o �wA'�r((�� CITY OF SANTA ANA
jL{f.p,) I J �titl Public Works Agency— Design Engineering
20 Civic Center Plaza, M-36 . P.O. Box 1988
Santa Ana, California 92702
www.santa-ana.oro
April 1, 2019
ACTING CITY MANAGER
Steven Mendoza
CITY ATTORNEY
Sonia R. Caivalho
ACTING CLERK OF THE COUNCIL
Norma Mitre -Ramirez
AGREEMENT FOR PRELIMINARY ENGINEERING SERVICES
AND SUBMITTAL OF EXHIBIT "A" FOR RAILROAD APPROVAL
Crossing: Public: At -Grade
State: CA City: Santa Ana
MP: 519.10 Subdivision: Santa Ana Ind. Ld.
Warner Avenue DOT # 761248L
Orange County
Peggy Ygbuhay
Manager, Industry 8 Public Projects
Union Pacific Railroad Company
10031 Foothills Blvd.
Roseville, CA 95747
Dear Ms. Ygbuhay:
Plans are being prepared to modify the existing at -grade crossing at the location referenced
above. The proposed work includes replacing existing entrance quad gates and flashers with
new quad gates with flashing light assembly (Standard 9) at their proposed locations due to
widening and realignment of Warner Ave. Exit quad gates with flasher assembly (Standard 9) is
added in the southeast quadrant and a flashing signal assembly (Standard 8) in the northwest
quadrant. Other improvements consist of new sidewalk and installing new crossing panels,
active cantilever warning signals (in southwest and northeast quadrants) and updates to
signage and striping in the crossing area. In connection with the project, the City of Santa Ana
(Agency) considers it necessary for the successful advancement of the project for your
company to collaborate in the development of the project by performing the following:
• preliminary engineering and other related services
• development of cost estimates
• review of the project's preliminary layouts
• submit current train and switching moves
SANTA ANA CITY COUNCIL
Miguel A. Pulido Juan vilegas Vicente Sarm ergo ! DaM Pensi Jose 3elodo ! Vacant I Cecilia Iglesias
Mayor Mayor No Tem. Ward 5 Wardt Ward i Word i Ward 1 Wei
MPUIdo/AsaMe one me JVllegasssano-ana or I VSarmiento4Dsante-ana oro DPenaion0sanlamaora i JSolaio(a�sanlaane.ao i Clalesias(Weii aana.ora
The Agency authorizes and agrees to reimburse the Railroad for its expenses and actual costs
that are incurred for collaborating in the development of the project's preliminary engineering
and other preliminary activities. The Railroad has estimated that these preliminary engineering
and other preliminary costs will be $25,000. Payment will be made within forty-five (45) days
from the Agency's receipt and approval of the Railroad's request for reimbursement. Railroad
will refer to Agency's Project Number (18-6901 Warner Ph2 Oak to Grand) and forward Invoices
to Public Works Agency — Design Engineering at the address stated on the letterhead.
Additionally, attached for your company's review and approval is one (1) set of half -scale prints
of the concept plans marked Exhibit A, which are the 5% complete plans and show the basic
features of the proposed highway project at the location referenced above. Please review and
provide comment on the basic features of the Exhibit A as soon as possible. Also enclosed is
one (1) set of photos of the project area.
The project may require the Railroad to incur costs for force account activities. Please prepare
the railroad force account cost estimate for work activities to be provided by your company, as
identified in Exhibit A and submit them at your earliest convenience so that they may be
attached to the railroad generated Construction & Maintenance (C&M) agreement.
Please verify the number of current regular train (4) and switching movements (4) with a
Maximum Speed of (40 MPH) at this location as currently shown in our inventory records. This
information will be used by the Agency's Contractor to obtain Railroad Protective Liability
Insurance.
This agreement is intended to address Preliminary Engineering. It is understood by both parties
that railroad may withhold its approval for any reason directly or Indirectly related to safety or its
operations, property issues or effect to its facilities. If the Project is approved, Union Pacific will
continue to work with the Agency to develop Final Plans, Specifications and prepare Material
and Cost Estimates for Railroad Construction Work associated with the project. It is also
understood that if the project is constructed, if at all, at no cost to the railroad.
The Agency and the Railroad will enter into separate License, Right of Entry, Construction and
Maintenance Agreements associated with the actual construction of the project if the project is
accepted and approved by the railroad. The Agreements will be drafted by Union Pacific and
forwarded to the Agency after the Exhibit A and cost estimates have been approved.
Please contact David Ramirez at telephone number (714)-647-5641 via email at
dramireza@santa-ana.org should you have any questions. Your assistance in this matter is
appreciated.
Sincerely,
Steven Mendoza
Acting City Manager
City of Santa Ana
cm
,ei.a areas L, m
Ci m
g
OOOOOO
;'mJU
v
1
u I
' I I
I r
mi
ry F
Ia � I
iI
li
x
'0 •il •61 .Bi L6 •01
•0i � •M
U
I
I
I a�
9
sraeei e9dn
I
/
I
I m n
!
i�
m
lT
ad 6 ,iI ,01 •0I 6 .01
.0i H
14
B
I -„-
I
Il
d
I
I
I Il7
Il
UNION PACIFXI: IL` OAD COMPANY
Name an
Peggy J. Youhay
Manager I Industry & Public Projects
ATTESTEngineeringDepartment
DAISY GOMEZ
CLERK OF THE COUNCIL
APPROVED AS TO FORM
J n M. Funk
Assistant City Attorney
ENDED FOR APPROVAL
ExeDirector
Public Mrks Agency
Attachment: Exhibit A — Warner Ave At -Grade Crossing