HomeMy WebLinkAbout75B - AGMT - LEASE RSCCDREQUEST FOR
COUNCIL ACTION
CITY COUNCIL MEETING DATE:
OCTOBER 15, 2019
TITLE:
APPROVE A GROUND LEASE
AGREEMENT IN SUBSTANTIAL FORM
WITH RANCHO SANTIAGO COMMUNITY
COLLEGE DISTRICT FOR A PORTION OF
CENTENNIAL PARK KNOWN AS THE
SANTA ANA COLLEGE -SCHOOL OF
CONTINUING EDUCATION
{STRATEGIC PLAN NO. 5, 4A}
CLERK OF COUNCIL USE ONLY:
❑
As Recommended
❑
As Amended
❑
Ordinance on 1" Reading
❑
Ordinance on 2nd Reading
❑
Implementing Resolution
❑
Set Public Hearing For
CONTINUED TO
/s/ Kristine Ridge FILE NUMBER
CITY MANAGER
RECOMMENDED ACTION
Authorize the City Manager to execute a ground lease agreement in substantial form between
the City of Santa Ana and Rancho Santiago Community College District for continued use of a
portion of Centennial Park for the Santa Ana College -School of Continuing Education for a period
of 85 years from October 16, 2019 to October 15, 2104, subject to non -substantive changes
approved by the City Manager and City Attorney.
DISCUSSION
On November 5, 1979, the City Council approved a 30-year License Agreement with Rancho
Santiago Community College District (College) to construct and operate an Adult Career
Education Center (Center) at Centennial Park. The original 30-year agreement was set to expire
on November 5, 2009 and the parties, under the same conditions, agreed upon a 5-year
extension of the license in 2009 and again in 2014. On March 5, 2019, the City Council approved
a two-year license agreement extension with the College expiring November 5, 2021.
The College provides the residents of Santa Ana a unique educational resource offering adult
high-school diplomas, citizenship classes, English as a second language and a multitude of
technical career training programs. Approximately 80% of students are also residents of our
City. The campus is made up of portables that have exceeded their useful lives. During the past
several years, the College has requested a long-term license agreement in order to make
substantial improvements to the campus. However, the National Park Service (NPS) would not
approve a long-term license agreement because they found that the operation of the Center did
not comply with the deed restrictions for the land upon which the College is located in Centennial
Park. The deed restrictions provide that the property must be used for a public park and public
recreational area despite the operation of the College for several decades. To allow for the long
75B-1
Approval of Ground Lease Agreement with Rancho Santiago Community College District
October 15, 2019
Page 2
term continuation of the College and to facilitate substantial investment by the College, the City
began the process required by NPS to secure a long-term lease. That process required the
replacement of equivalent park land.
During the license agreement extensions, the College and City entered into two separate
reimbursement agreements in which the College would reimburse the City up to $634,000 for the
needed land conversion to meet the NPS's requirements. The replacement of the equivalent
parkland was the final step to complete the documentation for submittal to NPS, if approved, the
deed conditions for the land upon which the Center is located would be transferred to the new
replacement parks sites.
The conversion involves the construction and operation of replacement parklands in lieu of 2.6-
acre, the size of the site leased to Rancho Santiago Community College District in Centennial
Park. The replacement parklands include three park sites, the 6th Street Site, Raitt Street Site,
and McFadden Site/Pacific Electric Park. The City constructed Pacific Electric Park on the
McFadden Site, and the Pacific Electric Park opened in January 2018. Therefore, the remaining
work involves construction and operation of two replacement parks on the 6th Street Site and the
Raitt Street Site in the City of Santa Ana.
Concurrent with this process the College is taking steps to undertake a bond issue of which a
portion of the proceeds, approximately $50 million would be invested in the education center at
Centennial Park. Due to the short timeframe to place the bond issue out for consideration to the
voters, the College is seeking the finalization of a long term lease.
The terms of the lease would be similar to the terms of the current and previous license
agreements, with the following distinct differences:
The 85-year lease term would be conditioned upon the NPS approval of the lease or of a
land conversion related to the deed restrictions.
The lease term would also be contingent on substantial capital investment commenced
within a specified time period.
The new campus will provide for a community benefit in the form of a community meeting
room, a branch library and classrooms.
A one-time capital contribution of no less than one million ($1,000,000).
The share of operation and maintenance costs of common area will increase from 7.4% to
25%.
75B-2
Approval of Ground Lease Agreement with Rancho Santiago Community College District
October 15, 2019
Page 3
STRATEGIC PLAN ALIGNMENT
Approval of this item allows the City to meet Goal #6 Community Facilities & Infrastructure,
Objective #1 (Establish and maintain a Community Investment Plan for all City assets), Strategy
B (Equitably maintain existing streets and associated assets in a state of good repair so they are
clean, safe and aesthetically pleasing for all users).
FISCAL IMPACT
Funds received from the College will be deposited into the Parks, Recreation and Community
Services Agency -Rancho Santiago Reimbursement revenue account (no. 01113002-57304).
Lisa Rudloff
Executive Director
Parks, Recreation and Community Services
Agency
APPROVED AS TO FUNDS AND ACCOUNT:
Kathryn Downs, CPA
Executive Director
Finance and Management Services Agency
Exhibit: 1. Ground Lease with Rancho Santiago Community College District
2. Diagram of Education Center
75B-3
EXHIBIT 1
GROUND LEASE WITH RANCHO SANTIAGO COMMUNITY COLLEGE DISTRICT FOR A PORTION
OF CENTENNIAL PARK KNOWN AS THE SANTA ANA COLLEGE -SCHOOL OF CONTINUING
EDUCATION
Preamble and Recitals
This lease is entered into on October 15, 2019 by and between, Rancho Santiago
Community College District ("District") and the City of Santa Ana, a municipal corporation of the
State of California ("City"). Collectively referred to as "the Parties."
A. City if the owner of real property in the City of Santa Ana, County of Orange,
State of California, commonly known as the Santa Ana College -School of
Continuing Education located at City's Centennial Park ("Park") at 2900 West
Edinger Avenue, in Santa Ana, California described on Exhibit "A," which is
attached and made part of this lease (referred to in this lease as "the Premises").
B. District desires to lease the Premises for the purpose of operating an educational
center.
C. District previously operated its education center at the property pursuant to a
license agreement between the parties. Said license agreement began on
November 5, 1979 and included District erecting buildings on the Premises
owned by the City. Said license agreement will expire upon the Commencement
Date of this lease.
D. The Parties agree that this lease is conditioned upon District making
improvements, including significant improvements, for the public benefit, to the
Premises during the term of this lease.
E. The Parties agree that this lease is conditioned upon the National Park Service's
approval of the lease or approval of a land conversion related to deed
restrictions on the property.
ARTICLE 1: LEASE OF PREMISES AND TERM OF LEASE
Agreement to Lease
Section 1.01. For and in consideration of the fees to be paid and covenants to be
performed by District under the lease, City agrees to lease the Premises to District, and District
agrees to lease the Premises from City, on the terms and conditions set forth in this lease.
Except as expressly otherwise provided in this lease, "the Premises" includes the real property
plus any appurtenances and easements described in Exhibit "A" of this lease, including any and
all improvements now or subsequently located on the Premises, notwithstanding that any
Improvements may or shall be construed as affixed to and as constituting part of the described
Premises, and without regard to whether ownership of the Improvements is in City or District.
#iznazVz
75B-4
EXHIBIT 1
Term of Lease
Section 1.02. The term of this lease shall be for a period of eighty-five (85) years
commencing on October 16, 2019 ("Commencement Date"), and terminating on October 15,
2104, unless terminated earlier as provided in this lease.
ARTICLE 2: FEES
Operation and Maintenance Fees
Section 2.01. During the term of this lease, District agrees to pay to City, on a quarterly
basis, twenty-five percent (25%) of the operation and maintenance expenses incurred by City in
caring for the access roads, parking areas and other infrastructure improvements in the Park
required to be maintained by the City which are used in common both by park visitors and by
college employees, faculty and students. Costs payable by the District under this Section 2.01
shall be payable in equal installments on January 1, April 1, July 1, and October 1, the first
payment due under this lease would be January 1, 2020, subject to the City's issuance of the
Estimated Statement required by Section 2.02 below. All such costs, and any fees required
under this lease shall be paid to City at 20 Civic Center Plaza, P.O. Box 1988, Santa Ana,
California, 92701, Attention: Executive Director or Parks, Recreation and Community Services
Agency, or any other place or places that City may designate by written notice to District.
Estimated Statements of Annual Costs
Section 2.02. On an agreed upon date annually during the term of this lease, the City
shall deliver to the District the City's good -faith estimate of the costs that will be payable by the
District for the upcoming year pursuant to Section 2.01 above ("Estimated Statement").
Annual Reconciliation of Costa
Section 2.03. After year end of each year during the term of this lease, the City shall
deliver to the District a statement of the actual costs owing by the District under Section 2.01
above for the preceding year ("Reconciliation Statement"). If the Reconciliation Statement
reveals that the District's share of those costs is more than the total additional rent paid by the
District for the prior year's Section 2.01 costs, the District agrees to pay the City the difference
in a lump sum within forty-five (45) days of receipt of the Reconciliation Statement. If the
Reconciliation Statement reveals that the District's actual share of those costs is less than the
total additional rent paid by tenant for such prior year's costs, the City will credit any
overpayment toward the next monthly installment(s) of rent.
#iznazVz
75B-5
EXHIBIT 1
District's Audit Rights
Section 2.04. If the District questions any Reconciliation Statement, it shall have the
right, at any time within three (3) years after delivery thereof to the District, to request in
writing copies of backup documentation reasonably sufficient to support the disputed item(s) in
the Reconciliation Statement, which the City shall provide within a reasonable time (not to
exceed thirty [30] days) after the City receives the District's written request. The District's right
to request backup documentation shall not entitle the District to withhold, delay or offset
against any payment of costs or any other charge owing under the lease pending resolution of
the dispute. If the City and the District are unable to resolve the dispute within thirty (30) days
after the District receives the requested supporting documentation, or if the City fails to timely
deliver such documentation, then the District shall have the right, after reasonable notice and
at reasonable times, to inspect and photocopy the City's accounting records at a location in the
City of Santa Ana, California, mutually acceptable to the District and the City. If, after such
inspection and photocopying, the District continues to dispute the amount of the costs
attributable to the District pursuant to the Reconciliation Statement, then the District shall be
entitled to retain a certified public accountant to audit and/or review the City's records to
determine the proper amount of the District's proportionate share of the costs at issue. If such
audit or review reveals that the City has overcharged the District, then the City shall either
immediately credit the overpayment against the next installment(s) of rent due, or else refund
the overpayment to the District within forty-five (45) days after the receipt of the results of the
audit.
No Partnership or Joint Venture
Section 2.05. Nothing in this lease shall be construed to render City in anyway or for
any purpose a partner, joint venture, or any associate in any relationship with District other
than that of City and District, not shall this lease be construed to authorize either to act as
agent for the other.
ARTICLE 3: USE OF THE PREMISES
Permitted Use
Section 3.01. District shall use the Premises solely for the purpose of operating and
maintaining (subject to District's agreement to make certain improvements set forth in this
Lease) District's School of Continuing Education located on the Premises. The City and District
each acknowledges and understands that certain obligations under this lease are contingent
upon the approval of the National Parks Service of said lease or in the alternate the approval of
a land conversion by the National Parks Service. If neither is obtained, the City and District will
terminate the lease on a schedule acceptable to both parties and in accordance with direction
#iznazVz
75B-6
EXHIBIT 1
from the National Parks Service. District shall not change the use of the Premises without first
obtaining the written consent of the City. District shall use its best efforts to use and permit
Use of the Premises for purposes permitted by this Section 3.01.
Compliance with Laws
Section 3.02. District shall, at District's own cost and expense, comply with all statutes,
ordinances, regulations and requirements of all governmental entities, both federal and state
and county or municipal, including those requiring capital improvements to the Premises or
Improvements, relating to any use and occupancy of the Premises (and specifically not limited
to any particular use or occupancy by District), whether those statutes, ordinance, regulations,
and requirements are now in force or are subsequently enacted. If any license, permit or other
governmental authorization is required for lawful use or occupancy of the Premises or any
portion of the Premises, District shall procure and maintain it throughout the term of this lease.
To the extent that the City itself is the entity issuing such licenses, permits or other
authorizations, the City agrees to work in good faith with the District to issue those permits as
promptly as possible pursuant to the City's usual and customary practices and procedures for
issuance of such licenses, permits, or authorizations, compliance with the Municipal Code, City
Charter and applicable laws. The judgment of any court of competent jurisdiction, or the
admission by District in a proceeding brought against District by any government entity, that
District has violated any such statute, ordinance, regulation or requirement shall be conclusive
as between City and District and shall constitute grounds for termination of this lease by City.
Prohibited Use
Section 3.03. District shall not use or permit the Premises or any portion of the
Premises to be improved, developed, used or occupied in any manner or for any purpose that is
in any way in violation of the deed restrictions on the Premises (unless or until they are
removed), any valid law, ordinance, or regulation of any federal, state, county or local
governmental agency, body, or entity. District shall not make improvements unless said
improvements are set forth herein this lease or agreed upon in writing by the parties prior to
District beginning improvements. Furthermore, District shall not maintain, commit, or permit
the maintenance or commission of any nuisance as now or hereafter defined by any statutory
or decisional law applicable to the Premises or any part of the Premises.
ARTICLE 4: TAXES AND UTILITIES
District to Pay Taxes
Section 4.01. To the extent that there are any, District shall pay during the term of this
lease, without abatement, deduction, or offset, any and all real and personal property taxes,
general and special assessments, and other charges (including any increase caused by a change
in the tax rate or by a change in assessed valuation) of any description levied or assessed during
#iznazVz
75B-7
EXHIBIT 1
the term of this lease by any governmental agency or entity on or against the Premises, the
Improvements located on the Premises, personal property located on or in the Premises or
Improvements, and the leasehold estate created by this lease.
Tax Hold Harmless Clause
Section 4.02. District shall indemnify and hold City and City's property, including the
Premises, and any improvements now or subsequently located on the Premises, free and
harmless from any liability, loss or damage resulting from any taxes, assessments, or other
charges required by this Article to be paid by District and from all interest, penalties, and other
sums imposed thereon and from any sales or other proceedings to enforce collection of any
such taxes, assessments or other charges.
Utilities
Section 4.03. District shall pay or cause to be paid, and hold City and City's property
including the Premises free and harmless from, all charges for the furnishing of gas, water,
electricity, telephone service, and other public utilities to the Premises during the lease's term
and for the removal of a garbage and rubbish from the Premises during the term of this lease.
All such utilities shall be separately metered to the Premises.
Payment by City
Section 4.04. Should District fail to pay within the time specified in this Article any
taxes, assessments, or other charges required by this Article to be paid by the District, City may,
without notice to or demand on District, pay, discharge, or adjust that tax, assessment, or other
charge for the benefit of District. In that event, District shall promptly on written demand of
City reimburse City for the full amount paid by City in paying, discharging, or adjusting that tax,
assessment or other charge together with interest thereon at the then -maximum legal rate
from the date of payment by City until the date of repayment by District. If this Article does not
specify the time within which District must pay any charge required by this Article, District shall
pay that charge before it becomes delinquent.
ARTICLE 5: IMPROVEMENTS BY DISTRICT
Previous Improvements
Section 5.01. The parties agree that pursuant to the previous license agreement
between the parties, certain buildings and structures were built on the Premises. The terms of
the previous license agreement between the parties provided that District had a duty to
remove the structures or buildings from the property at the termination or expiration of the
license and that, if District did not, the title of those buildings and structures would pass to the
#iznazVz
75B-8
EXHIBIT 1
City. The parties agree that these improvements, for purposes of this lease, will be called
"Previous Improvements," and that title for those Previous Improvements will remain with the
District during the term of this lease but will automatically transfer to City upon expiration or
termination of this lease. District agrees to execute, acknowledge, deliver to City any
instrument requested by City as necessary in City's opinion to perfect City's right, title, and
interest to the Previous Improvements and the Premises.
Duty to Make Significant Improvements
Section 5.02. District shall, at District's sole cost and expense, make Significant
Improvements such as replacement of buildings on the Premises for the benefit of the users of
the college campus located thereon, in the manner and according to the terms and conditions
of this Article. The parties will mutually determine the nature of the Significant Improvement
within four and one half (4'/:) years of the commencement date of this lease (April 15, 2024).
District agrees to include improvements on the Premises, of which shall be for the joint
use of the District and the City. These improvements include a branch library; a community
room; and classrooms for recreational, physical fitness and other community service classes,
such as yoga, dance, and similar subjects.
The parties agree that it is their belief and intention that the Improvements will increase
the appeal and use of the park by the public. The parties agree that these Improvements do
not change the ownership of the Park and that the Improvements do not create a property
interest of any kind for District in the Park. Where applicable, District will comply with the
following terms:
a) If the Significant Improvements meets the threshold of the City's Community
Workforce Agreement in effect as of the date of this lease ("CWA"), District will
comply with the terms of the CWA; and
b) If required by law, District will pay prevailing wages as part of the construction
contracts for the Significant Improvements.
c) All Improvements, including Significant Improvements, will comply with City
building standards, parking requirements, the Santa Ana Municipal Code, and
Santa Ana City Charter; and
d) District will comply with the California Environmental Quality Act ("CECIA") for
any Significant Improvements.
Duty to Make Capital Improvement Contribution
Section 5.03. In addition, the District shall make a one-time capital contribution in an
amount no less than one million dollars ($1,000,000) for improvement of adjacent areas to the
campus, which may include sidewalks, landscaping, surface parking lots, or similar items.
#iznazVz
75B-9
EXHIBIT 1
Requirement of City's Written Approval
Section 5.04. No structure or improvement of any kind shall be constructed on the
Premises unless and until the plans, specifications, and proposed location of that structure or
improvement has been approved in writing by City. Furthermore, no structure or other
improvement shall be constructed on the Premises that does not comply with plans,
specifications and locations approved in writing by City.
Preparation and Submission of Plans
Section 5.05. District shall, at District's own cost and expense, engage a licensed
architect or engineer to prepare plans and specifications for the Significant Improvements:
a) District shall submit the following to City for approval by the date which is the
later of (i) five (5) years after the commencement of this lease or (ii) three (3)
years after approval by the National Parks Services of the land conversion
identified in Section 3.01 above:
1. Two copies of drawings and materials in the form of plans, elevations,
sections and rendered perspectives sufficient to convey the architectural
design of the significant improvements to City.
2. Two copies of the estimated construction costs for the significant
improvements prepared by the engaged architect or engineer.
b) Within 30 days after approval by City of the items specified in subsection a) of
this Section and the obtaining by District of any discretionary approvals required
for the Significant Improvements, District shall provide two copies of the
following to City:
1. Detailed working drawings, plans and specifications for the significant
improvements; and
2. A revised statement of estimated construction costs for the significant
improvements prepared by the engaged architect or engineer.
City's Approval or Rejection of Plans
Section 5.06. Within 30 days after receipt by City of any documents submitted to City
for approval under Section 5.05 of this lease, City shall either approve those documents or City
shall give written notice to District of any objections City may have to those documents.
Notwithstanding the foregoing, the City acknowledges that both the design and the manner of
construction of classrooms and other community college facilities is governed by The Field Act
(as codified in the California Education Code) and is subject to approval by the California
Department of General Services' Division of the State Architect ("DSA"); the City agrees that it
shall not disapprove any design element or construction specifications which are required by
the Field Act or the DSA. City's failure to given written notice to District within 30 days of
#iznazVz
75B-10
EXHIBIT 1
submittal of documents to City shall constitute approval of the documents by City (on design
but not for purposes of any required submissions for discretionary approvals, permits,
entitlements, and similar approvals legally required from City as a public entity approving or
denying said Significant Improvements. Within 30 days after service on District of the written
notice of City's objections, District may deliver corrective amendments to the documents to
City and City shall, within 30 days after receiving the corrective amendments, serve written
notice on District of City's approval or rejection of the documents as so amended. Failure of
City to serve written notice on District within that 30 day period after receipt of the corrective
amendments shall constitute approval by City of the documents as so amended.
Changes in Plans
Section 5.07. After approval by City of the documents pertaining to the Significant
Improvements described in Section 5.02 of this lease, any substantial change in the plans or
specifications for the Significant Improvements shall be approved by the City. For purposes of
this Section, "substantial change" means one that materially changes the exterior appearance
of the significant improvements or one that results in a decrease in construction costs of 25%or
more. City's failure to given written notice to District of any objections City may have to any
proposed changes within 30 days after a written statement if the proposed changes has been
given to City by District shall constitute City's approval of the changers. Minor changes in work
or materials not constituting a substantial change need not be approved by City but a copy of
the altered plans and specifications reflecting those changes shall be given to City.
All Work on Written Contract
Section 5.08. All work required in the construction of the Significant Improvements,
including any site preparation work, landscaping work, and utility installation work, as well as
actual construction work on the significant improvement, shall be performed only by
competent contactors licensed under the laws of the State of California and shall be performed
in accordance with written contracts with those contractors. Each such contract shall provide
that the final payment under the contract due to the contractor shall be in an amount equaling
at least five percent (5%) of the full amount payable under the contract and shall be paid to
contractor (subject to the District's right to withhold disputed amounts) not later than sixty
(60) days after the date of completion.
Performance and Lien Bonds
Section 5.09. Each contractor engaged by District to perform any services for
construction of the Significant Improvement including any construction, site preparation, utility
installation, landscaping, or parking lot construction services, shall furnish to District, who shall
deliver copies of both of the following to City, at the contractor's own expense at the time of
entering a contract with District for those services:
#iznazVz
75B-11
EXHIBIT 1
a) A bond issued by a corporate surety authorized to issue surety insurance in
California in an amount agreed upon by the parties ) securing the faithful
performance by the contractor of its contract with District;
b) A bond issued by a corporate surety authorized to issue surety insurance in
California in an amount equal to one hundred percent (100%) of the contract
provide payable under the contract securing the payment of all claims for the
performance of labor or services on, or the furnishing of materials for, the
performance of the contract.
Compliance with Laws and Standards
Section 5.10. The Significant Improvements shall be constructed, all work on the
Premises shall be performed, and all buildings, or other improvements on the Premises shall be
erected in accordance with all valid laws, ordinances, regulations, and orders of all federal,
state, county, or local governmental agencies or entities having jurisdiction over the Premises.
This includes compliance with City building standards, parking requirements, and where
applicable CEQA ; provided, however, that any structure or other Improvement erected on the
Premises, including the Significant Improvements, shall be deemed to have been constructed in
full compliance with all such valid laws, ordinances, regulations and orders when a valid final
Certificate of Occupancy allowing for occupancy and use of the structure or other
improvements have been duly issued by proper governmental agencies or entities. All work
performed on the Premises under this lease, or authorized by the lease, shall be done in a good
workmanlike manner and only with new materials of good quality and high standard.
Time for Commencement of Construction
Section 5.11. District shall cause construction of the Significant Improvements to be
commenced no later than seven (7) years after commencement of the lease (October 16,
2026). In the event that, District fails to commence construction of the Significant
Improvements on or before the seventh year after the commencement of the lease (October
16, 2026), City will provide 1 years' worth of notice in writing to District of the termination of
this lease. Said notice may be revoked by City in the event that, District causes construction of
the Significant Improvements to be commenced no later than eight (8) years after
commencement of the lease (October 16, 2027).
Time for Completion of Construction
Section 5.12. District shall complete construction of each of the Significant
Improvements no later than twelve (12) years after commencement of this lease. Completion
of construction shall be evidenced by issuance of a Certificate of Occupancy(s) or final approval
of building permits if a Certificate of Occupancy is not required. City may agree to extend the
time for completion of the Significant Improvements in writing for good cause.
#iznazVz
75B-12
EXHIBIT 1
Mechanics Lien
Section 5.13. At all times during the term of this lease, District shall keep the Premises
and all Improvements now or hereafter located on the Premises free and clear of all liens and
claims of liens for labor, services, materials, supplies, or equipment performed on or furnished
to the Premises. Should District fail to pay and discharge or cause the Premises to be released
from any such lien or claim of lien within thirty (30) days after service on District of written
request from City to do so, City may pay, adjust, compromise and discharge any such lien or
claim of lien on any terms and in any manner that City may deem appropriate. In that event,
District shall on or before the first day of the next calendar month following any such payment
by City, reimburse City for the full amount paid by City in paying, adjusting, compromising,
payment by City, reimburse City for the full amount paid by City in paying, adjusting,
compromising, and discharging that lien or claim of lien, including any attorneys' fees or other
costs expended by City together with interest at the then -maximum legal rate from the date of
payment by City to the date of repayment by District.
Zoning and Use Permit
Section 5.14. Should District deem it necessary or appropriate to obtain any use
permit, variance, or entitlements of the Premises to construct significant improvements, City
agrees to execute any documents, petitions, applications, and authorizations that may be
necessary or appropriate to construct Significant Improvements. Any permits, variances,
entitlements, and/or plans necessary to construct Significant Improvements shall be obtained
at the sole cost and expense of District and District agrees to protect and save City and the
property of City, including the Premises, free and harmless from any cost or expense.
Ownership of Improvements
Section 5.15. With the exception of Previous Improvements discussed in Section 5.01,
title to all Improvements, including Significant Improvements, to be constructed on the
Premises by District shall be owned by City unless expressly agreed in writing by the parties.
District agrees to execute, acknowledge, deliver to City any instrument requested by City as
necessary in City's opinion to perfect City's right, title, and interest to the improvements,
including Significant Improvements.
ARTICLE 6- ENCUMBRANCE OF LEASEHOLD ESTATE
Section 6.01. District shall not encumber the leasehold estate under this lease without
the express written permission of City, which permission shall not be unreasonably withheld.
#iznazVz
75B-13
EXHIBIT 1
ARTICLE 7- REPAIRS AND RESTORATION
Maintenance by District
Section 7.01. At all times during the term of this lease District shall, at District's own
cost and expense, keep and maintain the Premises, all improvements, and all appurtenances
(including landscaped and parking areas) now or hereafter on the Premises in a first-class
condition, in good order and repair, and in a safe and clean condition.
Requirements of Government Agencies
Section 7.02. At all times during the term of this lease, District, at District's own cost
and expense, shall do all of the following:
a) Make all alterations, additions, repairs to the Premises or the improvements on
the Premises, required by any valid law, ordinance, statute, order or regulation
now or hereafter made or issued by any federal, state, county, local or other
governmental agency or entity. Notwithstanding the foregoing, if the City is the
entity imposing such law, ordinance, statute, order or regulation, the District's
obligations hereunder shall apply only to those which are consistent with the
Premises' zoning, City building standards or are applicable to all properties
within the City
b) Observe and comply withal[ valid laws, ordinances, statutes, orders and
regulations now or hereafter made or issued by governmental authorities other
than the City respecting the Premises or the improvements.
c) Contest if District, in District's sole discretion, desires by appropriate legal
proceedings brought in good faith and diligently prosecuted in the name of the
District, or in the names of District and City where appropriate or required, the
validity or applicability to the Premises of any law, ordinance, statute, order, or
regulation now or hereafter made or issued by any federal, state, county, local or
other governmental agency or entity; provided, however, that any such contest
or proceeding, through maintained in the names of District and City, shall be
without cost to City, and District shall protect the Premises and City from
District's failure to observe or comply during the contest with the contested law,
ordinance, statute, order or regulation; and
d) Indemnify and hold City and the property of City, including the Premises, free
and harmless from any and all liability, loss, damages, fines, penalties, claims,
actions resulting from District's failure to comply with and perform the
requirements of this section.
District's Duty to Restore Premises
Section 7.03. If at anytime during this lease's term, any Improvement(s) or Previous
Improvements for which District holds title, now or hereafter on the Premises are destroyed in
#iznazVz
75B-14
EXHIBIT 1
whole or in part by fire, theft, the elements, or any other cause not the fault of the City, this
lease shall continue in full force and effect and District, at District's own cost and expense, shall
repair and restore the damaged Improvements or Previous Improvements.
a) Any restoration by District of the Improvement(s) shall comply with the original
plans for the improvements described in Article 5, except as (i) modified by
District and approved in writing by City or (ii) required by the DSA, the Field Act,
or other applicable law. Any restoration by District of Previous Improvements
under the previous 1979 license between the parties shall comply with the
original project approvals except that any currently applicable code updates shall
be made, except as otherwise modified by District and approved in writing by
City.
b) The work of repair and restoration shall be commenced by District within ninety
(90) days after the damage or destruction occurs and shall be completed with
due diligence not later than two years after the work commenced or a date
mutually agreed upon in writing by the parties. In all other respects, the work of
repair and restoration shall be done in accordance with the requirements for
original construction work on the whether or not funds are available from
insurance proceeds.
Application of Insurance Proceeds
Section 7.04. Any and all fire, casualty, or other insurance proceeds that become
payable at any time during the term of this lease because of damage to or destruction of any
improvements for which District holds title, on the Premises shall be paid to District and applied
by District toward the cost of repairing and restoring the damaged or destroyed improvements,
in the manner required by Section 7.03 of this lease.
ARTICLE 8- INDEMNITY AND INSURANCE
Indemnity Agreement
Section 8.01. District shall indemnify and hold City and City's property, including the
Premises, now or hereafter on the Premises, free and harmless from any and all liability claims,
loss, damages, or expenses resulting from District's occupation and use of the Premises,
specifically including, without limitation, any liability, claim, loss, damage, or expense arising by
reason of the following:
a) The death or injury of any person, including District or any person who is an
employee, board member, official, agent of District, or any invitee to the
property by District or by reason of the damage to or destruction of any
property owned by District or by any person who is an employee or agent of
District, from any cause whatever while that person or property is in or on the
#iznazVz
75B-15
EXHIBIT 1
Premises or in any way connected with the Premises or with any of the
Improvements or personal property on the Premises;
b) Any work performed on the Premises or materials furnished to the Premises at
the instance or request of District or any person or entity acting for or on
behalf of District; or
c) District's failure to perform any provision of this lease or to comply with any
requirement of law or any requirement imposed on District or the Premises by
any duly authorized governmental agency or political subdivision.
Liability Insurance
Section 8.02. District shall, at District's own cost and expense, procure and maintain
during the entire term of this lease a broad form comprehensive coverage policy of public
liability insurance issued by an insurance company licensed by the State of California insuring
District and City against loss of liability caused by or connected with District's occupation and
use of the Premises under this lease in amounts not less than the following:
a) District shall maintain commercial general liability insurance naming the City, its
officers, employees, agents, volunteers and representatives as additional
insured(s) and shall include, but not be limited to protection against claims
arising from bodily and personal injury, including death resulting therefrom and
damage to property, resulting from any act or occurrence arising out of District's
operations in the performance of this lease, including, without limitation, acts
involving vehicles. The amounts of insurance shall be not less than the following:
single limit coverage applying to bodily and personal injury, including death
resulting therefrom, and property damage, in the total amount which is
customary and agreed upon by the parties. Such insurance shall (a) name the
City, its officers, employees, agents, and representatives as additional insured(s);
(b) be primary and not contributory with respect to insurance or self-insurance
programs maintained by the City; and (c) contain standard separation of insureds
provisions.
b) Business automobile liability insurance, or equivalent form, with a combined
single limit of not less than $1,000,000 per occurrence. Such insurance shall
include coverage for owned, hired and non -owned automobiles.
c) Worker's Compensation Insurance. In accordance with the provisions of Section
3700 of the Labor Code, the District, is required to be insured against liability for
worker's compensation or to undertake self-insurance.
d) The following requirements apply to the insurance to be provided by the District
pursuant to this section:
1. The District shall maintain all insurance required above in full force and
effect for the entire period covered by this Agreement.
#iznazVz
75B-16
EXHIBIT 1
2. Certificates of insurance shall be furnished to the City upon execution of
this Agreement and shall be approved by the City.
3. The District shall supply City with a fully executed additional insured
endorsement.
Fire and Casualty Insurance
Section 8.03. District shall, at District's own cost and expense, at all times during the
term of this lease, keep all Improvements on the Premises, including Previous Improvements,
insured for their full replacement value by insurance companies authorized to do business in
the State of California against loss of destruction by fire and the perils commonly covered under
the standard extended coverage endorsement to fire and earthquake insurance policies in the
county where the Premises are located.
Specific Perils to Be Insured
Section 8.04. Notwithstanding anything to the contrary contained in Section 8.03 of this
lease, the insurance required by Section 8.03 of this lease shall, whether or not included in the
standard extended coverage endorsement referred to in Section 8.03, insurance all
improvements, including significant improvements, on the Premises against loss of destruction
by earthquake, flood, windstorm, cyclone, tornado, hail, explosion, riot, civil unrest, malicious
mischief, vandalism, aircraft, fire, smoke damage, and sprinkler leakage. Furthermore, the
insurance required by Section 8.03 of this lease during the construction of the significant
improvements described in Article 5 shall include coverage for course of construction,
vandalism, and malicious mischief, insuring the significant improvements during its
construction and all materials delivered to the site of the significant improvements for their full
insurable value.
Deposit of Insurance with City
Section 8.05. District shall, within 10 days after the commencement of the lease and
promptly thereafter when any such policy is replaced, rewritten, or renewed, deliver to City a
true and correct copy of each insurance policy required by this lease or a certificate of
insurance from an authorized agent of the insurance companies, providing evidence of the
coverages required by this lease. Failure to provide the insurance policies or a certificate of
insurance as specified in this Section is grounds for immediate termination of the lease.
Notice of Cancellation of Insurance
Section 8.06. Certificates and policies shall state that the policies shall not be canceled
or reduced in coverage or changed in any other material aspect without thirty (30) days prior
written notice to the City.
#iznazVz
75B-17
EXHIBIT 1
ARTICLE 9-CONDEMNATION
Total Condemnation
Section 9.01. If, during the term of this lease, fee title to all of the Premises or to all of
the improvements, including significant improvements, or the entire leasehold estate of District
is taken under the power of eminent domain by an public or quasi -public agency or entity
("total taking"), this lease shall terminate as of 12:01 a.m. on whichever of the following occurs
first: (1) the date legal title becomes vested in the agency or entity exercising the power of
eminent domain; or (2) the date actual physical possession is taken by the agency or entity
exercising the power of eminent domain. Thereafter, both City and District shall be released
from all obligations under this lease, except those specified in Section 9.05.
Partial Taking -Improvements
Section 9.02. If at anytime during the term of this lease a taking occurs that is less than
a total taking and affects the rentable portion of the improvements on the Premises, all
compensation and damages payable for that taking shall be made available to and used, to the
extent reasonably needed, by District to repair any portion of the remaining rentable portion of
the Improvements damaged by the taking and to replace the rentable portion of the
Improvements taken with other new rentable space on the portion of the Premises not taken,
provided that replacement is then permitted by existing law. Plans and specifications for the
replacement rental space must be compatible, in terms of architecture and quality of
construction, with the Improvements not taken and must be first approved in writing by City.
Notwithstanding anything to the contrary in this Section, if the rentable portion of the
Improvements taken by eminent domain results in a net loss of fifty percent (50%) or more of
the area of the Premises that can, after considering any replacement rentable space that can be
lawfully constructed on the remaining portion of the Premises and paid for by the
condemnation proceeds, be devoted to rentable space as compared with the area devoted to
that rentable space immediately before the taking, District may terminate this lease in the
manner prescribed in Section 9.03 of this lease. Moreover, the District may also terminate this
lease in the manner prescribed in Section 9.03 if, in the District's reasonable opinion, the
number of parking spaces taken by eminent domain deprives the Premises of sufficient parking
necessary for the operation of the college upon the Premises.
Termination for Partial Taking
Section 9.03. District may terminate this lease for the reasons stated in Section 9.02 of
this lease, by serving written notice of termination on City within sixty (60) days after District
has received from City or from the condemning authority written notice of an intended taking
that sets forth the extent and scope of the intended taking. If District elects to terminate this
lease, the effective date of the termination shall be the earlier of (1) the date of termination
#iznazVz
75B-18
EXHIBIT 1
specified in District's notice to City or (2) the date the condemning authority takes physical
possession of the portion of the Premises taken by eminent domain. On termination of this
lease under this Section, the Premises shall be delivered to City free and clear of all
encumbrances.
Condemnation Award
Section 9.04. Any compensation or damages awarded or payable because of the taking
of all or any portion of the Premises by eminent domain shall be allocated between City and
District as follows:
a) All compensation or damages awarded or payable for the taking by eminent
domain or any land that is part of the Premises shall be paid to and be the sole
property of City, free and clear of any claim of District or any person claiming
rights to the Premises through or under District.
b) All compensation or damages awarded or payable because of any
improvements, including significant improvements constructed or located on the
portion of the Premises taken by eminent domain when only a portion of the
Premises is taken by eminent domain and District is not entitled to or does not
terminate this lease shall be applied in the manner specified in Section 9.02 or
Section 9.03 toward the replacement of those improvements, including
significant improvements, with equivalent new improvements, including
significant improvements, on the remaining portions of the Premises.
c) All compensation or damages awarded or payable because of the improvements
constructed or located in the portion of the Premises taken by eminent domain
when this lease is terminated because of the taking by eminent domain, whether
all or only a portion of the Premises is taken by eminent domain, shall be
allocated between District and City as follows:
1. That percentage of the compensation or damages awarded or payable
because of the improvements that equals the percentage of the full term
of this lease that has, at the time of the taking, not expired shall belong
to and be the sole property of the District.
2. That percentage of the compensation or damages awarded or payable
because of the improvements that equals the percentage of the full term
of this lease that has, at the time of the taking, expired shall belong to
and be the sole property of City.
3. The term "time of taking" as used in this subparagraph shall means 12:01
a.m. of whichever of the following shall first occur: the date that title, the
date that physical possession of the portion of the Premises on which the
improvements are located, is taken by the agency or entity exercising the
eminent domain power.
#iznazVz
75B-19
EXHIBIT 1
d) Any severance damages awarded or payable because only a portion of the
Premises is taken by eminent domain shall be equally divided, except to the
extent needed to replace and improvements taken by eminent domain with
equivalent improvements on the remaining portion of the Premises when
District cannot or does not terminate this lease, between City and District.
Rent Abatement for Partial Taking
Section 9.04. If title and possession of only a portion of the Premises is taken under the
power of eminent domain by any public or quasi -public agency or entity during the term of this
lease and District does not or cannot terminate this lease, then this lease shall terminate as to
the portion of the Premises taken under eminent domain as of 12:01 a.m. on whichever of the
following first occurs: the date title is taken, or the date actual physical possession of the
portion taken by eminent domain is taken, by the agency or entity exercising the eminent
domain power. Furthermore the rent payable under this lease shall, as of that time, be reduced
in the same proportion that the value of the portion of the Premises taken by eminent domain
bears to the full value of the Premises at that time provided, however, that District shall,
subject to the provisions of this lease, replace any improvements or facilities on the remaining
portion of the Premises and do all other acts at District's own cost and expense required by the
eminent domain taking to make the remaining portion of the Premises fit for the uses specified
in this lease.
Voluntary Conveyance in Lieu of Eminent Domain
Section 9.05. A voluntary conveyance by City of title to all or a portion of the Premises
to a public or quasi -public agency or entity in lieu of any under threat by that agency or entity
to take it by eminent domain proceedings shall be considered a taking of title to all or any
portion of the Premises under the power of eminent domain subject to the provisions of this
Article.
ARTICLE 10- ASSIGNMENT AND SUBLEASING
No Assignment without City's Consent
Section 10.01. District may not assign this lease without the prior approval of City, which
approval shall not be unreasonably withheld.
District's Right to Sublease
Section 10.02. District may not sublease the Premises without prior approval of the City,
which approval shall not be unreasonably withheld.
#iznazVz
75B-20
EXHIBIT 1
ARTICLE 11-TERMINATION OF LEASE IF PROPERTY RETAKEN BY FEDERAL GOVERNMENT
Termination if Property Retaken by Federal Government
Section 11.01. It is understood that title to the Premises and surrounding area of
Centennial Park was conveyed to the City by Quitclaim deed from the United States of America,
and if, for any reason whatsoever, the federal government should retake possession of the
property, City shall not be liable to District in any way whatsoever on account thereof.
ARTICLE 12-DEFAULT AND REMEDIES
Continuation of Lease in Effect
Section 12.01. Should District breach this lease and abandon the Premises before the
natural expiration of the lease's term, City may continue this lease in effect by not terminating
District's right to possession of the Premises, in which event City shall be entitled to enforce all
of City's rights and remedies under this lease, including the right to recover the rent specified in
this lease as it becomes due under this lease.
Termination and Unlawful Detainer
Section 12.02. In the event of a default by District which remains uncured by the end of
any and all applicable cure periods, City may terminate this lease by providing one year's
written notice to the District and/or utilize any or all legal options available to City.
Breach and Default by District
Section 12.03. All covenants and agreements contained in this lease are declared
conditions to this lease and to the term hereby lease to District. Should District fail to perform
any covenant, condition or agreement contained in this lease and the default is not cured
within thirty (30) days, unless this lease specifies a longer cure period, after written notice of
default is served on District by City, then District shall be in default under this lease.
Notwithstanding the foregoing, if the nature of the default is such that it cannot reasonably be
cured within 30 days, the District shall not be in default if it commences the cure within that 30-
day period and thereafter diligently proceeds to implement the cure until complete. In addition
to District's failure to perform any covenant, condition, or agreement contained in this lease
within the cure period permitted by this section, the following shall constitute a default by
District under this lease:
a) The appointment of a receiver to take possession of the Premises or
Improvements, or of District's interest in, to, and under this lease, the leasehold
estate, or of District's operations on the Premises for any reason, including,
#iznazVz
75B-21
EXHIBIT 1
without limitation, assignment for benefit of creditors or voluntarily or
involuntary bankruptcy proceedings, when not released within ninety (90) days.
b) An assignment by District for the benefit of creditors; or the voluntarily filing by
District of the involuntary filing against District of a petition, other than court
action, or suit under any law for any purpose of (1) adjudicating District a
bankrupt; (2) extending time for payment, (3) satisfaction of District's liabilities,
or (4) reorganization, dissolution, or arrangement on account of, or to prevent,
bankruptcy or insolvency; provided, however, that in the case of an involuntary
proceeding, if all consequent orders, adjudications, custodies, and supervisions
are dismissed, vacated or otherwise permanently stayed or terminated within
ninety (90) days after the filing or other initial event, then District shall not be in
default under this Section; and
c) The subjection of any right or interest of District to or under this lease to
attachment, execution, or other levy, or to seizure under legal process when the
claim against District is not released within ninety (90) days.
Cumulative Remedies
Section 11.04. The remedied given to City in this Article shall not be exclusive but shall
be cumulative with and in addition to all remedies now or hereafter allowed by law and
elsewhere provided in this lease.
Waiver of Breach
Section 11.05. The waiver by City of any breach by District of any of the provisions of
this lease shall not constitute a continuing waiver or a waiver of any subsequent breach by
District of either the same or a different provision of this lease.
Surrender of Premises
Section 11.06. On expiration or earlier termination of this lease, District shall surrender
the Premises and all improvements, including significant improvements in or on the Premises to
City in as good, safe, and clean condition as practicable, reasonable wear and tear expected.
Default by City
Section 11.07. should the City fail to perform any covenant, condition or agreement
contained in this lease and the default is not cured within thirty (30) days, unless this lease
specifies a longer cure period, after written notice of default is served on the City by the
District, then the City shall be in default under this lease. Notwithstanding the foregoing, if the
nature of the default is such that it cannot reasonably be cured within 30 days, the City shall
not be in default if it commences the cure within that 30-day period and thereafter diligently
proceeds to implement the cure until complete.
#12402v2 7 5 B-22
EXHIBIT 1
ARTICLE 12- OTHER PROVISIONS
Force Majeure
Section 12.01. Except as otherwise expressly provided in this lease, if the performance
of any act required by this lease to be performed by either City or District is prevented or
delayed by reason of any act of God, strike, lockout, labor trouble, inability to secure materials,
restrictive governmental laws or regulations, or any other cause (except financial inability) not
the fault of the party required to perform the act, the time for performance of the act will be
extended for a period equivalent to the period of delay and performance of the act during the
period of delay will be excused. However, nothing contained in this section shall excuse the
prompt payment of rent by District as required by this lease or the performance of any act
rendered difficult or impossible solely because of the financial condition of the party required
to perform the act.
Attorneys' Fees
Section 12.02. Should any litigation be commenced between the parties to this lease
concerning the Premises, this lease, or the rights and duties of either in relation thereto, the
party prevailing in that litigation shall be entitled, in addition to any other relief that may be
granted in the litigation, to a reasonable sum as and for the party's attorneys' fees in that
litigation that shall be determined by the court in that litigation or in a separate action brought
for that purpose.
Notices
Section 12.03. Except as otherwise expressly provided by law, any and all notices or
other communications required or permitted by this lease or by law to be served on or given to
the parties shall be in writing and shall be deemed duly served and given when personally
delivered to either party, or, in lieu of personal service, when deposited in the United States
mail, first-class postage prepaid, or sent by express mail that allows for tracking, or delivered by
Fed Ex or any similar commercial courier and sent by next -day delivery where the signature of
the recipient is required, addressed in all cases to the parties as indicated below. Either party
may change its address for purposes of this Section by giving written notice of the change as
specified in this Section.
a) Notice to City/City:
Clerk of Council
City of Santa Ana
20 Civic Center Plaza, M-30
Post Office Box 1988
Santa Ana, California 92702
And,
#iznazVz
75B-23
EXHIBIT 1
Executive Director of Parks, Recreation, and Community Services Agency
City of Santa Ana
20 Civic Center Plaza, M-23
Post Office Box 1988
Santa Ana, California 92702
With a courtesy copy to,
City Attorney
City of Santa Ana
20 Civic Center Plaza, M-29
Post Office Box 1988
Santa Ana, California 92702
b) Notice to District/Tenant:
Attention: Chancellor
Rancho Santiago Community College District
2323 North Broadway Street
Santa Ana, California 92706
With a courtesy copy to,
Ruben A. Smith, Esq.
AlvaradoSmith
1 MacArthur Place, Suite 200
Santa Ana, California 92707
Governing Law and Venue
Section 12.04. This lease, and all matters relating to this lease, shall be governed by the
laws of the State of California in force at the time any need for interpretation of this lease or
any decision or holding concerning this lease arises. Venue for any action regarding
enforcement or interpretation of this lease shall be proper in Orange County, California.
Binding on Heirs and Successors
Section 12.05. This lease shall be binding on and shall inure to the benefit of the heirs,
executors, administrators, successors, and assigns of the parties hereto, but nothing in this
#iznazVz
75B-24
EXHIBIT 1
section shall be construed as a consent by City to any assignment of this lease or any interest in
the lease by District except as provided for in Article 10 of this lease.
Partial Invalidity
Section 12.06. If any provision of this lease is held by a court of competent jurisdiction
to be invalid, void, or unenforceable, the remaining provisions of this lease shall remain in full
force and effect unimpaired by the holding.
Sole and Only Agreement
Section 12.08. This instrument constitutes the sole and only agreement between the
City and District respecting the Premises, the leasing of the Premises to District, the agreement
to construct the Improvements, including Significant Improvements but not the details of the
Improvements or Significant Improvements, described in this lease on the Premises, and the
lease terms set forth in this lease, and correctly sets forth the obligations of City and District to
each other as of its date. Any agreements or representations respecting the Premises, their
leasing to District by City, or any other matter discussed in this lease not expressly set forth in
this instrument are null and void.
Time of Essence
Section 12.09. Time is expressly declared to be of the essence of this lease.
Non -Discrimination
Section 12.10. District shall not discriminate because of race, color, creed, religion, sex,
marital status, sexual orientation, gender identity, age, national origin, ancestry, or disability, as
defined and prohibited by applicable law, in the recruitment, selection, training, utilization,
promotion, termination or other employment related activities. District affirms that it is an equal
opportunity employer and shall comply with all applicable federal, state and local laws and
regulations.
IN WITNESS WHEREOF, the parties hereto have executed this Lease Agreement the date
and year first above written.
CITY OF SANTA ANA
RANCHO SANTIAGO COMMUNITY COLLEGE
DISTRICT
KRISTINE RIDGE
MARVIN MARTIN
City Manager
Chancellor
ATTEST:
#iznazVz
75B-25
EXHIBIT 1
DAISY GOMEZ
Clerk of the Council
APPROVED AS TO FORM:
APPROVED AS TO FORM:
SONIA R. CARVALHO
City Attorney
By:
Laura A. Rossini
Ruben Smith, Esq.
Senior Assistant City Attorney
AlvaradoSmith, APC
RECOMMENDED FOR APPROVAL:
LISA RUDLOFF
Executive Director,
Parks, Recreation and Community Services
Agency
#iznazVz
75B-26
EXHIBIT 1
EXHIBIT A
Description of Real Property Subject to Lease
#iznazVz
75B-27
i5
75B-28