park restroom is over 50 years old and needs
complete renovation. Project will include the
replacement of toilet and electrical fixtures, installation
of restroom partition doors, painting of interior and
exterior of restroom building, replacement of restroom
metal doors, signage and hand dryers.
PROJECT DESCRIPTION:
Purchase and install new restroom plumbing and
electrical fixtures, install partition doors, paint/renovate
interior and exterior of building.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
CELL TOWER
REVENUE
$250,000
TOTAL $250,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $226,450
Engineering $23,550
TOTAL $250,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Parks, Rec. & Community Services
DIVISION:
Administrative Services Ron Ono, Administrative Services Manager
- 57 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-80
PROJECT TITLE:
Adams Park Site Furnishings/Signage
PROJECT CATEGORY:
City Facility Improvements -
Park Facility Improvements
PROJECT NEED:
Adams Park site furnishings and signage need to be
replaced to improve the use and image of the park.
Project will replace the park benches, trash
receptacles, drinking fountains with bottle filling stations
and dog fountain and replace/upgrade the park entry
signs and regulation signs.
PROJECT DESCRIPTION:
Purchase and install new park furnishings, such as
benches, trash receptacles, drinking fountain and park
signage.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
CELL TOWER
REVENUE
$100,000
TOTAL $100,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $100,000
TOTAL $100,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Parks, Rec. & Community Services
DIVISION:
Administrative Services Ron Ono, Administrative Services Manager
- 58 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-81
PROJECT TITLE:
Centennial Park Fencing Between Lake & Play
Area
PROJECT CATEGORY:
City Facility Improvements -
Park Facility Improvements
PROJECT NEED:
To protect children playing in the sand/rubber surface
playground from running/falling into the lake.
PROJECT DESCRIPTION:
Installation of a 3-foot fence between Centennial Park
sand playground area and Centennial Lake.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
GENERAL FUND (PY)$120,000
TOTAL $120,000
PY = Funds awarded in Multiple Prior Fiscal Years
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $120,000
TOTAL $120,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Parks, Rec. & Community Services
DIVISION:
Administrative Services Ron Ono, Administrative Services Manager
- 59 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-82
PROJECT TITLE:
Centennial Park Security Lights
PROJECT CATEGORY:
City Facility Improvements -
Park Facility Improvements
PROJECT NEED:
The existing security lighting poles and fixtures at
Centennial Park have deteriorated and need to be
replaced. This is a safety issue and replacement is
needed before the poles and fixtures fall and hurt the
public. The existing wood or metal poles will be
replaced with concrete poles and LED lighting
fixtures. The LED lighting will also help increase the
lighting level in the park with less energy consumption.
This will provide additional funds needed to implement
the project.
PROJECT DESCRIPTION:
Removal and replacement of deteriorated wooden and
metal security lighting poles and replacement with
concrete poles and new LED light fixtures at Centennial
Park.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
CDBG Programs $200,000
TOTAL $200,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $200,000
TOTAL $200,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Parks, Rec. & Community Services
DIVISION:
Administration Ron Ono, Administrative Services Manager
- 60 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-83
PROJECT TITLE:
Centennial Park Walkway Improvements
PROJECT CATEGORY:
City Facility Improvements -
Park Facility Improvements
PROJECT NEED:
Centennial Park is the largest park site in the City of
Santa Ana. Many of the sidewalks have lifted and are
cracked. The park is heavily used by Santa Ana
College, Hector Godinez High School, sports leagues
and many park patrons. The existing concrete is
cracked and raised in many areas creating a hazardous
condition for our park patrons. This will provide
additional funds needed to implement the project.
PROJECT DESCRIPTION:
Removal and replacement of existing cracked and
raised concrete walkways.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
CDBG Programs $625,000
TOTAL $625,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $625,000
TOTAL $625,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Parks, Rec. & Community Services
DIVISION:
Administration Ron Ono, Administrative Services Manager
- 61 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-84
PROJECT TITLE:
Civic Center Courthouse Dry Streambed
PROJECT CATEGORY:
City Facility Improvements -
Park Facility Improvements
PROJECT NEED:
Rain and irrigation water is seeping into the basement
of the Orange County Superior Court building.The
State completed waterproofing the Superior Court
basement wall in FY 18-19. To ensure proper drainage
and minimal water usage around the Courthouse
foundation, staff is proposing a redesign of the dry
stream area into a drought tolerant planting and drip
irrigation system.
PROJECT DESCRIPTION:
Design and installation of drought tolerant planting
and drainage on the south side of the Orange County
Superior Court building.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
CIVIC CTR - CAPITAL
PROJ
$800,000
TOTAL $800,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $724,638
Engineering $75,362
TOTAL $800,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Parks, Rec. & Community Services
DIVISION:
Administrative Services Ron Ono, Administrative Services Manager
- 62 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-85
PROJECT TITLE:
Civic Center Irrigation Controller Replacement -
Phase II
PROJECT CATEGORY:
City Facility Improvements -
Park Facility Improvements
PROJECT NEED:
The Civic Center has approximately 30 irrigation
controllers that manage our sprinkler system. The
controllers are over 40 years old. Technology has
improved and the old controllers need to be replaced.
The project will replace the oldest controllers in phases.
PROJECT DESCRIPTION:
Design and installation of drought tolerant planting and
drainage on the south side of the Orange County
Superior Court building.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
CIVIC CTR - CAPITAL
PROJ
$50,000
TOTAL $50,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $50,000
TOTAL $50,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Parks, Rec. & Community Services
DIVISION:
Administrative Services Ron Ono, Administrative Services Manager
- 63 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-86
PROJECT TITLE:
Civic Center Japanese Garden Renovation
PROJECT CATEGORY:
City Facility Improvements -
Park Facility Improvements
PROJECT NEED:
The Japanese Pagoda and Garden in the Civic
Center was funded by a donation from the local
Japanese Association to the County of Orange. It is
approximately 35 years old. The security lighting and
garden need major repair. This project will fund repairs
to the lighting, pagoda structure, irrigation and
landscaping. Project is currently under design and this
will provide the additional funds needed to implement
the project
PROJECT DESCRIPTION:
Renovation of the Civic Center Japanese Pagoda and
Garden.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
CIVIC CTR - CAPITAL
PROJ
$200,000
TOTAL $200,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $200,000
TOTAL $200,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Parks, Rec. & Community Services
DIVISION:
Administrative Services Ron Ono, Administrative Services Manager
- 64 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-87
PROJECT TITLE:
Civic Center Lift Stations Construction
PROJECT CATEGORY:
City Facility Improvements -
Park Facility Improvements
PROJECT NEED:
There are two Storm Water Lift Stations in the Civic
Center that are over 40 years old. The lift stations have
been repaired throughout the years. Technology has
improved and safety issues need to be addressed on
the two lift stations in order to meet the current needs
of the Civic Center.
PROJECT DESCRIPTION:
Reconstruction of the Storm Water Lift Stations located
at Santa Ana Blvd/Parton and Flower/6th St.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
CIVIC CTR - CAPITAL
PROJ
$1,400,000
TOTAL $1,400,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $1,268,116
Engineering $131,884
TOTAL $1,400,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Parks, Rec. & Community Services
DIVISION:
Administrative Services Ron Ono, Administrative Services Manager
- 65 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-88
PROJECT TITLE:
Civic Center Perimeter Lighting Design
PROJECT CATEGORY:
City Facility Improvements -
Park Facility Improvements
PROJECT NEED:
The Civic Center perimeter globe lighting is
approximately 50 years old. The lighting fixtures are
obsolete and parts are not available. A new street and
pedestrian LED lighting system needs to be designed
and implemented the following year. The LED lighting
is energy efficient with a white light that will improve
visibility and safety in the Civic Center.
PROJECT DESCRIPTION:
Electrical design of the street and pedestrian lighting
along the perimeter of the Civic Center Super block
(Civic Center Drive, Broadway, Santa Ana Blvd to
Flower Street).
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
CIVIC CTR - CAPITAL
PROJ
$186,000
TOTAL $186,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Engineering $186,000
TOTAL $186,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Parks, Rec. & Community Services
DIVISION:
Administrative Services Ron Ono, Administrative Services Manager
- 66 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-89
PROJECT TITLE:
Civic Center Plaza of the Flag/Fountain Re-
caulk Plaza Slab
PROJECT CATEGORY:
City Facility Improvements -
Park Facility Improvements
PROJECT NEED:
The expansion joint material in the Civic Center Plaza's
of the Fountain and Flags was replaced approximately
two years ago. The caulking is deteriorating and needs
to be replaced.
PROJECT DESCRIPTION:
Remove and replace all expansion joint sealant in the
Civic Center Plaza's of the Fountains and Flags.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
CIVIC CTR - CAPITAL
PROJ
$40,000
TOTAL $40,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $40,000
TOTAL $40,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Parks, Rec. & Community Services
DIVISION:
Administrative Services Ron Ono, Administrative Services Manager
- 67 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-90
PROJECT TITLE:
Civic Center Plaza of the Flag/Fountain
Structural Analysis
PROJECT CATEGORY:
City Facility Improvements -
Park Facility Improvements
PROJECT NEED:
Through the years, water has penetrated through the
decorative and structural concrete slab of the Plaza of
the Flags/Fountain. Re-bars in the decorative and
structural slab are showing rust and corrosion. A
structural analysis report is needed to ensure the deck
is safe for public use and to provide information for
future repairs.
PROJECT DESCRIPTION:
Prepare a Structural Analysis Report of the Civic
Center Plaza of the Flags Deck and the Plaza of the
Fountains Deck to analyze the condition of the re-bars
and stability of the deck.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
CIVIC CTR - CAPITAL
PROJ
$90,000
TOTAL $90,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $80,360
Engineering $9,640
TOTAL $90,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Parks, Rec. & Community Services
DIVISION:
Administrative Services Ron Ono, Administrative Services Manager
- 68 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-91
PROJECT TITLE:
El Salvador Park Basketball Court & Court
Lighting Renovation
PROJECT CATEGORY:
City Facility Improvements -
Park Facility Improvements
PROJECT NEED:
The existing asphalt basketball court at El Salvador
Park is deteriorating and cracking in various locations.
The entire court needs to be removed and replaced
with a concrete surface. The court will be color coated
and the basketball goals renovated. The project will
also include removal of the old center flood lighting and
replaced with LED sports lighting.
PROJECT DESCRIPTION:
Reconstruct existing basketball court and install new
basketball LED sports court lighting.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
A & D $50,000
CELL TOWER
REVENUE
$200,000
TOTAL $250,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $226,450
Engineering $23,550
TOTAL $250,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Parks, Rec. & Community Services
DIVISION:
Administrative Services Ron Ono, Administrative Services Manager
- 69 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-92
PROJECT TITLE:
El Salvador Pool Replastering
PROJECT CATEGORY:
City Facility Improvements -
Park Facility Improvements
PROJECT NEED:
El Salvador swimming pool surfacing is approximately
8 years old. Through the years, the smooth pool
surfacing has deteriorated and has become rough. The
rough surfacing is starting to cause foot injury to
swimmers. The surfacing needs to be re-plastered to
prevent injury.
PROJECT DESCRIPTION:
Removal, preparation and re-plastering of swimming
pool surfacing.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
CELL TOWER
REVENUE
$80,000
TOTAL $80,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $80,000
TOTAL $80,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Parks, Rec. & Community Services
DIVISION:
Administrative Services Ron Ono, Administrative Services Manager
- 70 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-93
PROJECT TITLE:
Jerome Ballfield Lighting
PROJECT CATEGORY:
City Facility Improvements -
Park Facility Improvements
PROJECT NEED:
The two west ballfields at Jerome Park do not have
sports lighting. The proposed project will install LED
sports lighting on the two ballfields. The lighting will
also be designed to accommodate soccer activity. The
lighting of the ballfields will help increase field
reservations for both softball and soccer.
PROJECT DESCRIPTION:
Design and installation of new LED sports lighting on
the two west ball-fields.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
CDBG Programs $510,000
TOTAL $510,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $461,957
Engineering $48,043
TOTAL $510,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Parks, Rec. & Community Services
DIVISION:
Administrative Services Ron Ono, Administrative Services Manager
- 71 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-94
PROJECT TITLE:
Jerome French Drain Project
PROJECT CATEGORY:
City Facility Improvements -
Park Facility Improvements
PROJECT NEED:
Jerome Community Center indoor basketball court
flooring is buckling due to moisture in the concrete slab
and wood flooring. The existing basketball court
flooring has been removed. The insurance company is
requiring the installation of a French Drain outside the
gymnasium area to prevent moisture from seeping into
the building. A waterproofing membrane, PVC French
Drain and crushed gravel needs to be installed to
prevent water from traveling close to the building.
PROJECT DESCRIPTION:
Installation of a French drain system south of Jerome
Community Center.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
CELL TOWER
REVENUE
(PY)$100,000
TOTAL $100,000
PY = Funds awarded in Multiple Prior Fiscal Years
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $100,000
TOTAL $100,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Parks, Rec. & Community Services
DIVISION:
Administrative Services Ron Ono, Administrative Services Manager
- 72 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-95
PROJECT TITLE:
Jerome Pool Replastering
PROJECT CATEGORY:
City Facility Improvements -
Park Facility Improvements
PROJECT NEED:
Jerome swimming pool surfacing is approximately 8
years old. Through the years, the smooth pool
surfacing has deteriorated and has become rough. The
rough surfacing is starting to cause foot injury to
swimmers. The surfacing needs to be re-plastered to
prevent injury.
PROJECT DESCRIPTION:
Removal, preparation and re-plastering of swimming
pool surfacing.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
CELL TOWER
REVENUE
$80,000
TOTAL $80,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $80,000
TOTAL $80,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Parks, Rec. & Community Services
DIVISION:
Administrative Services Ron Ono, Administrative Services Manager
- 73 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-96
PROJECT TITLE:
Memorial Swimming Pool Replastering
PROJECT CATEGORY:
City Facility Improvements -
Park Facility Improvements
PROJECT NEED:
Memorial swimming pool surfacing is approximately 10
years old. The smooth pool surfacing has deteriorated
through the years and has become rough. The rough
surfacing is starting to cause foot injury to swimmers.
The surfacing needs to be re-plastered to prevent
injury.
PROJECT DESCRIPTION:
Removal, preparation and re-plastering of swimming
pool surfacing.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
A & D (PY)$50,357
TOTAL $50,357
PY = Funds awarded in Multiple Prior Fiscal Years
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $50,357
TOTAL $50,357
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Parks, Rec. & Community Services
DIVISION:
Administrative Services Ron Ono, Administrative Services Manager
- 74 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-97
PROJECT TITLE:
Riverview Park Ballfield Sports Lighting
Renovation
PROJECT CATEGORY:
City Facility Improvements -
Park Facility Improvements
PROJECT NEED:
The two west ballfields at Jerome Park does not have
sports lighting. The proposed project will install LED
sports lighting on the two ballfields. The lighting will
also be designed to accommodate soccer activity. The
lighting of the ballfields will help increase field
reservations for both softball and soccer.
PROJECT DESCRIPTION:
Design and installation of new LED sports lighting the
on two north ballfields.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
A & D $80,000
CELL TOWER
REVENUE
$220,000
TOTAL $300,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $271,740
Engineering $28,260
TOTAL $300,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Parks, Rec. & Community Services
DIVISION:
Administrative Services Ron Ono, Administrative Services Manager
- 75 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-98
PROJECT TITLE:
Salgado Swimming Pool Replastering
PROJECT CATEGORY:
City Facility Improvements -
Park Facility Improvements
PROJECT NEED:
Salgado swimming pool surfacing is approximately 10
years old. The smooth pool surfacing has deteriorated
through the years and has become rough. The rough
surfacing is starting to cause foot injury to swimmers.
The surfacing needs to be re-plastered to prevent
injury.
PROJECT DESCRIPTION:
Removal, preparation and re-plastering of swimming
pool surfacing.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
A & D (PY)$78,846
TOTAL $78,846
PY = Funds awarded in Multiple Prior Fiscal Years
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $78,846
TOTAL $78,846
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Parks, Rec. & Community Services
DIVISION:
Administrative Services Ron Ono, Administrative Services Manager
- 76 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-99
PROJECT TITLE:
Santa Anita Park Synthetic Turf
PROJECT CATEGORY:
City Facility Improvements -
Park Facility Improvements
PROJECT NEED:
PRCSA regulates the amount of play on Santa Anita
grass sports field in order to maintain the turf and
prevent it from becoming a dirt field. With the lack of
sports fields in the City, the installation of synthetic turf
will help increase the amount of play on the field. The
sports field already has sports lighting and is
completely fenced. The field is used for youth soccer.
The perimeter of the field will be planted with drought
tolerant landscaping to help reduce water usage.
PROJECT DESCRIPTION:
Removal of existing grass in the multi-purpose sports
field and installation of synthetic sports turf, subsurface
drainage, and drought tolerant landscaping.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
CDBG Programs (PY)$172,443
TOTAL $172,443
PY = Funds awarded in Multiple Prior Fiscal Years
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $172,443
TOTAL $172,443
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Parks, Rec. & Community Services
DIVISION:
Administrative Services Ron Ono, Administrative Services Manager
- 77 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-100
PROJECT TITLE:
Stadium Locker Room Renovation
PROJECT CATEGORY:
City Facility Improvements -
Park Facility Improvements
PROJECT NEED:
The stadium locker room is dark, dingy and needs to be
completely upgraded. The proposed project will
increase the lighting level with LED lights, replace worn
out plumbing fixtures, refurbish the lockers and paint
the entire interior of the room.
PROJECT DESCRIPTION:
Renovation of the stadium looker room lighting,
plumbing, furnishing and painting.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
CELL TOWER
REVENUE
$60,000
TOTAL $60,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $60,000
TOTAL $60,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Parks, Rec. & Community Services
DIVISION:
Administrative Services Ron Ono, Administrative Services Manager
- 78 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-101
PROJECT TITLE:
Stadium Press Box Re-Roofing
PROJECT CATEGORY:
City Facility Improvements -
Park Facility Improvements
PROJECT NEED:
The stadium press box roofing is approximately 10 to
12 years old and showing signs of age. The old roofing
will be removed and replaced with new material. The
roofing will also be protected with a material to reduce
wear from broadcasting crews.
PROJECT DESCRIPTION:
Remove and replace the roofing on the stadium press
box.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
CELL TOWER
REVENUE
$15,000
TOTAL $15,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $15,000
TOTAL $15,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Parks, Rec. & Community Services
DIVISION:
Administrative Services Ron Ono, Administrative Services Manager
- 79 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-102
PROJECT TITLE:
Thornton Park Parking Lot Renovation
PROJECT CATEGORY:
City Facility Improvements -
Park Facility Improvements
PROJECT NEED:
The existing parking lot that serves the park and
sports fields is in major need of renovation. The
asphalt material is unraveling and striping is close to
non existent. This project will resurface and re-stripe
the existing parking lot.
PROJECT DESCRIPTION:
Resurface and re-stripe the south parking lot at
Thornton Park.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
CDBG Programs $100,000
TOTAL $100,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $100,000
TOTAL $100,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Parks, Rec. & Community Services
DIVISION:
Administration Ron Ono, Administrative Services Manager
- 80 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-103
PROJECT TITLE:
Windsor Park Site Furnishings
PROJECT CATEGORY:
City Facility Improvements -
Park Facility Improvements
PROJECT NEED:
Windsor Park site furnishing and signage need to be
replaced to improve the use and image of the park.
Project will replace the park benches, trash
receptacles, drinking fountains with bottle filling stations
and dog fountain and replace/upgrade the park
regulation signs.
PROJECT DESCRIPTION:
Purchase and install new park furnishing, such as
benches, trash receptacles, drinking fountain and park
signage.
SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
CELL TOWER
REVENUE
$30,000
TOTAL $30,000
PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26
Construction $30,000
TOTAL $30,000
LOCATION MAP
CONTACT:DATE:
12-Apr-2019
AGENCY
Parks, Rec. & Community Services
DIVISION:
Administrative Services Ron Ono, Administrative Services Manager
- 81 -
CITY OF SANTA ANA FY 19/20 CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
1-104
PROJECTS CDBG CAPITAL
OUTLAY
WATER
CAPITAL
SEWER AREA
FEES
A & D
FUNDS
GAS TAX MEASURE
M2
OTHER TOTAL
I.STREET IMPROVEMENTS
FY 19/20 PLANNING
1. Pavement Management 50,000 200,000 250,000
2. Project Development 50,000 100,000 150,000
3. Right-of-Way Management 50,000 100,000 150,000
Subtotal FY 19/20 Planning 150,000 400,000 550,000
FY 19/20 CURB, GUTTER, SIDEWALK IMPROVEMENTS
4. First Street Pedestrian Improvements 4,032,000 (1)4,032,000
5. Omnibus Concrete 50,000 50,000
Subtotal FY 19/20 Curb, Gutter, Sidewalk
Improvements
50,000 4,032,000 4,082,000
FY 19/20 NEIGHBORHOOD STREET RESURFACING
6. Residential Street Repair Program 921,227 921,227
Subtotal FY 19/20 Neighborhood Street Resurfacing 921,227 921,227
FY 19/20 LOCAL STREET RESURFACING
7. Local Street Preventative Maintenance 2,000,000 2,000,000
Subtotal FY 19/20 Local Street Resurfacing 2,000,000 2,000,000
FY 19/20 ARTERIAL STREET REHABILITATION
8. Euclid Street Rehabilitation 1st to Hazard 1,200,000 (2)1,200,000
9. Euclid Street Rehabilitation: City Limit to McFadden 970,000 (2)970,000
10. Euclid Street Rehabilitation: McFadden to 1st 1,100,000 (2)1,100,000
11. MacArthur Boulevard Rehabilitation: Santa Ana River to
Harbor
80,000 (2)80,000
12. MacArthur Boulevard Resurfacing: Flower to Main 1,100,000 (2)1,100,000
13. Main Street Rehabilitation: Warner to Edinger 1,148,541 (2)1,148,541
= Funding approved in Multiple Prior Fiscal Years - 1 -PY
CITY OF SANTA ANA
SEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM
FY 2019/2020 - FY 2025/2026
2019-04-12
1-105
PROJECTS CDBG CAPITAL
OUTLAY
WATER
CAPITAL
SEWER AREA
FEES
A & D
FUNDS
GAS TAX MEASURE
M2
OTHER TOTAL
I.STREET IMPROVEMENTS
Subtotal FY 19/20 Arterial Street Rehabilitation 5,598,541 5,598,541
FY 19/20 STREET/BRIDGE IMPROVEMENTS & WIDENING
14. Bristol Street Improvements and Widening: Phase 3B -
Washington to 17th
(PY)572,000 600,000 1,172,000
Subtotal FY 19/20 Street/Bridge Improvements &
Widening
572,000 600,000 1,172,000
FY 20/21 PLANNING
1. Pavement Management 50,000 200,000 250,000
2. Project Development 50,000 100,000 150,000
3. Right-of-Way Management 50,000 100,000 150,000
Subtotal FY 20/21 Planning 150,000 400,000 550,000
FY 20/21 CURB, GUTTER, SIDEWALK IMPROVEMENTS
5. Omnibus Concrete 50,000 50,000
Subtotal FY 20/21 Curb, Gutter, Sidewalk
Improvements
50,000 50,000
FY 20/21 NEIGHBORHOOD STREET RESURFACING
6. Residential Street Repair Program 1,000,000 1,000,000
Subtotal FY 20/21 Neighborhood Street Resurfacing 1,000,000 1,000,000
FY 20/21 LOCAL STREET RESURFACING
7. Local Street Preventative Maintenance 2,000,000 2,000,000
Subtotal FY 20/21 Local Street Resurfacing 2,000,000 2,000,000
FY 21/22 PLANNING
1. Pavement Management 50,000 200,000 250,000
2. Project Development 50,000 100,000 150,000
= Funding approved in Multiple Prior Fiscal Years - 2 -PY
CITY OF SANTA ANA
SEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM
FY 2019/2020 - FY 2025/2026
2019-04-12
1-106
PROJECTS CDBG CAPITAL
OUTLAY
WATER
CAPITAL
SEWER AREA
FEES
A & D
FUNDS
GAS TAX MEASURE
M2
OTHER TOTAL
I.STREET IMPROVEMENTS
FY 21/22 PLANNING
3. Right-of-Way Management 50,000 100,000 150,000
Subtotal FY 21/22 Planning 150,000 400,000 550,000
FY 21/22 CURB, GUTTER, SIDEWALK IMPROVEMENTS
5. Omnibus Concrete 50,000 50,000
Subtotal FY 21/22 Curb, Gutter, Sidewalk
Improvements
50,000 50,000
FY 21/22 NEIGHBORHOOD STREET RESURFACING
6. Residential Street Repair Program 1,000,000 1,000,000
Subtotal FY 21/22 Neighborhood Street Resurfacing 1,000,000 1,000,000
FY 21/22 LOCAL STREET RESURFACING
7. Local Street Preventative Maintenance 2,000,000 2,000,000
Subtotal FY 21/22 Local Street Resurfacing 2,000,000 2,000,000
FY 22/23 PLANNING
1. Pavement Management 50,000 200,000 250,000
2. Project Development 50,000 100,000 150,000
3. Right-of-Way Management 50,000 100,000 150,000
Subtotal FY 22/23 Planning 150,000 400,000 550,000
FY 22/23 CURB, GUTTER, SIDEWALK IMPROVEMENTS
5. Omnibus Concrete 50,000 50,000
Subtotal FY 22/23 Curb, Gutter, Sidewalk
Improvements
50,000 50,000
= Funding approved in Multiple Prior Fiscal Years - 3 -PY
CITY OF SANTA ANA
SEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM
FY 2019/2020 - FY 2025/2026
2019-04-12
1-107
PROJECTS CDBG CAPITAL
OUTLAY
WATER
CAPITAL
SEWER AREA
FEES
A & D
FUNDS
GAS TAX MEASURE
M2
OTHER TOTAL
I.STREET IMPROVEMENTS
FY 22/23 NEIGHBORHOOD STREET RESURFACING
6. Residential Street Repair Program 1,000,000 1,000,000
Subtotal FY 22/23 Neighborhood Street Resurfacing 1,000,000 1,000,000
FY 22/23 LOCAL STREET RESURFACING
7. Local Street Preventative Maintenance 2,000,000 2,000,000
Subtotal FY 22/23 Local Street Resurfacing 2,000,000 2,000,000
FY 23/24 PLANNING
1. Pavement Management 50,000 200,000 250,000
2. Project Development 50,000 100,000 150,000
3. Right-of-Way Management 50,000 100,000 150,000
Subtotal FY 23/24 Planning 150,000 400,000 550,000
FY 23/24 CURB, GUTTER, SIDEWALK IMPROVEMENTS
5. Omnibus Concrete 50,000 50,000
Subtotal FY 23/24 Curb, Gutter, Sidewalk
Improvements
50,000 50,000
FY 23/24 NEIGHBORHOOD STREET RESURFACING
6. Residential Street Repair Program 1,000,000 1,000,000
Subtotal FY 23/24 Neighborhood Street Resurfacing 1,000,000 1,000,000
FY 23/24 LOCAL STREET RESURFACING
7. Local Street Preventative Maintenance 2,000,000 2,000,000
Subtotal FY 23/24 Local Street Resurfacing 2,000,000 2,000,000
= Funding approved in Multiple Prior Fiscal Years - 4 -PY
CITY OF SANTA ANA
SEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM
FY 2019/2020 - FY 2025/2026
2019-04-12
1-108
PROJECTS CDBG CAPITAL
OUTLAY
WATER
CAPITAL
SEWER AREA
FEES
A & D
FUNDS
GAS TAX MEASURE
M2
OTHER TOTAL
I.STREET IMPROVEMENTS
FY 24/25 PLANNING
1. Pavement Management 50,000 200,000 250,000
2. Project Development 50,000 100,000 150,000
3. Right-of-Way Management 50,000 100,000 150,000
Subtotal FY 24/25 Planning 150,000 400,000 550,000
FY 24/25 CURB, GUTTER, SIDEWALK IMPROVEMENTS
5. Omnibus Concrete 50,000 50,000
Subtotal FY 24/25 Curb, Gutter, Sidewalk
Improvements
50,000 50,000
FY 24/25 NEIGHBORHOOD STREET RESURFACING
6. Residential Street Repair Program 1,000,000 1,000,000
Subtotal FY 24/25 Neighborhood Street Resurfacing 1,000,000 1,000,000
FY 24/25 LOCAL STREET RESURFACING
7. Local Street Preventative Maintenance 2,000,000 2,000,000
Subtotal FY 24/25 Local Street Resurfacing 2,000,000 2,000,000
FY 25/26 PLANNING
1. Pavement Management 50,000 200,000 250,000
2. Project Development 50,000 100,000 150,000
3. Right-of-Way Management 50,000 100,000 150,000
Subtotal FY 25/26 Planning 150,000 400,000 550,000
FY 25/26 CURB, GUTTER, SIDEWALK IMPROVEMENTS
5. Omnibus Concrete 50,000 50,000
Subtotal FY 25/26 Curb, Gutter, Sidewalk
Improvements
50,000 50,000
= Funding approved in Multiple Prior Fiscal Years - 5 -PY
CITY OF SANTA ANA
SEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM
FY 2019/2020 - FY 2025/2026
2019-04-12
1-109
PROJECTS CDBG CAPITAL
OUTLAY
WATER
CAPITAL
SEWER AREA
FEES
A & D
FUNDS
GAS TAX MEASURE
M2
OTHER TOTAL
I.STREET IMPROVEMENTS
FY 25/26 NEIGHBORHOOD STREET RESURFACING
6. Residential Street Repair Program 1,000,000 1,000,000
Subtotal FY 25/26 Neighborhood Street Resurfacing 1,000,000 1,000,000
FY 25/26 LOCAL STREET RESURFACING
7. Local Street Preventative Maintenance 2,000,000 2,000,000
Subtotal FY 25/26 Local Street Resurfacing 2,000,000 2,000,000
TOTAL STREET IMPROVEMENTS 6,921,227 572,000 2,000,000 16,800,000 9,630,541 35,923,768
II.TRAFFIC IMPROVEMENTS
FY 19/20 PLANNING
15. Bike Lane Project Development 80,000 80,000
16. OC Streetcar 1,500,000 (3)1,500,000
17. Traffic Management Plans 50,000 50,000
18. Traffic Safety Project Development 50,000 50,000
Subtotal FY 19/20 Planning 180,000 1,500,000 1,680,000
FY 19/20 TRAFFIC IMPROVEMENTS
19. Edinger Avenue Traffic Signal Synchronization 100,000 100,000
20. Talbert Ave/ MacArthur Blvd Traffic Signal
Synchronization
100,000 100,000
21. Traffic Signal Equipment Replacement 100,000 100,000
22. Warner Avenue Traffic Signal Synchronization 100,000 100,000
Subtotal FY 19/20 Traffic Improvements 400,000 400,000
= Funding approved in Multiple Prior Fiscal Years - 6 -PY
CITY OF SANTA ANA
SEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM
FY 2019/2020 - FY 2025/2026
2019-04-12
1-110
PROJECTS CDBG CAPITAL
OUTLAY
WATER
CAPITAL
SEWER AREA
FEES
A & D
FUNDS
GAS TAX MEASURE
M2
OTHER TOTAL
II.TRAFFIC IMPROVEMENTS
FY 19/20 TRAFFIC SAFETY / MOBILITY
23. Davis Elementary SRTS 4,834,000 (1)4,834,000
24. Fremont Elementary and Spurgeon Intermediate SRTS 927,000 (4)927,000
25. Jackson Elementary Improvements 25,000 25,000
26. Kennedy Elementary and Villa Fundamental Intermediate
SRTS
191,000 (4)191,000
27. West Willits Street Protected Bicycle Lanes: Fairview to
Raitt
2,475,000 (1)2,475,000
Subtotal FY 19/20 Traffic Safety / Mobility 25,000 8,427,000 8,452,000
FY 20/21 PLANNING
15. Bike Lane Project Development 80,000 80,000
17. Traffic Management Plans 50,000 50,000
18. Traffic Safety Project Development 50,000 50,000
Subtotal FY 20/21 Planning 180,000 180,000
FY 20/21 TRAFFIC IMPROVEMENTS
21. Traffic Signal Equipment Replacement 100,000 100,000
Subtotal FY 20/21 Traffic Improvements 100,000 100,000
FY 20/21 TRAFFIC SAFETY / MOBILITY
24. Fremont Elementary and Spurgeon Intermediate SRTS 4,849,000 (4)4,849,000
26. Kennedy Elementary and Villa Fundamental Intermediate
SRTS
1,291,000 (4)1,291,000
Subtotal FY 20/21 Traffic Safety / Mobility 6,140,000 6,140,000
FY 21/22 PLANNING
15. Bike Lane Project Development 80,000 80,000
= Funding approved in Multiple Prior Fiscal Years - 7 -PY
CITY OF SANTA ANA
SEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM
FY 2019/2020 - FY 2025/2026
2019-04-12
1-111
PROJECTS CDBG CAPITAL
OUTLAY
WATER
CAPITAL
SEWER AREA
FEES
A & D
FUNDS
GAS TAX MEASURE
M2
OTHER TOTAL
II.TRAFFIC IMPROVEMENTS
FY 21/22 PLANNING
17. Traffic Management Plans 50,000 50,000
18. Traffic Safety Project Development 50,000 50,000
Subtotal FY 21/22 Planning 180,000 180,000
FY 21/22 TRAFFIC IMPROVEMENTS
21. Traffic Signal Equipment Replacement 100,000 100,000
Subtotal FY 21/22 Traffic Improvements 100,000 100,000
FY 22/23 PLANNING
15. Bike Lane Project Development 80,000 80,000
17. Traffic Management Plans 50,000 50,000
18. Traffic Safety Project Development 50,000 50,000
Subtotal FY 22/23 Planning 180,000 180,000
FY 22/23 TRAFFIC IMPROVEMENTS
21. Traffic Signal Equipment Replacement 100,000 100,000
Subtotal FY 22/23 Traffic Improvements 100,000 100,000
FY 23/24 PLANNING
15. Bike Lane Project Development 80,000 80,000
17. Traffic Management Plans 50,000 50,000
18. Traffic Safety Project Development 50,000 50,000
Subtotal FY 23/24 Planning 180,000 180,000
= Funding approved in Multiple Prior Fiscal Years - 8 -PY
CITY OF SANTA ANA
SEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM
FY 2019/2020 - FY 2025/2026
2019-04-12
1-112
PROJECTS CDBG CAPITAL
OUTLAY
WATER
CAPITAL
SEWER AREA
FEES
A & D
FUNDS
GAS TAX MEASURE
M2
OTHER TOTAL
II.TRAFFIC IMPROVEMENTS
FY 23/24 TRAFFIC IMPROVEMENTS
21. Traffic Signal Equipment Replacement 100,000 100,000
Subtotal FY 23/24 Traffic Improvements 100,000 100,000
FY 24/25 PLANNING
15. Bike Lane Project Development 80,000 80,000
17. Traffic Management Plans 50,000 50,000
18. Traffic Safety Project Development 50,000 50,000
Subtotal FY 24/25 Planning 180,000 180,000
FY 24/25 TRAFFIC IMPROVEMENTS
21. Traffic Signal Equipment Replacement 100,000 100,000
Subtotal FY 24/25 Traffic Improvements 100,000 100,000
FY 25/26 PLANNING
15. Bike Lane Project Development 80,000 80,000
17. Traffic Management Plans 50,000 50,000
18. Traffic Safety Project Development 50,000 50,000
Subtotal FY 25/26 Planning 180,000 180,000
FY 25/26 TRAFFIC IMPROVEMENTS
21. Traffic Signal Equipment Replacement 100,000 100,000
Subtotal FY 25/26 Traffic Improvements 100,000 100,000
TOTAL TRAFFIC IMPROVEMENTS 2,285,000 16,067,000 18,352,000
= Funding approved in Multiple Prior Fiscal Years - 9 -PY
CITY OF SANTA ANA
SEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM
FY 2019/2020 - FY 2025/2026
2019-04-12
1-113
PROJECTS CDBG CAPITAL
OUTLAY
WATER
CAPITAL
SEWER AREA
FEES
A & D
FUNDS
GAS TAX MEASURE
M2
OTHER TOTAL
III.UTILITY/DRAINAGE/LIGHTING IMPROVEMENTS
FY 19/20 SEWER IMPROVEMENTS
28. Bristol Street Sewer Main Improvements Phase 3A - Civic
Center to Washington
260,000 260,000
29. Citywide Sewer Main Improvements 2,860,000 2,860,000
30. Citywide Sewer Main Improvements Phase 2 1,560,000 1,560,000
31. Flower Street Sewer Main Improvements 2,100,000 2,100,000
32. Warner Garnsey Sewer Main Diversion Improvements 135,000 135,000
33. Washington Square Sewer Main Improvements 975,000 975,000
34. Willard Neighborhood Sewer Main Improvements 1,560,000 1,560,000
35. Wright Street Sewer Main Improvements 163,000 163,000
Subtotal FY 19/20 Sewer Improvements 9,613,000 9,613,000
FY 19/20 WATER IMPROVEMENTS
36. Automated Metering Infrastructure - Citywide 817,300 817,300
37. Bristol Street Water Main Improvements Phase 3A - Civic
Center to Washington
200,000 200,000
38. Fisher Park Neighborhood Water Improvements 3,640,000 3,640,000
39. French Park Neighborhood Water Improvements 340,000 340,000
40. Lacy Neighborhood Water Improvements 290,000 290,000
41. Saint Gertrude and Grand Avenue Water Main
Replacement
950,000 950,000
42. Thornton Park Water Main Improvements (PY)2,860,000 2,860,000
43. Warner Avenue Water Main Improvements - Bristol to
Main
150,000 150,000
44. Warner Avenue Water Main Improvements - Main to Oak 100,000 100,000
Subtotal FY 19/20 Water Improvements 9,347,300 9,347,300
= Funding approved in Multiple Prior Fiscal Years - 10 -PY
CITY OF SANTA ANA
SEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM
FY 2019/2020 - FY 2025/2026
2019-04-12
1-114
PROJECTS CDBG CAPITAL
OUTLAY
WATER
CAPITAL
SEWER AREA
FEES
A & D
FUNDS
GAS TAX MEASURE
M2
OTHER TOTAL
III.UTILITY/DRAINAGE/LIGHTING IMPROVEMENTS
FY 19/20 FACILITY IMPROVEMENTS
45. Cambridge Pump Station Improvements 500,000 500,000
46. Pressure Reducing Vault Power & Controls Improvements 120,000 120,000
47. SA-2 Vault Improvements 225,000 225,000
48. SA-5 Vault Relocation 1,150,000 1,150,000
49. Segerstrom (San Lorenzo) Sewer Lift Station
Reconstruction
3,000,000 3,000,000
50. Washington Well Site Improvements 630,000 630,000
51. Well No. 29 - Improvements 2,000,000 2,000,000
52. Well No. 32 - Rehabilitation 2,850,000 2,850,000
Subtotal FY 19/20 Facility Improvements 7,475,000 3,000,000 10,475,000
FY 19/20 STREET LIGHT IMPROVEMENTS
53. Street Light Re-wiring and Repairs 200,000 (5)200,000
Subtotal FY 19/20 Street Light Improvements 200,000 200,000
FY 20/21 SEWER IMPROVEMENTS
32. Warner Garnsey Sewer Main Diversion Improvements 877,500 877,500
35. Wright Street Sewer Main Improvements 1,059,500 1,059,500
Subtotal FY 20/21 Sewer Improvements 1,937,000 1,937,000
FY 20/21 WATER IMPROVEMENTS
36. Automated Metering Infrastructure - Citywide 5,566,000 5,566,000
39. French Park Neighborhood Water Improvements 4,420,000 4,420,000
40. Lacy Neighborhood Water Improvements 3,770,000 3,770,000
43. Warner Avenue Water Main Improvements - Bristol to
Main
975,000 975,000
= Funding approved in Multiple Prior Fiscal Years - 11 -PY
CITY OF SANTA ANA
SEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM
FY 2019/2020 - FY 2025/2026
2019-04-12
1-115
PROJECTS CDBG CAPITAL
OUTLAY
WATER
CAPITAL
SEWER AREA
FEES
A & D
FUNDS
GAS TAX MEASURE
M2
OTHER TOTAL
III.UTILITY/DRAINAGE/LIGHTING IMPROVEMENTS
FY 20/21 WATER IMPROVEMENTS
44. Warner Avenue Water Main Improvements - Main to Oak 1,300,000 1,300,000
Subtotal FY 20/21 Water Improvements 16,031,000 16,031,000
FY 20/21 FACILITY IMPROVEMENTS
45. Cambridge Pump Station Improvements 1,625,000 1,625,000
46. Pressure Reducing Vault Power & Controls Improvements 520,000 520,000
47. SA-2 Vault Improvements 1,950,000 1,950,000
50. Washington Well Site Improvements 2,730,000 2,730,000
51. Well No. 29 - Improvements 2,160,000 2,160,000
52. Well No. 32 - Rehabilitation 3,000,000 3,000,000
Subtotal FY 20/21 Facility Improvements 11,985,000 11,985,000
FY 20/21 STREET LIGHT IMPROVEMENTS
53. Street Light Re-wiring and Repairs 200,000 (5)200,000
Subtotal FY 20/21 Street Light Improvements 200,000 200,000
FY 21/22 SEWER IMPROVEMENTS
32. Warner Garnsey Sewer Main Diversion Improvements 877,500 877,500
35. Wright Street Sewer Main Improvements 1,059,500 1,059,500
Subtotal FY 21/22 Sewer Improvements 1,937,000 1,937,000
FY 21/22 WATER IMPROVEMENTS
36. Automated Metering Infrastructure - Citywide 5,566,000 5,566,000
43. Warner Avenue Water Main Improvements - Bristol to
Main
975,000 975,000
= Funding approved in Multiple Prior Fiscal Years - 12 -PY
CITY OF SANTA ANA
SEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM
FY 2019/2020 - FY 2025/2026
2019-04-12
1-116
PROJECTS CDBG CAPITAL
OUTLAY
WATER
CAPITAL
SEWER AREA
FEES
A & D
FUNDS
GAS TAX MEASURE
M2
OTHER TOTAL
III.UTILITY/DRAINAGE/LIGHTING IMPROVEMENTS
FY 21/22 WATER IMPROVEMENTS
44. Warner Avenue Water Main Improvements - Main to Oak 1,300,000 1,300,000
Subtotal FY 21/22 Water Improvements 7,841,000 7,841,000
FY 21/22 FACILITY IMPROVEMENTS
45. Cambridge Pump Station Improvements 1,625,000 1,625,000
46. Pressure Reducing Vault Power & Controls Improvements 520,000 520,000
50. Washington Well Site Improvements 2,730,000 2,730,000
Subtotal FY 21/22 Facility Improvements 4,875,000 4,875,000
FY 21/22 STREET LIGHT IMPROVEMENTS
53. Street Light Re-wiring and Repairs 200,000 (5)200,000
Subtotal FY 21/22 Street Light Improvements 200,000 200,000
FY 22/23 WATER IMPROVEMENTS
36. Automated Metering Infrastructure - Citywide 5,568,000 5,568,000
Subtotal FY 22/23 Water Improvements 5,568,000 5,568,000
FY 22/23 STREET LIGHT IMPROVEMENTS
53. Street Light Re-wiring and Repairs 200,000 (5)200,000
Subtotal FY 22/23 Street Light Improvements 200,000 200,000
FY 23/24 STREET LIGHT IMPROVEMENTS
53. Street Light Re-wiring and Repairs 200,000 (5)200,000
Subtotal FY 23/24 Street Light Improvements 200,000 200,000
= Funding approved in Multiple Prior Fiscal Years - 13 -PY
CITY OF SANTA ANA
SEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM
FY 2019/2020 - FY 2025/2026
2019-04-12
1-117
PROJECTS CDBG CAPITAL
OUTLAY
WATER
CAPITAL
SEWER AREA
FEES
A & D
FUNDS
GAS TAX MEASURE
M2
OTHER TOTAL
III.UTILITY/DRAINAGE/LIGHTING IMPROVEMENTS
FY 24/25 STREET LIGHT IMPROVEMENTS
53. Street Light Re-wiring and Repairs 200,000 (5)200,000
Subtotal FY 24/25 Street Light Improvements 200,000 200,000
FY 25/26 STREET LIGHT IMPROVEMENTS
53. Street Light Re-wiring and Repairs 200,000 (5)200,000
Subtotal FY 25/26 Street Light Improvements 200,000 200,000
TOTAL UTILITY/DRAINAGE/LIGHTING
IMPROVEMENTS
63,122,300 16,487,000 1,400,000 81,009,300
IV.CITY FACILITY IMPROVEMENTS
FY 19/20 PARK FACILITY IMPROVEMENTS
54. 6th and Lacy Park Improvement (PY)185,000 (5)185,000
55. Adams Park Irrigation Renovation 100,000 (6)100,000
56. Adams Park Parking Lot Slurry Seal 65,000 (6)65,000
57. Adams Park Restroom Renovation 250,000 (6)250,000
58. Adams Park Site Furnishings/Signage 100,000 (6)100,000
59. Centennial Park Fencing Between Lake & Play Area (PY)120,000 (5)120,000
60. Centennial Park Security Lights 200,000 200,000
61. Centennial Park Walkway Improvements 625,000 625,000
62. Civic Center Courthouse Dry Streambed 800,000 (7)800,000
63. Civic Center Irrigation Controller Replacement - Phase II 50,000 (7)50,000
64. Civic Center Japanese Garden Renovation 200,000 (7)200,000
= Funding approved in Multiple Prior Fiscal Years - 14 -PY
CITY OF SANTA ANA
SEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM
FY 2019/2020 - FY 2025/2026
2019-04-12
1-118
PROJECTS CDBG CAPITAL
OUTLAY
WATER
CAPITAL
SEWER AREA
FEES
A & D
FUNDS
GAS TAX MEASURE
M2
OTHER TOTAL
IV.CITY FACILITY IMPROVEMENTS
FY 19/20 PARK FACILITY IMPROVEMENTS
65. Civic Center Lift Stations Construction 1,400,000 (7)1,400,000
66. Civic Center Perimeter Lighting Design 186,000 (7)186,000
67. Civic Center Plaza of the Flag/Fountain Re-caulk Plaza
Slab
40,000 (7)40,000
68. Civic Center Plaza of the Flag/Fountain Structural
Analysis
90,000 (7)90,000
69. El Salvador Park Basketball Court & Court Lighting
Renovation
50,000 200,000 (6)250,000
70. El Salvador Pool Replastering 80,000 (6)80,000
71. Jerome Ballfield Lighting 510,000 510,000
72. Jerome French Drain Project (PY)100,000 (6)100,000
73. Jerome Pool Replastering 80,000 (6)80,000
74. Memorial Swimming Pool Replastering (PY)50,357 50,357
75. Riverview Park Ballfield Sports Lighting Renovation 80,000 220,000 (6)300,000
76. Salgado Swimming Pool Replastering (PY)78,846 78,846
77. Santa Anita Park Synthetic Turf (PY)172,443 172,443
78. Stadium Locker Room Renovation 60,000 (6)60,000
79. Stadium Press Box Re-Roofing 15,000 (6)15,000
80. Thornton Park Parking Lot Renovation 100,000 100,000
81. Windsor Park Site Furnishings 30,000 (6)30,000
Subtotal FY 19/20 Park Facility Improvements 1,607,443 259,203 4,371,000 6,237,646
= Funding approved in Multiple Prior Fiscal Years - 15 -PY
CITY OF SANTA ANA
SEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM
FY 2019/2020 - FY 2025/2026
2019-04-12
1-119
PROJECTS CDBG CAPITAL
OUTLAY
WATER
CAPITAL
SEWER AREA
FEES
A & D
FUNDS
GAS TAX MEASURE
M2
OTHER TOTAL
IV.TOTAL CITY FACILITY IMPROVEMENTS 1,607,443 259,203 4,371,000 6,237,646
GRAND TOTAL SEVEN-YEAR CIP
PROJECTS
8,528,670 0 63,122,300 16,487,000 572,000 259,203 2,000,000 19,085,000 31,468,541 141,522,714
= Funding approved in Multiple Prior Fiscal Years - 16 -PY
CITY OF SANTA ANA
SEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM
FY 2019/2020 - FY 2025/2026
2019-04-12
1-120
CITY OF SANTA ANA ONE-YEAR CAPITAL IMPROVEMENT PROGRAM FY 2019/2020 - FY 2025/2026 "OTHER" FUNDING SOURCES (1) ACTIVE TRANSPORTATION PROGRAM(2) ROAD MAINTENANCE AND REHABILITATION ACCOUNT(3) OCTA OC STREETCAR FUNDS (4) ACTIVE TRANSPORTATION PROGRAM SB1 AUGMENTATION(5) GENERAL FUND (6) CELL TOWER REVENUE (7) CIVIC CTR - CAPITAL PROJECT 2019-04-121-121
CDBG CAPITAL
OUTLAY
WATER
CAPITAL
SEWER AREA
FEES
A & D
FUNDS
GAS TAX MEASURE
M2
OTHER TOTAL
FY 19/20 TOTAL:2,528,670 16,822,300 12,613,000 572,000 259,203 800,000 3,005,000 24,128,541 60,728,714
FY 20/21 TOTAL:1,000,000 28,016,000 1,937,000 200,000 2,680,000 6,340,000 40,173,000
FY 21/22 TOTAL:1,000,000 12,716,000 1,937,000 200,000 2,680,000 200,000 18,733,000
FY 22/23 TOTAL:1,000,000 5,568,000 200,000 2,680,000 200,000 9,648,000
FY 23/24 TOTAL:1,000,000 200,000 2,680,000 200,000 4,080,000
FY 24/25 TOTAL:1,000,000 200,000 2,680,000 200,000 4,080,000
FY 25/26 TOTAL:1,000,000 200,000 2,680,000 200,000 4,080,000
GRAND TOTAL SEVEN-YEAR CIP:8,528,670 0 63,122,300 16,487,000 572,000 259,203 2,000,000 19,085,000 31,468,541 141,522,714