HomeMy WebLinkAboutC.S. LEGACY CONSTRUCTION, INC. (CENTER STREET URBAN GREENING PROJECT)THE REGISTER
2190 TOWNE CENTER PL, ANAHEIM, CA 92806
Telephone (714) 796-7000 / Fax (714) 796-6059
CNS#: 3245195
PROOF OF PUBLICATION
(2015.5 C.C.P.)
State of Califointia )
County of ORANGE ) ss
Notice Type: BID- NOTICE INVITING BIDS
Ad Description:
17.2674 CENTER STREET URBAN GREENING
1 am a citizen of the United States and a resident of the Stale of California; I am
over the age of eighteen years, and not a party to or Interested In the above
entitled matter. I am the principal clerk of the printer and publisher of the THE
REGISTER, a newspaper published in the English language in the city of
SANTA ANA, county of ORANGE, and adjudged a newspaper of general
circulation as defined by the laws of the State of California by the Superior
Court of the County of ORANGE, Slate of California, under date 11/1911905,
Case No. A21046. That the notice, of which the annexed is a printed copy, has
been published in each regular and entire issue of said newspaper and not In
any supplement thereof on the following dates, to -wit:
04/19/2019, 04/26/2019
Executed on: 04/26/2019
At SANTA ANA,CA
I certify (or declare) under penalty of perjury that the foregoing Is true and
correct,
f gnature
IIII I II IIII II IIIIIIIIII I III IIII IIII I IIII I II
Email * A 0 0 0 0 0 5 0 4 2 6 2 6*
This space for filing stamp only
+ NOTICE! INVITING
+' GIVEN that the City�
of+Santa Ana will re-,
celva Bids electron11
Pit atBlds on or be
to fhe hour of
2:00:59 Pmr MaY 20
2e79. No late hitls wII
mthod I
eaft bid sutimit-
tat will be accepted
to
PROJECT N0.: 17•
Prowae 1
oumems
YocaubQ�
none
raft
MAYOR
nK
CITY MANAGER
Mlgual A. Pultdo
Dny d CaY9ZUa
MAYOR PRO TEM
Sel Tlnajaro
l
CITY ATTORNEY
Bonin R. Carvalho
COUNCIL, MEMBERS;
„ 9
CLERK OF THE COUNCIL
Angelica Amezcua
Maria 1), Huizar
P. David Benavidos
Michele Martinez
Roman A. Royna
Vincent F.Sanniento
CITY OF SANTA ANA
PLANNING & BUILDING AGENCY
20 Clvio Center Plaza (M•20)
P.O, BOX 1988. Santa Ana, California 92702
(714) 867-2700 � Fax (714) 971.1461
www.santa-ana,org
NOTICE OF EXEMPTION
From the Requirements of the California Environmental quality Act (CEQA)
To: COUNTY CLERK From: City of Santa Ana
County of Orange Planning & Building Agency
P.O. Box 238 20 Civic Center Plaza M-20
Santa Ana, CA 92702 Santa Ana, CA 92702
Project Title: Urban Greening Center Street pate of Approval: 10/21/2013
Project Number(s): PWA 2013-1163-GAPP
Project 1_ocation: 1 CltyWlde (Partial)
City: Santa Ana County: Orange ER Number: ER-2013.94
Project Description: Removal of street, grading, new permeable walkway, bioswate, drought tolerant landscaping, automatic
drip irrigation, interpretive signage, site amenities and furnishings.
'piloant Name: Suzi Fuljanic
plicant Address: City of Santa Ana: 20 Civic Center Plaza M-36
SANTA ANA, CA 92701
Name of Public Agency Approving Project: City Council
Name of Person or Agency Carrying Out Project: Furi'anic, Suzl
exempt status:
C1 Ministerial (Sec, 15266)
CI Declared Emergency (Sec. 16269 (a))
tg Emergency Project (Sec. 162.69 (b through e))
• General Rule (Sec. 15061(b)(3)/(6))
tG Statutory Exemption:
121 Categorical Exemption: 16304 Class 4
Reason(s) Why Project is Exempt From CEQA:
Project involves minor alterations to existing land including new drought tolerant landscaping, drip Irrigation system and does not
include removal of existing trees.
City Contact: Suzf Furjanic
Telephone: (714)571-4241
Signature: �� "" Title: Skz• "/� �Irnnr" Data:
SANTA ANA CITY COUNCIL
Mlgual A. Pulido sal Ylnniero Valcont r, snmuonto Michele Martinez Anaallca AmmQa P. David aenavldes Roman Rayna
Mayor Mayor Pro Tem, Ward U Word Ward ward3 Wartl4 Wards
ILu11ti:agnla:riCla,.cYc S1L+In4ornttRd�tnta�rnesN �JBPm�aninl�AsOntaiaw are MMarti_uw-.�?;eaNannu.cer.EA�nox&Yar�,�.t?W�a.a<m.nRl O.fienflxld�s�nnin.:arw.n�S;R�megtaeakte.Ntus�e
`7
AUG 2 G 2019
CITY OF SANTA ANA
oP VA V) CONSTRUCTION CONTRACT
M i �l u c l or l2 PROJECT 17-2674
CENTER STREET URBAN GREENING PROJECT
This CONSTRUCTION CONTRACT is made and entered into this 16s' day of July, 2019 by and
between the City of Santa Ana, California, a charter city and municipal corporation organized and
existing under the Constitution and laws of the State of California (hereinafter "CITY"), and C.S.
Legacy Construction, Inc. (hereinafter "CONTRACTOR").
WITNESSETH:
The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows:
1. CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and
expense necessary to construct and complete in a good and workmanlike manner and to the
satisfaction of the City Engineer of the CITY, the Center Street Urban Greening Project (hereinafter
referred to as the "WORK OF IMPROVEMENT') identified in and in accordance with the Contract
Documents prepared by the City's Public Works Agency and approved by the City Council.
2. The complete Construction Contract consists of the "Contract Documents" as defined by the
Standard Specifications for Public Works Construction and which include the following:
• Notice Inviting Bids
• Information to Bidders
• Bid Proposal
• Bid Bond
• Contract Form
• Contract Bonds
• General Provisions
• Special Provisions
• Technical Provisions and Project Plans
• Community Workforce Agreement
• Appendices
In case of conflict between the Contract Documents, the precedence of documents shall be as
established in the Standard Specifications for Public Works Construction.
3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the WORK
OF IMPROVEMENT the sum total amount not to exceed Nine Hundred Ninety Thousand Seven
Hundred Forty-three and Five Cents ($990,743.05), as set forth and identified in the BID
PROPOSAL, which is attached hereto and incorporated herein as Exhibit "A."
The BID PROPOSAL contains a schedule of unit price(s) or lump sum(s) based on approximate
quantities only, and the City does not expressly or by implication agree that the actual amount of
work will correspond therewith, but reserves the right to increase or decrease the amount of any
class or portion of the work or to omit portions of the work as may be deemed necessary or
advisable.
mm 09ro1/2017 Page I of 3
4. CONTRACTOR agrees to complete the WORK OF IMPROVEMENT within the time specified in
the Time for Completion of Improvements section of the BID PROPOSAL (Exhibit "A") including
commencing construction within the timeframe therein specified after issuance of a Notice to
Proceed.
5. The CONTRACTOR will pay, and will require all subcontractors to pay, all employees on the
WORK OF IMPROVEMENT a salary or wage at least equal to the prevailing salary or wage
established for such work as set forth in the wage determinations for this work in accordance with
applicable State and Federal law.
6. If applicable, the CONTRACTOR shall adhere to the CITY'S Community Workforce Agreement
(CWA), a pre -hire collective bargaining agreement, which establishes the labor relations policies and
procedures for CONTRACTOR to follow in the crafts persons employed to complete the WORK OF
IMPROVEMENT as more fully described in the CWA. The CWA may be found on the City's
website at:
htt�www.santa-ana org(nwa/documents/CWA.r) f
7. CONTRACTOR shall, after award of this Contract, furnish two bonds to be approved by the CITY,
one in the amount of One Hundred Percent (100%) of the Contract price, to guarantee the faithful
performance of the work (Performance Bond), and one in the amount of One Hundred Percent
(100%) of the Contract price to guarantee payment of all claims for labor and materials furnished
(Payment Bond). This Contract shall not become effective until such bonds are supplied to and
approved by the CITY.
8. CONTRACTOR shall, prior to the release of the performance and payment bonds or the retention
payment, finish a warranty performance and payment bond (Warranty Bond). Said Warranty Bond
shall also be required as a condition of project acceptance. For projects up to Five Hundred
Thousand Dollars ($500,000), the Warranty Bond amount shall be the greater of Ten Thousand
Dollars ($10,000) or Twenty Percent (20%) of the final contract price. For projects above Five
Hundred Thousand Dollars ($500,000), the Warranty Bond amount shall be the greater of One
Hundred Thousand Dollars ($100,000) or Ten Percent (10%) of the final contract price.
9. CONTRACTOR shall, after award of this Contract, furnish Certificates of Liability Insurance and
Worker's Compensation Insurance as outlined in the General Provisions, to be approved by the
CITY.
//
Page 2 of 3
IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the day and
year fast above written.
ATTEST:
r � �ei,1 I� • ;
APPROVED AS TO FORM:
SONIA R. CARVALHO
City Attorney
By-
JORN FUNK
Assistant City Attorney
FOR APPROVAL:
PE, PLS
Executive
Public We
CITY OF SANTA ANA
�-=��nf`
RIDGE
City Manager
CONTRACTOR:
C.S. Legacy Construction, Inc.
NAME: / C rt" S
TITLE: le-1 eta
Page 3 of 3
City of Santa Ana
Center Street Urban Greening (17-2674), bidding an May 29. 2019 2:00 PM (Padgo)
Slid Results
Bidder Details
Vendor Name
C.S. LegacyConstrucgon,Inc.
Address
1704 Unit B S Grove Ave
Ontario, CA 91761
United States
Respoodee
Richard Gonzales
RespondeeTitle
Estimator
Phone
CA DiR
Bid Detail
Bid Format
Electronic
Submitted
May 29, 2019 12:14:34 PM (Pacinc)
Whrary Method
Bid Responsive
Bid Status
Submitted
CoMltmatlon#
178576
Rankling
0
Responded Comment
Buyer Comment
Attachments
FRO Title
General Forms
Ownership Affidavit
Bid Bond
Non -Collusion Affidavit
Line Items
Type time Code
Betio Bid Items
1 Unclassified Excavation
File Name
City of Santa Ana - Bld.pdf
04 of Santa Ana -Ownership Affidavit (2).pdf
City of Santa Ana Bid Bond (2).pdf
City of Santa Ana - Non - Collusion Affidavitpdf
UCm City
CY 2000
2 Cleating and Grubbing
48 1
PlanetBids, Inc.
Unit Price
$76.16
$77,628.00
Page 1
Printed061131MI9
EXHIBIT A
File Type
General Forms
Ownership Affidavit (Notary
Public)- REQ Odglnai
Hard Copy Submittal In
Addition
Bid Bond Guaranty (Notary
Public) - REQ Original
Hard Copy Submittal In
Addition
Nat -Collusion Affidavit
(Notary Public), REQ
Original Hard Copy
Submittal In Addifion
Llna Tetal Comment
$162,320.00
$7r,s2a.00
City of Santa Ana
Page 2
Center Street Urban Greening (17-2674), bidding on May 29, 2010 2:00 PM
(PadOo)
printed
06113/201e
Bid Results
EXHIBIT A
Type Item Code
3
UCM
City
UOlt Price
Lino Total Comment
AC Pavement
..-.. _
_ SF
8200
$6.80
$42,160.00
4 Striping
"
LS
1
$4,111.00-
$4,111.00
6 Grant Slgnnga
EA
1
$1.348.00
$1,348.00
6 RoOgh Gmding
SF
am
$0.70
$48,408.00
7 PCC Curb and Gutter
LF
265
$33.0D
$8,418:00
8 PCC Cross Gutter
LF
71
$40.00
$3.080.00
9 Parkway Culvert Dram
....
.... .. .
EA
2
$3,965.00
$7.930.00
t8 U51ityAdjustment to Grade
.... .. ... a.. .. ..
4S
1
$%674,00
$8,674.00
11 4" PCC Sidewalk"
...
... SF. .._ .. _
t880
$6.45
$10,002.00
12 6" Plaza Paving (Type 1)
..
_. .. -
SF
4828
$12.00
$57,900.00
13 6" Plaza Paving (Type 2)
.
. M1 ..
.. . SF
1895
$30.00
$68.220.00
14 Interlocking Pavers
- -
SF
0802
$18.00
$118,116.00
15 Pedestrian Bridge
SF
040
$37.00
$10,080,00
16 Vagatated Sloswala and Blorebmtlon Area with drainage
La
1
$110,981.00
$110,981.00
17 Boulders A
. ..
FA
17
$S45.00
$6,865.00
18 Boulders B
EA
17
$362.00
$0,154.00
PlanotBids,Inc.
City of Santa Ana
Page 3
Center Street Urban Greening (17-2674), bidding on May29, 2019 2:00
PM (Paclgc)
Printed OW1312019
Bid Results
EXHIBIT A
Type Item Code
UOM
city
Unit Prloa
Lhla Total Comment
19 Decomposed Granite
-
8F
11692
$3.00
$35,076.00
20 Metal Edging
LF
Isis
$7.00
$10,605.00
21 0" Concrete Mow Curb
LF
56
$34.00
91.904.00
22 Benches-4'"Vega"
'
EA
6
$1,807.00
$10.942.00
23 Bollards -Fixed
FA
7
$1.030.00
$12,810.00.
24 Bollards - Collapsible
FA
6
$2,244.00
$11,220.00
25 Interpretive Sign
EA
1
$4,321.00
$4,321.00
26 Sall Amendments
Cy
115
$69.00
$6,785.00
27 Fine grading
8F
17506
$0.25
$4,975.25
26 Irrigation System
LS
1
$50,682.00
$581502.00
28 Trees -15 gallon
EA
29
$166.00
$4,495.00
30 Shrubs -6gallon
,
EA
253
$26.00
$8,326.00
31 Shrubs-1 gallon
EA
492
$14.00
$6,088.00
32 Grasses-5 gallon
.. ..
EA
-.
103
$28.00
4;2,515.00
33 Grasses -1 gallon
...
...
EA
1139
$14.00
$15,040.00
34 Hydroseeding-StoSilraticnMix @801b/AC
SF
4465
$0.70
$31125.50
Planotaids, Inc,
City of Santa Ana
Page 4
Center Street Urban Greening (17-2674), bidding on May 29, 2019 2:00 PM (Pacinc)
Printed 0w13l2019
Bid Results
EXHIBIT A
Type
Item Cede
LON
Qty
UnBPdce
Line Total Comment
35
Hydroseeding- BIo81tre8on Mix (2$I OlbtAC
8F
3535
$0.72
$2,54520
36
Hydroseeding•Aquawtse
SF
2390
$0.99
$2,360,10
37
Nallve Mow Free Fescue
SF
..
1000
..
$1.13
.. _
$1,130.00
..
38
Tutu
..
sF
00o
$1.12
$1,008.00
39
SWPPP (Erosivity Waivef)1Emslon Control
L8
1
$10,695.00
$10,695.00
40
Landscape & Irrigation 18"alendar pay Maintenance Period
LS
1
$14.723.00
$14,723.00
41
As -Built Plans
L9
1
$3,068.00
$3,OBB.00
42
Labor Agreement Oversight
Ls
1
$10,000.00
$10,000.00
- `
Subtotal
$990,743.05
Add Alternate Bid 1: NOT part of Base Bid Calculation
43
Walkway Lighting- Light Pole Standards
EA
6
.-
$6,246.00
..
$37.476.00
..
44
Walkway Ugtding-Wldng
.
LF
1630
$2.68
$3,947.40
45
Walkway lighting -Connection
Ls 1
$14,096.00
$14,095.00
Subtotal
$66,518A0
Add Alternate Bid 2: NOT part of Base Bid Calculation
46 Bench - W "Wave"
EA 4
$1,648.00
$6,684.00
47 Bike Rack
EA 1
$3,09600
$3,035.00
subtotal
$0,619.00
Add Alternate Bid 3: NOT part of Base Bid Calculation
48 Raised Play Mounds with concrete mow curb
EA 3
$6,360.00
$16,050.00
Subtotal
$18,050.00
Planetalds, Inc.
I
City of Santa Ana
Center Street Urban Groaning (17-2674), bidding on May 29, 2010 2:00 PM. (Pad0o)
Bid Results
Type Item Codo UOM 6tty
Add Alternate Bid 4: NOT part of Baas Bid Calculation
49 Gabion Circular Seat
LS 1
Add Alternate Bid 5: NOT part of Base Bid Calculation
00 Concrete Block. Bench Cluster
Unit Price
$18,080.00
Subtotal
LS 1 $24,770.00
Subtotal
Total
planotBide, Inc.
Page a
Pdnted 98M3/2019
EXHIBIT A
Una Total Comment
$1a,980,Q0
E18,988.06
$24,778,00
$24,778.00
$1,113,8a8A5
CITY OF SANTA ANA
BID PROPOSAL
PROJECT NO.: 17-2674
CENTER STREET URBAN GREENING EXHIBIT A
TOTAL BASE BID
$
39 p -1�3. oS
TOTAL ADD ALTERNATE BID 1
$
55t 51�. �D
TOTAL ADD ALTERNATE BID 2
$
9 �1
TOTAL ADD ALTERNATE BID 3
$
I tv, 0so. Ob
TOTAL ADD ALTERNATE BID 4
$
I
TOTAL ADD ALTERNATE BID 5
$
Z'+� -1, b cb
The lowest responsible bidder shall be selected based on the total base bid. The City reserves the right to
award the Base Bid, and any, all, or none of the add -alternate bid items (if any).
* The quantity for this bid item is shown forbid comparison only. This bid item shall not be subject to
the "25W limit as stated in Section 3-2 of the Standard Specifications. The actual amount for this
item will be dictated by the actual quantity used, and the Agency reserves the right to increase or
decrease the quantity of this item accordingly.
TIME FOR COMPLETION OF IMPROVEMENT'S AND LIQUIDATED DAMAGES
The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown above,
within sixty (60) working days after the commencement date stated in the Notice to Proceed
The liquidated damages amount, in lien of the amount specified in Subsection 6-9 of the Standard
Specifications, shall be $1,000 per calendar day.
The undersigned bidder hereby proposes to complete all requirements and items outlined in the most current
Construction General Permit, within sixty (60) working days after the date stated in the Notice of
Completion.
The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard
Specifications, shall be $1,000 per calendar day.;
Name of Firm C.S.
Signature of BIDDER
TVePISLtt-er, h
Title Ptvci rll
(If an individual, so state. If —a fir r co -panne ship, state the firm name and give the names of all
individual co partners composing the firm. If a corporation, state legal name of corporation, and names
of President, Secretary, Treasure Manager, thereof)
9 i c,hgk -c Gta n 2.ci Uk - SC C"-'fo ky
P-5 ofP-19
City of Santa Ana
Page 1
Center Street Urban Greening (17-2674), bidding on May 29, 2019 2:00 PM (Poolflo) Printed 06/13/2010
Bid Results
Bidder Details
Vendor Name
C.S. Legacy Construction, Inc.
Address
1704 Unit B S Grove Ave
Ontado, CA 91761
United States
Respondee
Richard Gonzales
RespondeeTitle
Estimator
Phone
909.590.2626 Ext.
Email
lichard@csiegacy, net
Vendor Type
CADIR
License 0
826870
CA DIR
Bid Detail
Bid Format
Electronlo
Submitted
May 29, 2019 12:14:34 PM (Pacific)
Delivery Method
Bid Responsive
Bid Status
Submitted
Confirmation #
178576
Ranking
0
Respondee Comment
Buyer Comment
Attachments
File Title
File Name
File Type
General Forms
City of Santa Ana - Bid.pdf
General Forms
Ownership Affidavit
City of Santa Ana - Ownership Affidavit (2).pdf
Ownership Affidavit (Notary
Public) - REQ Original
Hard Copy Submittal In
Addition
Bid Bond
City of Santa Ana - Bid Bond (2).pdf
Bid Band Guaranty (Notary
Public) - REQ Original
Hard Copy Submittal in
Addition
Nan -Collusion Affidavh
City of Santa Ana - Non - Collusion Affldavitpdf
Non-Colluslon Affidavit
(Notary Public) - REQ
Original Hard Copy
Submittal In Addition
Line Items
Type Item Code
UOM Qty Unit Price
Line Total Comment
Base Bid Items
'
1 Unclassifled Excavation
CY 2000 $76.16
$162.320,00
2 Clearing and Grubbing
LS 1 $77.528.00
$77,828.00
PlanetBids, Inc.
City of Santa Ana
Page 2
Center Street Urban Groaning (17-2674), bidding on May 29, 2019 2:00
PM (Pacific)
Printed 00/1312019
Bid Results
Typo Item Code
UOM
Qty
Unit Pries
Line Total Comment
3 AC Pavement
SF
6200
$6.80
$42,160.00
4 Striping
LS
1
$4,111.00
$4,111.00
5 Grant Signage
EA
1
$1,343.00
$1,348.00
6 Rough Grading
SF
63800
$0,76
$48,488.00
7 PCC Curb and Gutter
LF
266
$33.00
$6,415.00
8 PCC Cross Gutter
LF
77
$40,00
$3,080,00
9 Parkway Culvert Drain
EA
2
$3,966.00
$7,930,00
10 Utility Adjustment to Grade
LS
1
$8,674.00
$8,674.00
41 4" PCC Sidewalk
SF
1660
$6.45
$10,062.00
12 6" Plaza Paving (Type 1)
SF
4825
$12.00
$57,000.00
13 6" Plaza Paving (Type 2)
SF
1895
$36.00
$08,220.00
14 Interlocking Pavers
SF
6662
$18.00
$118,116.00
15 Pedestrian Bridge
SF
540
$37.00
$19.980.00
16 Vegetated Bloswale and Bloretenllon Area with drainage
LS
1
$110,981.00
$110,981.00
17 Boulders A
EA
17
045.00
$5,865.00
18 Boulders B
EA
17
$362.00
$6,164.00
PlanetBids, Inc,
City of Santa Ana Paw 3
Center Street Urban Greening (17-2674), bidding on May 29, 2019 2:00 PM (Paciflc) Printed 06/13/2019
Bid Results
Type
Item Code
UDM
qty
Unit Price
Line Total Comment
19
Decomposed Granite
SF
11092
$3.00
$35,070.00
20
Metal Edging
LF
1515
$7.00
$10.606.00
21
6" Concrete Mow Curb
LF
50
$34.00
$1,904.00
22
Benches -4'"Vega"
EA
6
$1,807.00
$10,842.00
23
Bollards - Fixed
EA
7
$1.830.00
$12,810,00
24
Bollards -Collapsible
EA
5
$2,244.00
$11,220.00
25
Interpretive Sign
EA
1
$4,321.00
$4,321.00
26
Soil Amendments
CY
115
$59.00
$6,785.00
27
Fine grading
SF
17505
$0.25
$4,376.26
28
brlgalion system
LS
1
$56,662,00
$66,562.00
29
Trees -15 gallon
EA
29
$155.00
$4,495.00
30
Shrubs - 5 gallon
EA
253
$25.00
$6,325.00
31
Shrubs - I gallon
EA
492
$14.00
$6,888.00
32 Grasses-5 gallon
EA 103 $26.00 $2,575.00
33 Grasses-1 gallon
EA 1139 $14.00 $15,940.00
34 Hydroseeding - Bloflltratlan Mix @801b/AC
SF 4406 $0.70 $3,125.60
PlanetElds, Inc.
City of Santa Ana
Page 4
Center Sheet Urban Greening (17-2674), bidding on May 29, 2019 2:00 PM (Paciflo)
Printed O011312019
Bid Results
Type
Item Code uom
Qty
Unit Price
Line Total Comment
36
Hydroseeding - Bloflltration Mix @161b/AC
SF
3535
$0.72
$2,545.20
36
Hydroseeding- Aquawlse
Sr
2390
$0.99
$2,366.10
37
Native Maw Free Fescue
SF
1000
$1.13
$1,130.00
38
Turf
SF
900
$1.12
$1,008.00
39
SWPPP (Erosivity Welver)/Eroslon Contra[
LS
1
$10,695.00
$10,695.00
40
Landscape & Irrigation 180-Calendar Day Maintenance Period
LS
1
$14,723.00
$14,723.00
41
As•SulltPlane
LS
1
$3,086.00
$3,088.00
42
Labor Agreement Oversight
LS
1
$10,000.00
$10,000.00
Subtotal
$990,743.05
Add Alternate Bid 1: NOT part of Base Bid Calculation
43
Walkway Lighting - Light Pole Standards
EA
8
$6,246.00
$37,476.00
44
Walkway Lighting- Wiring
LF
1530
$2.68
$3,947.40
45
Walkway Lighting - Connection
LS
1
$14,095.00
$14,096.00
Subtotal
$55,518.40
Add Altemate Bid 2: NOT part of Base Bid Calculation
46
Bench - 4"'Wave"
EA
4
$L646.00
$6,584.00
47
Bike Rack
EA
1
$3,035.00
$3,035.00
Subtotal
$9,619.00
Add Alternate Bid 3: NOT part of Base Bid Calculation
48
Ralsed Play Mounds with concrete mow curb
EA
3
$6,360.00
$16,050.00
Subtotal
$16,050.00
PlanetBids, Inc.
Clty of Santa Ana
Center Street Urban Greening (17-2674), bidding on May 29, 2019 2:00 PM (Padflo)
Bid Results
Type Item Code uOM Oty
Add Alternate Bid 4: NOT part of Base Bid Calculation
49 Gablon Circular Seat
LS 1
Add Alternate Bid 5: NOT part of Base Bid Calculation
50 Concrete Black Bench Cluster
Unit Price
$16,980.00
Subtotal
Ls 1 $24.770.00
Subtotal
Total
PlanotBids,Inc.
Page 5
Printed 0611312019
Line Total Comment
$18,880,00
$18,980.00
$24,776.00
$24,776.00
$1,113,086.45
MAYOR
Miguel A. Pultdo
MAYOR PRO TEM
Juan Villegas
COUNCILMEMBERS
Cecilia Iglesias
David Penaloza
Mcente Sanniento
Jose Solaria
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
20 Civic Center Plaza (M-22)
Santa Ana, California 92701
www.santa-ana.org
May 16, 2019
ADDENDUM NO. ONE
CITY MANAGER
Kristine Ridge
CITY ATTORNEY
Sonia R. Carvalho
ACTING CLERK OF THE COUNCIL
Norma Mitre
SUBJECT: PROJECT NO. 17-2674: CENTER STREET URBAN GREENING
The following changes have been made for the subject project:
Specifications:
Page vii, "NOTICE INVITING BIDS': Revise first sentence of first paragraph to
read as follows:
"NOTICE IS HEREBY GIVEN that the City of Santa Ana will receive bids
electronically via Planetbids on or before the hour of 2:00:59 pm, May 24, 2019.
All other terms and conditions remain the same.
FOR THE CITY ANA
Edwin "William" Gal z, P.E.
City Engineer
SANTA ANA CITY COUNCIL
Ml6usl A. NWo Juan VAas Uoenls sannienb David Panaldaa Joss a➢brio Vacant C 68 Iglesias
Maya, Mayor Pm Tam, Ward 5 WaJI Wady Wad's W904 Ward
IHnuliddlS&lie-ena nr0 IVIOE➢a5�58nIE-8n8IX0 Y3➢llNEnld�68n18-and 0,d tl[Me,��`➢T?®6'jn`la :n+"�O -KdnrN �an1H-8144 ➢Id _ _ aWEEIaz�USHIN}dne"R➢
MAYOR
Miguel A. Pulido
MAYOR PRO TEM
Juan Villegas
COUNCILMEMBERS
Cecilia Iglesias
David Penaloza
Vicente Sarmiento
Jose solono
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
20 Civic Center Plaza (M-22)
Santa Ana, California 92701
www.santa-ana.ora
May 23, 2019
ADDENDUM NO. TWO
CITY MANAGER
Kristine Ridge
CITY ATTORNEY
Sonia R. Catvalho
ACTING CLERK OF THE COUNCIL
Norma Mitre
SUBJECT: PROJECT NO. 17-2674: CENTER STREET URBAN GREENING
The following changes have been made for the subject project:
Plans:
Delete Sheets GN-01, GR-01, RA-01, LC-02, LC-03, LP-01 and LP-02 and replace with
new sheets GN-01, GR-01, RA-01, LC-02, LC-03, LP-01 and LP-02.
Specifications:
Page vii, "NOTICE INVITING BIDS". Revise first sentence of first paragraph to read as
follows:
"NOTICE IS HEREBY GIVEN that the City of Santa Ana will receive bids electronically via
Planetbids on or before the hour of 2:00: 59 pm, May 29, 2019.
2. Delete page 25 and replace with new page 25.
3. Delete page "P-1 of P-1" and replace with new page "P-1 of P-1".
4. Delete "Technical Specifications" section in its entirety and replace with new Technical
Specifications.
5. Appendix A: Definition of Bid Items: Delete "Appendix A: Definition of Bid Items, Pages 1-
3 (of 9)" and replace with new Appendix A: Definition of Bid Items, Pages 1-3 (of 9).
6. Appendix E: add "State of California Grant Sign Guidelines" exhibit to Appendix E, for new
grant signage.
All other terms and conditions remain the same.
FOR THE CITY OF SANTA ANA
Edwin "William" Galvez, P.E.
City Engineer
SANTA ANA CITY COUNCIL
Migwl A. Pulido Juen VOlegas Vicente 5avniento D.Ad Penaleza
Mayor Mayar Pro Tem, Ward 5 Ward 1 Wad 2
Nillnmsosanta [ glrsab tl I ® rtla
Jose W.H. Vaeerrt Cecilia lglpslas
Wadi Wad4 Wads
isolono(msaMa-aria om crcrmlaSOs te_
1.00
1.01
1.02
1.03
1910
CITY OF SANTA ANA
SPECIFICATIONS
PROJECT NO.: 17-2674
CENTER STREET URBAN GREENING
SPECIAL PROVISIONS - CONSTRUCTION
ROCK PRODUCTS
Alternate rock products, asphalt concrete, Portland cement concrete (PCC), and untreated
base material shall be alternate rock material — Type S per Section 400 of the Standard
Specifications.
RELATIVE COMPACTION TESTS
The following test methods shall be used for determining relative compaction:
California Test 216 (Sand Cone Method)
California Test 231 (Nuclear Gauge Method)
The Contractor will be provided with compaction test at locations deemed necessary by the
Engineer. If compaction fails to meet the contract specifications, then the Contractor shall
make the necessary adjustments and is responsible for the cost of additional compaction
tests until compaction per the specifications is met.
CLEARING AND GRUBBING
Clearing and Grubbing shall be performed in conformance with the provisions of Section
300-1 of the Standard Specifications and these Special Provisions.
The following is added to Section 300-1.2 Preservation of Property:
Modify and/or repair existing sprinklers in project area that are damaged due to the
Contractor's operation within 24 hours.
UNCLASSIFIED EXCAVATION
This section shall conform to Subsection 300-2 and 300-4 of the Standard Specifications
and these Special Provisions.
Unclassified excavation shall consist of all excavation including sawcutting and removal
of roadways, bituminous pavement, concrete pavement, pavement fabric, and the removal
of curbs, sidewalks, driveways, alleys, cross -gutters, earthwork, sod, etc. as shown on the
plans.
Any cores provided are included in the Appendix for reference purposes only and are not
part of the contract documents. The AGENCY will not be held responsible for existing
conditions that differ from any core logs that may be provided. It is the Contractor's option
to take his/her own core samples to verify the existing conditions.
25
CITY OF SANTA ANA
BID PROPOSAL
PROJECT NO.: 17-2674
CENTER STREET URBAN GREENING
TO: CITY COUNCIL OF TIE CITY OF AS�� ""I NT1A ANA
FROM: C.S. �l2e ce4 CorlSTTcfic''n, IYIG
I: • 1� 17T �I��I�Y�i
The undersigned bidder declares that they have carefully examined the location of the proposed
work, that they have examined the Contract Documents in its entirety and hereby proposes to
furnish all material and do all the work required to complete the said work in accordance with said
plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following
schedule:
BASE BID:
Item
Description
Qty
Unit
Unit Price
Amount
1
Unclassified Excavation
2,000
CY
$ l ►te
ISa,32o.c�
2
Clearing and Grubbing
1
LS
$
$
3
AC Pavement
6,200
SF
$ U. �o
$ 4a, Imo-cn
4
Striping P g
1
LS
$4,111-m
$4,Ill.rx>
5
Grant Signage
I
$t,348.c0
$ 1,34S,ap
6
Rough Grading
63,800
SF
$ o..-7ip
$ ys, 49s,co
7
PCC Curb and Gutter
255
LF
$ 33,co
$ $, Z.«o
8
PCC Cross Gutter
77
LF
$ yo.�
$3,080.cv
9
Parkway Culvert Drain
2
EA
$ 3,9 b .OD
$ -1, q30. co
10
Utility Adjustment to Grade
1
LS
$ SR b"74� CO
$ S, 10-74. CO
I1
4"PCC Sidewalk
1 560
SF
12
6"P1azaPaving (Type 1)
4,825
SF
$ 12.00
$ 5-7yO,00
P-1 ofP-19
CITY OF SANTA ANA
BIDPROPOSAL
PROJECT NO.: 17-2674
CENTER STREET URBAN GREENING
Item
Description
Qty
Unit
I Unit Price
Amount
13
6" Plaza Paving (Type 2)
1,895
SF
$ 3b. 60
$ too, 22-0.60
14
Interlocking Pavers
6,562
SF
$ 1-4-OD
$ II 9, I I b. oo
15
Pedestrian Bridge
540
SF
$ 3-7 66
$ I q aso. co
16
VegetatedBioswaleand
Bioretention Area with drainage
1
LS
111),98i
$.II(7 9gl �
17
Boulders A
17
$ --3 45- cb
$ 5, 6bS on
18
Boulders B
17
EA
$ 3,r2. cb
$ b, lsq.cz
19
Decomposed Granite
11,692
SF
$ 3. w
$ �351 6-7 t, . co
20
Metal Edging
1,515
LF
$ -7OD
$ 10, cooS. c�
21
6" Concrete Mow Curb
56
LF
$ 34 ob
$ I a o� co
22
Benches —4' `Vega"
6
EA
$
$ io�gc�y o0
23
Bollards - Fixed
7
EA
$ 1 S 30 ct
$ j 2 8 ) D-W
24
Bollards —Collapsible
5
EA
$ 22,444,
$ ,I I 2-2 0
25
Interpretive Sign
1
EA
$
oo
$ 4,321.00
26
Soil Amendments
115
Cy
$ 51
$ b, ASS oo
27
Fine grading
17,505
SF
$
6.zS
$
�, 37b.zS
28
Irrigation System
1
LS
$5fo,5(p2.cc$5p,5h2.m
29
Trees —15 gallon
29
EA
$ I
$
30
Shrubs — 5 gallon
253
EA
$
$ (0B rz
31
Shrubs —1 gallon
492
EA
$ I a6
$ b m ors
32
Grasses — 5 gallon
103
EA
$ zs �
$ 2, sus- w
P-2 ofP-19
CITY OF SANTA ANA
BID PROPOSAL
PROJECT NO.: 17-2674
CENTER STREET URBAN GREENING
Item
Description
Qty
Unit
Unit Price
Amount
33
Grasses - 1 gallon
1,139
EA
$
$
c0
15,94b.on
34
Hydroseeding - Biolfiltration Mix
4,465
SF
$
$
@801b/AC
o.-10
3, 1ZS. s6
35
Hydroseeding —BiofiltrationN&
3,535
SF
$
$
@161b/AC
6- 12
21 -G4 S. Zo
36
Hydroseeding - Aquawise
2,390
SF
$
$
G -9q
21 3EP (D. 10
37
Native Mow Free Fescue
1,000
SF
$
$
1 13
1 1 3D. C6
38
Turf
000
SF
$
$
�. i2
11008•cc
39
SWPPP (Erosivity
1
LS
$
$
Waiver)/Erosion Control
10, "Sm
Iq 1095: 60
40
Landscape & Irrigation 180-
1
LS
$
$
Calendar Day Maintenance Period
a
l, -1Cb 23.
14, -1 7-3. C6
As-Built Plans
1
LS
$
$
3, oFsB. 60
E42
3, 688.m
Labor Agreement Oversight
1
LS
$ 10,000
$ 10,000
TOTAL BASE BID $ d q ,0 -7 3.OS
ADD ALTERNATE BID 1:
Item
Description
Qty
Unit
Unit Price
Amount
43
Walkway Lighting - Light Pole
Standards
6
EA
$
bz 46. m
$
3 -7, 471o. cz
44
Walkway Lighting —Wiring
1,530
LF
$ 2�58
$ 3,g4-7.40
45
Walkway Lighting —Connection
1
LS
$
14, Ogs-.m
$14, 09 Sro
TOTAL ADD ALTERNATE BID 1
$ 55,
P-3 ofP-19
CITY OF SANTA ANA
BIDPROPOSAL
PROJECT NO.: 17-2674
CENTER STREET URBAN GREENING
ADD ALTERNATE BID 2:
Item
Description
Qty
Unit
Unit Price
Amount
46
Bench — 4' "Wave"
4
EA
$
Ib4�p.ab
$
Le, 5sq.co
47
Bike Rack
1
EA
$
363509
$
3thS.60
TOTAL ADD ALTERNATE BID 2
$ cl b 1 q a0
ADD ALTERNATE BID 3:
Item
Description
Qty
Unit
Unit Price
Amount
48
Raised Play Mounds with
concrete mow curb
3
EA
$
S
$
1 e, 050. o0
TOTAL ADD ALTERNATE BID 3
3 I e, 050' vo
ADD ALTERNATE BID 4:
Item
Description
Qty
Unit
Unit Price
Amount
49
Gabion Circular Seat
1
LS
$Ibi48D-oa
$1�,9Fso.cG
TOTAL ADD ALTERNATE BID 4
ADD ALTERNATE BID 5:
Item
Description
Qty
Unit
Unit Price
Amount
50
Concrete Block Bench Cluster
1
LS
$
2+, 1Ibw
$
2��� o.cy
TOTAL ADD ALTERNATE BID 5
$ 2 „ e
P-4 ofP-19
CITY OF SANTA ANA
BID PROPOSAL
PROJECT NO.: 17-2674
CENTER STREET URBAN GREENING
TOTAL BASE BID
S
c�c� p -1 3 . o.S
TOTAL ADD ALTERNATE BID 1
$
TOTAL ADD ALTERNATE BID 2
$
9 tDl 9 C0
TOTAL ADD ALTERNATE BID 3
$
1 tp OSO . c5b
TOTAL ADD ALTERNATE BID 4
$
I
TOTAL ADD ALTERNATE BID 5
$
The lowest respansible bidder shall be selected based on the total base bid. The City reserves the right to
award the Base Bid, and any, all, or none of the add-altemate bid items (if any).
The quantity for this bid item is shown for bid comparison only. This bid item shall not be subject to
the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual amount for this
item will be dictated by the actual quantity used, and the Agency reserves the right to increase or
decrease the quantity of this item accordingly.
TIME FOR COMPLETION OF RAPROVEMENTS AND LIOUIDATED DAMAGES
The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown above,
within sixty (60) working days after the commencement date stated in the Notice to Proceed.
The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard
Specifications, shall be $1,000 per calendar day.
The undersigned bidder hereby proposes to complete all requirements and items outlined in the most current
Construction General Permit, within sixty (60) working days after the date stated in the Notice of
Completion.
The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard
Specifications, shall be $1,000 per calendar day./
NameofFirm
Signature of BIDDER
-TYest5,u�t�.2r, {�nng(ha r
Title T Vr 61chnT (nr nDa Cir �v L
(If an individual, so state. If a fib'Jr co-partne ship, state the firm name and give the names of all
individual co partners composing the firm. If a corporation, state legal name of corporation, and names
of President, Secr Treasurer Manager, thereof.)
)`
P,i&hay l Gon7slUk ' S cfAak(
P-5 ofP-19
MY OF SANTA ANA
BID PROPOSAL
PROJECT NO.: 17-2674
CENTER STREET URBAN GREENING
BIDDER'S STATEMENT
BIDDER understands and agrees that this Bid Proposal, Contract Documents and subsequent
Construction Contract Agreement shall constitute the entire agreement between BIDDER and the
AGENCY only after it has been accepted by the City Council, endorsed by the Clerk of the Council
with her signature and official seal noting hereon the action of approval of the Council, signed by
the Public Works Agency Executive Director or his/her duly authorized agent, and signed by the
City Attorney, denoting his approval of the form of this document, and its execution, and when it
or an exact copy of it has been either delivered to BIDDER or deposited with the United States
Postal Service properly addressed to the BIDDER with the correct postage affixed thereto.
BIDDER further agrees that upon delivery (as defined above) of the accepted agreement he/she
will furnish AGENCY all required bonds and certificate of liability insurance within ten (10)
business days or the funds, check, draft, or BIDDERS bond substituted in lieu thereof
accompanying this proposal shall become the property of the AGENCY and shall be considered
as payment of damages due to the delay and other causes suffered by AGENCY because of the
failure to furnish the necessary bonds and because it is distinctly agreed that the proof of damages
actually suffered is difficult to ascertain; otherwise said funds, check, drafts, or BIDDER'S bond
substituted in lieu thereof shall be returned to the undersigned.
BIDDER understands that a bid is required for the entire work, the estimated quantities set forth
in the bid schedule are solely for the purpose of comparing bids, and that final compensation under
the contract will be based upon the actual quantities of work satisfactorily completed. The
BIDDER also certifies that the bid is a balanced bid.
In accordance with Section 7028.15 of the California Business and Professions Code, the
undersigned certifies under penalty of perjury that the foregoing is true and correct.
Name of Firm r_ S_ ton�.Lr., r'_��..--t.- i_.
Signature of BIDDER
Title V"slo-nfi, T-eA` - Zy- Mcrhgctaa- — Gr n
wa S . T e
(If an individual, so state. If a fin, or co -partnership, st to the firm nam give the nai es of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
P-6 of P-19
CITY OF SANTA ANA
BID PROPOSAL
PROJECT NO.: 17-2674
CENTER STREET URBAN GREENING
CONTRACTOR'S LICENSING AND REGISTRATION STATEMENT
The undersigned contractor, or corporate officer, declares under penalty of perjury that he/she and
all his/her subcontractors are registered with the State of California Department of Industrial
Relations (DIR), and that the following is true and correct.
Contractor's Name: G
Business Address: 1104 Uhi+ 6-. 5- GIVOv'e Prve. ph.}gtjp C=h-- 91-7to1
Business E-Mail Address:
Telephone: 90q ' S4d '2 (p2tp
State Contractor's License No. and Class: 2Lola 1 ®
License Expiration Date: 10
State Dept. of Industrial Relations (DIR)
Registration No.: p ®O �tq L)
State Dept. of Industrial Relations (DIR)
Registration Expiration) e+ W 130I yp
Signed:1�]
Title: 1'heSiY1N
P-7 of P-19
CITY OF SANTA ANA
BID PROPOSAL
PROJECT NO.: 17-2674
CENTER STREET URBAN GREENING
PREVAILING WAGE COMPLIANCE AND MONITORING STATEMENT
Contractor is aware of the requirements of California Labor Code Section 1720, et seq., as well as
California Code of Regulations, Title 8, Section 16,000, et seq., ("Prevailing Wage Laws"), which
require the payment of prevailing wage rates and the performance of other requirements on "public
works" and "maintenance" projects. Since the services are being performed as part of an applicable
"public works" or "maintenance" project, as defined by the Prevailing Wage Laws, and since the
total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing
Wage Laws.
City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at the
commencement of this Agreement. Contractor shall make copies of the prevailing rates of per
diem wages for each craft, classification or type of worker needed to execute the services available
to interested parties upon request, and shall post copies at the Contractor's principal place of
business and at the project site.
Contractor shall defend, indemnify and hold the City, its elected officials, officers, employees and
agents free and harmless from any claim or liability arising out of any failure or alleged failure to
comply with the Prevailing Wage Laws.
The undersigned certifies that the foregoing is true and correct.
Name of Firm C - 5 _ Ga11S d-n Inc..
Signature of BIDDER
Title �it¢Si ot1F —
(if an individual, so state)
P-8 ofP-19
CITY OF SANTA ANA
BID PROPOSAL
PROJECT NO.: 17-2674
CENTER STREET URBAN GREENING
OWNERSHIP AFFIDAVIT
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) SS:
CITY OF SANTA ANA )
being duly sworn, deposes and says:
i
❑ INDIVIDUAL That he/she is the party making the foregoing proposal:
❑ PARTNERSHIP That he/she is a member of the co -partnership firm designated as:
and who has been and is duly vested with the authority to make and execute instruments
for the co -partnership by:
who constitute the other members of the co -partnership.
CORPORATION That he is of
FYtesi d.ef1i
a corporation which is making the foregoing proposal:
❑ JOINT VENTURE That he is of.
one ofthe parties making the foregoing proposal as a joint venture, and the he/she has been
and is duly vested with the authority to execute instruments for an on behalf of the parties
making said bid who are:
that such a bid is genuine and not collusive or sham, and has not in any manner sought by collusion
to secure any advantagam t the City of Santa Ana or any person interested in the proposed
contract, for himself or e gAdAr person.
Signature of Bidder
Subscribed and sworn to
S-k,,li-tvp - presi
the this
Signature of officer Administering otary Public)
III
20
P-9 ofP-19
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual
who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
validity of that document.
State of California
County of SAN BERNARDINO
On MAY 16, 2019
before me, GLORIA MACIAS, NOTARY PUBLIC
(insert name and title of the officer)
personally appeared GREGG STRUMPF
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are
subscribed to the within instrument and acknowledged to me that he/she/they executed the same in
his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the
person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
GLORIA MACIAS
WITNESS my hand and official seal. Notary Public - California
I,\ " San Bernardino County
"# Comm issfon N 2284219
�- My Camm. Expires Apr 2, 2023
Signature 1'� v jol �� (Seal)
CITY OF SANTA ANA
BID PROPOSAL
PROJECT NO.: 17-2674
CENTER STREET URBAN GREENING
: �§
KNOW ALL PRESENT that,
C.S. Legacy Construction, Inc.
as BIDDER, and
GLeat Americatx insurance Co_ mpany � , as SURETY,
are held and firmly bou d unto the CITY OF SANTA ANA, as AGENCY, in the penal sum of
Ten percent of amount �rd _Dollars $ 10°h of amount bid p o—
( j, which is ten percent (10 /o)
of the total amount bid by BIDDER to AGENCY for the above -stated project, for the payment of
which sum, BIDDER and SURETY agree to be bound, jointly and severally, firmly by these
presents.
THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas BIDDER is about to
submit a bid to AGENCY for the above -stated project, if said bid is rejected, or if said bid is
accepted and a contract is awarded and entered into by BIDDER in the manner and time specified,
then this obligation shall be null and void, otherwise it shall remain in full force and effect in favor
of AGENCY.
IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seal this
1Oth day of May 20 19.
Construction,
By:
Gregg
sworn t o before me .� ******see attached acknowledgment
� this
Signature:
Notary Public in and for the County of
'nI .
'111;
, State of
* Provide BIDDER! SURETY name, address, and telephone number and the name, title, address,
and telephone number of authorized representative.
P-10 ofP-19
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual
who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
validity of that document.
State of Califomia
County of SAN BERNARDINO
On MAY 16, 2019
before me, GLORIA MACIAS, NOTARY PUBLIC
(insert name and title of the officer)
personally appeared GREGG STRUMPF
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are
subscribed to the within instrument and acknowledged to me that he/she/they executed the same in
his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the
person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of Califomia that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal. GLORIA MACIAS
Notary Public - California
San Bernardino County t
Commission M 228419
� My Comm. ExpiresApr 3, 3023
Signature (Seal)
A notary public or other officer completing this
certificate verifies only the identity of the individual
who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
validity of that document.
State of California
County of_ Orange )
On May 10, 2019 before me, Brandon K. Grindel, Notary
name and title of the officer)
personally appeared Kevin P. Reed, Attorney -in -Fact
who proved to me on the basis of satisfactory evidence to be the persons) whose name(s) is/are
subscribed to the within instrument and acknowledged to me that he/she/they executed the same in
his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the
person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and 9,fficlal Seal o RRANDON K. GRINREI
Notary Public - California z
- orange Coup 3;
/ Commission # 2Q43614
Signatur7 (Seal) Jun
My Comm. Expires Jun ig, 2022
GREAT AMERICAN INSURANCE COMPANY®
Administrative Office: 301 E 4TH STREET • CINCINNATI, OHIO 45202 • 513-369-5000 • FAX 513-723-2740
The number of persons authorized by
this power of attorney is not more than THREE
No.0 14866
POWER OFATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That the GREATAMERICAN INSURANCE COMPANY, a corporation organized and existing under
mid by virtue of the laws of the State of Ohio, does hereby nominate, constitute and appoint the person or persons named below, each individually if more than
one is maned, its true and lawful attomey-in-fact, for it and in its name, place mid stead to execute on behalf of the said Company, as surety, any and all bonds,
undertakings and contracts of suretyship, or other written obligations in the nature thereof, provided that the liability of the said Company on any such bond,
undertaking or contract of suretyship executed under this authority shall not exceed the limit stated below.. -
Name Address Limit of Power
KEVIN P. REED ALL OF ALL
MARCUS A. REED SANTA ANA, CALI FORN IA $100,000,000.00
JON ROSBURG
This Power ofAttorney revokes all previous powers issued on behalf of the attomey(s)-in-fact named above.
IN WITNESS WHEREOF the GREATAMERICAN INSURANCE COMPANY has caused these presents to be signed and attested by its appropriate
officers and its corporate seal hereunto affixed this 20TH day of MARCH 1 2O18
Attest GREATAMERICAN INSURANCE COMPANY
J Msu�
Assislnnt Senremry ~- Divisional Senior K. Przsid m
STATE OF OHIO, COUNTY OF HAMILTON - ss: DAVID C. KiTCHiN (877-377-2405)
On this 20TH day of MARCH 2O18 , before me personally appeared DAVID C. ICITCHIN, to me
(mown, being duly swum, deposes and says that he resides in Cincinnati, Ohio, that he is a Divisional Senior Vice President of the Bond Division of Great
American Insurance Company, the Company described in mid which executed the above instrument; that he knows the seal of the said Company; that the seal
affixed to the said instrument is such corporate seal; that it was so affixed by authority of his office under the By -Laws of said Company, and that he signed his
time thereto by like authority.
'
♦ /
��
•,
This Power ofAttomey is granted by authority of the following resolutions adopted by the Board of Directors of Great American Insurance Company
by unanimous written consent dated June 9, 2008.
RESOLVED: That the Divisional President, the several Divisional Senior Vice Presidents, Divisional Vice Presidents and Divisonal Assistant Nce
Presidents, a- any one of them, be and hereby is authorized, from titre to time, to appoint one or more Attorneys -in -Fact to execute on behalf of the Conrparry,
as surety, any and all bonds, undertakings and contracts ofsuretyship, or other written obligations in the nature thereof, to prescribe their respective ditties and
the respective lhnits of their authority; and to revoke arty such appointment at any tine.
RESOLVED FURTHER: That the Company seal and the signature of any of the aforesaid officers and any Secretary o- Assistant Secretary of the
Company may be i fixed by facsimile to atry power of attorney or certificate of either given for the execution of any bard, undertaking, contract of suretyship,
or other written obligation in the nature thereof, such signature and seal when so used being hereby adopted by the Company as the original signature of such
officer and the original seal of the Company, to be valid and binding upon the Company Ivan the some force and effect as though manually afned.
CERTIFICATION
I, STEPHEN C. BERAHA, Assistant Secretary of Great American Insurance Company, do hereby certify, that the foregoing Power Vf j+pVl `y mid
the Resolutions of the Board of Directors of June 9, 2008 have not been revoked and are now in full force and effect. t M D n :. -
Signed and sealed this
day of
Aasiamnr Secremry
S1029AF (06/15)
■■■■■■■
■ ■ MEMO
■MOO■■■■■
■MO■O■■OMO■
C.S. LEGACY
CONSTRUCTION. INC.
C.S. LEGACY CONSTRUCTION, INC.
MINUTES OF BOARD OF DIRECTORS MEETING
A SPECIAL MEETING OF THE BOARD OF DIRECTORS OF C.S. LEGACY CONSTRUCTION, INC, A
CALIFORNIA CORPORATION, WAS HELD AT 1704 UNIT B. S. GROVE AVE ONTARIO, CA 91761 ON
JANUARY 14, 2019.
THE BOARD OF DIRECTORS OF THE CORPORATION:
GREGG STRUMPF DIRECTOR
CONSTITUTING ALL OF THE MEMBERS OF THE BOARD OF DIRECTORS WERE PRESENT AT THE
MEETING.
THE MOTION WAS DULY MADE, SECONDED AND CARRIED THE FOLLOWING RESOLUTION
WAS ADOPTED:
RESOLVED, GREGG STRUMPF, PRESIDENT, IS SOLELY VESTED FULL AUTHORITY TO
SIGN ANY AND AN ALL CONTRACTUAL DOCUMENTS FOR THE CORPORATION, AND
THEREFORE HAS THE FULL AUTHORITY TO OBILIGATE THE CORPORATION IN ALL
CONTRACTURAL MATTERS.
THE UNDERSIGNED, RICHARD GONZALES, SECRETARY, CERTIFIED THAT GREGG STRUMPF IS
THE DULY APPOINTED PRESIDENT OF C.S. LEGACY CONSTRUCTION, INC. AND THAT THE
ABOVE IS A TRUE AND CORRECT COPY OF THE RESOLUTION DULY ADOPTED AT A MEETING
OF BYLAWS OF SAID CORPORATION ON JANUARY 14, 2019.
IN WITNESS THEREOF, I HAVE AFFIXED MY NAME AS SECRETARY OF THE CORPORATION,
AND HAVE ATTACHED THE SEAL OF C. S. LEGACY CONSTRUCTION, INC. TO THIS RESOLUTION.
DA JANUARY 14, 19
RICHARD GONZALES- SECRETARY
1704 Unit B S. Grove Ave Ontario, Ca 91761
(909)590-2626 (909)59014117 fax
CITY OF SANTA ANA
BID PROPOSAL
PROJECT NO.: 17-2674
CENTER STREET URBAN GREENING
LIST OF SUB -CONTRACTORS
Section 4100 et. seq. of the Public Contract Code requires listing of all subcontractors with the bid for all
subcontract work exceeding the following amount:
o Streets, highways including bridge projects: ''/z% of the bid or $10,000, whichever is greater
o Buildings, parks, or other projects: ''/z% of the bid
Section 1725.5 of the Public Contract Code requires all Subcontractors be registered with the State
Department of Industrial Relations (DIR).
BIDDER proposes to subcontract certain portions of the work to the firms listed below:
Name Ca*e
License #/Exp,
DIR Reg. #/Exp.
Location
Phone 11a
Type Of Work
Amount $
Name
License
DIR Reg
License
Location
Phone
Type Of
Amount'.
Name
License
DIR Reg
License
Location
Phone
Type Of
Amount $
Signature
5 UYve
111,
Name Precision Cold P)anirict. )rnc.
License #/Exp. g3� jo I 2g12-o
DIR Reg. #/Exp. I 0000a tp2LE4 b 1��L9
Location I5552 Wimesa fgvrl yucaiog {
Phone qaq - 444D • oo/ p
Type Of Work RQyYXOual s
Amount $ 4- 2.11 L000. on
Name F J er.nor &e)co EI tric - l a c
License #/Exp. -I3-,51p
DIRReg.#/Exp. 1a60004R04 b I» _
License# j3S5)B 7�` I9
Location Aloeng 11, ChIL4 Efiarllo
Phone qoR. gq_i•5�7o
Type Of Work E iricsxl
Amount $ 4 L4 � , 7tc to, co
Name
License #/Exp.
DIR Reg. #/Exp.
License #
cq Location
Phone
Type Of Work
Amount $
P-11 ofP-19
CITY OF SANTA ANA
BIDPROPOSAL
PROJECT NO.: 17-2674
CENTER STREET URBAN GREENING
LIST OF SUB -CONTRACTORS
Section 4100 et. seq. of the Public Contract Code requires listing of all subcontractors with the bid for all
subcontract work exceeding the following amount:
o Streets, highways including bridge projects: %% of the bid or $10,000, whichever is greater
o Buildings, parks, or other projects: ''/z% of the bid
Section 1725.5 of the Public Contract Code requires all Subcontractors be registered with the State
Department of Industrial Relations (DIR).
BIDDER proposes to subcontract certain portions of the work to the firms listed below:
Name
License #/Exp.
DIR Reg. #/Exp
Location
Phone
Type Of Work
Amount $
Name
License #/Exp.
DIR Reg. #/Exp.
License #
Location
Phone
Type Of Work
Amount $
Name
License #/Exp.
DIR Reg. #/Exp.
License # _
Location _
Phone
Type Of Work
Amount $
Signature
Name _
License #/Exp.
DIR Reg. #/Exp
Location
Phone
Type Of Work
Amount $
Name
License #/Exp.
DIR Reg. #/Exp.
License #
Location
Phone
Type Of Work
Amount $
Name
License #/Exp.
DIR Reg. #/Exp.
License #
Location
Phone
Type Of Work
Amount $
P-11 ofP-19
CITY OF SANTA ANA
BID PROPOSAL
PROJECT NO.: 17-2674
CENTER STREET URBAN GREENING
LIST OF SUB -CONTRACTORS
Section 4100 et. seq. of the Public Contract Code requires listing of all subcontractors with the bid for all
subcontract work exceeding the following amount:
o Streets, highways including bridge projects: '/2% of the bid or $10,000, whichever is greater
o Buildings, parks, or other projects: %:% of the bid
Section 1725.5 of the Public Contract Code requires all Subcontractors be registered with the State
Department of Industrial Relations (DIR).
BIDDER proposes to subcontract certain portions of the work to the firms listed below:
Name
License #/Exp.
DIR Reg. #/Exp
Location
Phone
Type Of Work
Amount $
Name
License #/Exp.
DIR Reg. #/Exp
License # _
Location _
Phone _
Type Of Work
Amount $
Name
License #/Exp.
DIR Reg. #/Exp.
License #
Location
Phone
Type Of Work
Amount $
Name _
License #/Exp.
DIR Reg. #/Exp
Location
Phone
Type Of Work
Amount $
Name
License #/Exp.
DIR Reg. #/Exp.
License #
Location
Phone
Type Of Work
Amount $
Name
License #/Exp.
DIR Reg. #/Exp.
License #
Location
Phone
Type Of Work
Amount $
Signature ofBidt 661
y f P fP& C�n j
P-11 ofP-19
CITY OF SANTA ANA
BID PROPOSAL
PROJECT NO.: 17-2674
CENTER STREET URBAN GREENING
REFERENCES
The following are the names, addresses, and telephone numbers for THREE public agencies for
which the BIDDER has performed similar work within the past three years.
1.
Name and Address of Owner.
Name and Telephone Number
Gfe.o-ena or-,
S56
4 3. 5q 2.1 11. M 7 -
Contract Amount Type of Wo k
2. r ., iil aF S-6h-6n - -78 D i4o-1711a Ave d--Ql
Name and Address of owner.
_ C-t w i l l erm o PR,ro 71' -- 3-1-'n z z
Name and Telephone Number of person familia with project.
li 11q� 6�2• �mG ViCL Can pv
Contract Amount Type of Wor�-
3.
Name dnd Address of owner.
Name and
4 9517,5>�P. 3257ffD
Contract Amount
C
--1 28
of person familiar with project.
sires 1
Type of Work
q 3il-1
3 ?-al
Date tompleted
g120)8
Date Completed
N.
LoI)-a,a
Date Completed
The following are the names, addresses, and telephone numbers of all brokers and sureties from
whom BIDDER intends to procure insurance and bonds.
F--Lh0-pMct h"• 5 u i )-e E. 6 ra
Zss -1 3 o- C'03c
P-12 ofP-19
CITY OF SANTA ANA
BID PROPOSAL
PROJECT NO.: 17-2674
CENTER STREET URBAN GREENING
ADDITIONAL REFERENCES
The following are the names, addresses, and telephone numbers for THREE public agencies for
which the BIDDER or Subcontractor has performed similar work in the past five years.
1.
01
3.
Address
Name and Telephone Nun
1.1241 see.M
Contract Amount
Address
— 5ns 5 -
or person familiar with project.
vanoys Pamir '- lrun
Type of Work
111,201-7
Date Completed
Name and Telephone Number of person familiar with project.
4 214-1' 4-1S-m pdY{c lnuj2- _ s1:1017
Contract Amount Type of Wok Date Completed
6 J GF Carona — 400 S. V A-veCeraha cP, 9 2ASz
Name afid Address of owner.
B-guIA C-1kA ew, - y ,K-1 • 739- °f9w1
Name and Telephone Number of person familiar with project.
Contract Amount Type of Work Date Completed
The following are the names, addresses, and telephone numbers of all brokers and sureties from
whom BIDDER intends to procure insurance and bonds.
5 3) � ��1vlG n ft✓y S o i f� �.
CJY—O 12C-k}- `7 2 S(P tp
85s. 13rP-c>a3o
P-13 ofP-19
i■i■i■■■■i■
C.S. LEGACY
CONSTRUCTION, IVC._
Please Reference Page P-13 of P-19
Paramount Blvd. Urban Renovations
City of Paramount
16400 Colorado Ave
Paramount, Ca 90723
Contact: Bill Paget
562-220-2108
Completed 8/2016
Original Contract $3,316,409.95
1704 S, Grove Avenue Unit B, Ontario, CA 91761
(909) 590-2626 (909)590-4117 Fax
CITY OF SANTA ANA
BID PROPOSAL
PROJECT NO.: 17-2674
CENTER STREET URBAN GREENING
NON -COLLUSION AFFIDAVIT
(Title 23 United States Code Section 112 and Public Contract Code Section 7106)
In conformance with Title 23 United States Code Section 112 and Public Contract Code 7106 the
BIDDER declares that the bid is not made in the interest of, or on behalf of, any undisclosed
person, partnership, company, association, organization, or corporation; that the bid is genuine and
not collusive or sham; that the BIDDER has not directly or indirectly induced or solicited any other
BIDDER to put in a false or sham bid, and has not directly or indirectly colluded, conspired,
connived, or agreed with any BIDDER or anyone else to put in a sham bid, or that anyone shall
refrain from bidding; that the BIDDER has not in any manner, directly or indirectly, sought by
agreement, communication, or conference with anyone to fix the bid price of the BIDDER or any
other BIDDER, or to fix any overhead, profit, or cost element of the bid price, or of that of any
other BIDDER, or to secure any advantage against the public body awarding the contract of anyone
interested in the proposed contract; that all statements contained in the bid are true; and, further,
that the BIDDER has not, directly or indirectly, submitted his or her bid price or any breakdown
thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will
not pay, any fee to any corporation, partnership, company association, organization, bid
depository, or to any member or agent thereof to effectuate a collusive or sham bid.
Note: The above Nc
that making a
Signed
State of California
County of
Subscribed and sworn to (or affirmed)
who appeared before me
Notary Public Signature
Affidavit is part of the Proposal. BIDDERS are cautioned
cation may subject the certifier to criminal prosecution.
"r-
proved to me on
me To day of 20_, by
bW
>orsatisfactory evidence to be the person(s)
Notary Public Seal
P-14 ofP-19
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual
who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
validity of that document.
State of California
County of SAN BERNARDINO
On MAY 16, 2019
before me, GLORIA MACIAS, NOTARY PUBLIC
(insert name and title of the officer)
personally appeared GREGG STRUMPF
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are
subscribed to the within instrument and acknowledged to me that he/she/they executed the same in
his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the
person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal. cLOR1A MACIAs
.a �� No[ary Pu61ic - California IL
San Bernardino County
'ye Commission A 2284219
My Comm. Expires Apr 2, 2023
Signature v / (Seal)
CITY OF SANTA ANA
BID PROPOSAL
PROJECT NO.: 17-2674
CENTER STREET URBAN GREENING
NON-DISCRIMINATION MTIUICALE
The undersigned contractor or corporate officer, during the performance of this contract, certifies
as follows:
The Contractor shall not discriminate against any employee or applicant for employment
because of race, color, religion, sex, or national origin. The Contractor shall take affirmative
action to ensure that applicants are employed, and that employees are treated during
employment without, regard to their race, color, religion, sex, or national origin. Such action
shall include, but not be limited to, the following: employment, upgrading, demotion, or
transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other
forms of compensation; and selection for training, including apprenticeship. The Contractor
agrees to post in conspicuous places, available to employees and applicants for employment,
notices to be provided setting forth the provisions of this nondiscrimination clause.
2. The Contractor shall, in all solicitations or advertisements for employees placed by or on behalf
of the Contractor, state that all qualified applicants will 'receive consideration for employment
without regard to race, color, religion, sex, or national origin.
3, The Contractor shall send to each labor union or representative of workers with which he/she
has a collective bargaining agreement or other contract or understanding, a notice to be
provided advising the said labor union or workers' representatives of the Contractor's
commitments under this section, and shall post copies of the notice in conspicuous places
available to employees and applicants for employment.
4. The Contractor shall comply with all provisions of Executive Order 11246 of September 24,
1965, and of the rules, regulations, and relevant orders of the Secretary of Labor.
5. The Contractor shall furnish all information and reports required by Executive Order 11246 of
September 24, 1965, and by rules, regulations, and orders of the Secretary ofLabor, or pursuant
thereto, and will permit access to his/her books, records, and accounts by the administering
agency and the Secretary of Labor for purposes of investigation, to ascertain compliance with
such rules, regulations, and orders.
6. In the event of the Contractor's non-compliance with the nondiscrimination clauses of this
contract or with any of the said rules, regulations, or orders, the contract may be canceled,
terminated, or suspended in whole or in part and the Contractor may be declared ineligible for
fiuther Government contracts or federally assisted construction contracts in accordance with
procedures authorized in Execution Order 11246 of September 24, 1965, and such other
sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of
September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or as otherwise
provided by law.
P-15 ofP-19
CITY OF SANTA ANA
BID PROPOSAL
PROJECT NO.: 17-2674
CENTER STREET URBAN GREENING
7. The Contractor shall include the portion of the sentence immediately preceding paragraph (1)
and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless
exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section
204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding
upon each subcontract or purchase order as the administering agency may direct as means of
enforcing such provisions, including sanctions for noncompliance; provided, however, that in
the event the Contractor becomes involved in, or is threatened with, litigation with a
subcontractor or vendor as a result of such direction by the administering agency, the
Contractor may request that the United States enter into such litigation to protect the interests
of the United States.
8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats. 1939, and as
amended, no discrimination shall be made in the employment of persons upon public works
because of race, religious creed, color, national origin, ancestry, physical handicaps, mental
condition, marital sta , or x of such persons, except as provided in Section 1420, and any
contractor of public wo s ating this Section is subject to all the penalties imposed for a
violation of the Chance �
Signed:
Title: PlnovGlQYl11 —
Firm: C" CS2:'r41UC4i& InC.
Date:
P-16 ofP-19
CITY OF SANTA ANA
BID PROPOSAL
PROJECT NO.: 17-2674
CENTER STREET URBAN GREENING
STATEMENT REGARDING APPRENTICESHIP REQUIREMENTS
The undersigned BIDDER is familiar with the requirements of Section 1777.5 of the State Labor
Code regarding employment of apprentices, and understands that contractors on contracts
exceeding $30,000 or 20 working days shall:
I. Apply to the joint apprenticeship committee administering the apprenticeship standards of the
craft or trade in the area of the site of the public work for a certificate approving the contractor
under the apprenticeship standards for the employment and training of apprentices in the area
or industry affected.
2. Employ the number of apprentices or the ratio of apprentices to journeymen stipulated in the
apprenticeship standards.
3. Contribute to the fund or funds in each craft or trade in which he/she employs journeymen or
apprentices on the public work, in the same amount or upon the same basis and in the same
manner as the other pOntractors, except contractors not signatory to the trust agreement shall
pay a like amount tofornia Apprenticeship Council.
Signed:
Title: pro- Mb of -
Firm: c , 5• Uooetrs i c-=n<JnA c7h cr), i ac
Date: 511 -1' l q
P-17 of P-19
CITY OF SANTA ANA
BID PROPOSAL
PROJECT NO.: 17-2674
CENTER STREET URBAN GREENING
STATEMENT REGARDING "ANTI -KICKBACK" REQUIREMENTS
The undersigned is submitting this proposal for performing by contract the work required by these
bid documents, agrees to comply with the Copeland "Anti -Kickback" Act (18 USC 74) as
supplemented in the Department of Labor regulations (29 CFR, Part 3). This act provides that
each contractor or subcontractor shall be prohibited from inducing, by any means, any person
employed in the construction or repai�of.public work, to give up any part of the compensation to
which he/she is otherwise entitled. // �� ��
Signed
Title: Fr'eSiG�2YT� �V Uniecr-er �UY.tk�F
Finn: L' .S LQ��EiCtl �S2fl���UC }7d11 �rie .
Date: S i 1-1119
P-18 ofP-19
CITY OF SANTA ANA
BID PROPOSAL
PROJECT NO.: 17-2674
CENTER STREET URBAN GREENING
2 LIC CONTRACT CODE SECTION 10162 . QUESTIONNAIRE
In conformance with Public Contract Code Section 10162, the BIDDER shall complete,
under penalty of perjury, the following questionnaire:
Has the BIDDER, any officer of the BIDDER, or any employee of the BIDDER who has a
proprietary interest in the BIDDER, ever been disqualified, removed, or otherwise prevented from
bidding on, or completing a federal, state, or local government project because of a violation of
law or a safety regulation?
Yes ,- No.
If the answer is yes, explain the circumstances in the following space.
Npr
P-19 ofP-19
REFERENCES
1. Eagle Glen Corner Drainage Improvements
Eagle Glen Apartments LLC
c/o Mr. Michael S. Aimola
J & M Realty Company
1651 E. Fourth St. Suite 250
Santa Ana, Ca. 92701
(714)285-1170
(714) 285-1178 FAX
Completed March, 2004, $56,000.00
2. Santa Ana Zoo DG
Howard S. Wright Construction
Mr. Greg Ahman
18500 Von Karman Ave. Suite 420
Irvine, Ca. 92012
(949) 567-1909
(949) 567-1917 FAX
Completed April, 2004 $52,000.00
3. Canada Vista Park Parking Lot Expansion
City of Rancho Santa Margarita
Jacque Niemi
30211 Avenida de las Banderas Suite 101
Rancho Santa Margarita, Ca. 92688
(949) 635-1800
(949) 635-1840 FAX
Completed May, 2004 S351,577.49
4. Crown Valley Park Synthetic Soccer Field
City of Laguna Niguel
Nicholas Renn
27911 La Paz Road
Laguna Niguel, Ca. 92677
(949)362-4341
(949) 362-4385 FAX
Completed June 2004 $539,217.49
Freeman, Bell, & Thornburg Park Playground Renovation
City of Gardena
Dave Negrete
P.O. Box 47003
Gardena, Ca. 90247
(31.0) 217-9500
(31.0)217-9876
Completed June 2004 $355,069.90
6. Delta Plant Fencing & Landscaping
City of Monterey Park
Mr. Elias Saykali
320 W. Newmark Ave.
Monterey Park, Ca. 91754
(626)307-1320
(626) 307-2500 FAX
Completed July 2004 $120,580.00
7. Eagle Glen Street Improvements
Eagle Glen Apartments, LLC
c/o Mr. Michael S. Aimola
J & M Realty Co.
1651 E. Fourth St. Suite 250
Santa Ana, Ca. 92701
(714) 285-1170
(714) 285-1178
Completed July 2004 $153,250.00
8. Ayala Park Temporary Parking Lot
City of Chino
Carolyn Baltzer, Asst. Project Coordinator
P.O. Box 667
Chino, Ca. 91708
(909) 627-7577
(909) 464-0799 FAX
Completed 9/04 $95,730.00
9. Site Prep for 2 Relocatables @ New Ventures
Huntington Beach Union High School District
Nelson M. Cayabyab Director of Facilities
10251 Yorktown Ave.
Huntington Beach, Ca. 92646
(714)964-3339
(714) 963-7684 FAX
Completed 9/04 $227,455.00
DSA Inspected
10. SR 79S Sidewalk Improvement Project
City of Temecula
Avlin R. Odviar Asst. Engineer
P.O. Box 9033
Temecula, Ca. 92589
(951) 694-6411
(951) 693-3929 FAX
Completed 9/04 $147,328.00
11. Lincoln Ave. Median Landscape Improvements
City of Buena Park
Wood Nousome Asst. Engineer
P.O. Box 5009
Buena Park, Ca. 90622
(714) 562-3676
(714) 562-3677 FAX
Completed 6/05 $816,000.00
12. Floe Packer Landscape Improvement
City of Lake Forest
Steve Velasco, Engineer
(949) 461-3480
(949) 461-3511 FAX
25550 Commercentre Drive
Lake Forest, Ca. 92630
Completed 5/05 $91,974.32
13. Replacement of Lang Park Play Equipment
City of Laguna Beach
Derek Wieske, Asst. City Engineer
505 Forest Ave.
Laguna Beach, Ca. 92651
(949) 497-3311
(949) 497-0771 FAX
Completed 1105 $182,299.00
14. Edison High School SAC Addition
1.5. Huntington Beach High School Elevators
Huntington Beach Union High School District
10251 Yorktown
Huntington Beach, Ca. 92646
Nelson Cayabyab Director of Facilities
(714) 964-3339
(714) 963-7684 FAX
Edison High School Completed 5105 $391,576.42
Huntington Beach Elevators Completed 05/06 $780,956.00
16. Talega Recreation Center Phase 3
Talega Partners
951 Calle Negocio Suites D
San Clemente, Ca. 92673
Charlie Mallon Project Manager
(949) 498-1366
(949) 369-7659
Complete 6/05 $490,679.55
17. Rancho San Jacinto Play Areas Imp.
City of San Jacinto
201 East Main St.
San Jacinto, Ca. 92583
Ray Sanchez / Pam Stull
(951)487-7342
(951) 654-3728 FAX
Completed 3/05 $294,836.00
18. Shady Grove Park
City of ('rhino
13220 Central Avenue
Chino, CA 91708-0667
Mike Knolling
(909)464-0768
(909) 464-0799 FAX
Completed 10/05 $1,344,705.00
19.Pinacate Middle School
Perris Union High School District
155 East Fourt Street
Perris, Ca 92570
Jeremy Chou
(909) 987-0909
Completed 2005 $298,182.00
DSA Inspected
20.Monte Vista Splashpad
City of Chino
P.O. Box 667
Chino, Ca 91708
Arlene Salazar
(909) 464-0770
(909) 590-5581 Fax
Completed 4/06 $227,187.12
21.Playgroand Retrofit
City of Chino
13220 Central Ave.
Chino, CA 91708-0667
Carolyn Baltzer
(909) 627-7577
(909) 464-0799 FAX
Completed 12/05 $285,965.00
22.Starshine Park
City of Diamond Bar
21825 Copley Drive
Diamond Bar, CA 91765-4177
Ryan Wright
(909) 839-7072
(909) 861-3117 FAX
Completed 06/05 $269,337.00
23.Sycamore Canyon Park
City of Diamond Bar
21825 Copley Drive
Diamond Bar, CA 91765-4177
Ryan Wright
(909) 839-7072
(909) 861-3117 FAX
Est. Completion 01/06 $462,373.52
24. Rancho San Jacinto Basins
City of San Jacinto
201 East Main St.
San Jacinto, Ca. 92583
Ray Sanchez / Pam Stull
(951)487-7342
(951) 654-3728 FAX
Completed 07/05 $868,589.12
25.Child Development Center Playground
Santa Monica -Malibu Unified School District
1651 Sixteenth Street
Santa Monica, CA 90404
J. Wallance Berriman
(310) 450-8338
(310) 450-1667 FAX
Completed 08/05 $359,551.76
26.Granada Streetscape
City of San Clemente
910 Calle Negocio Ste. 100
San Clemente, CA 92673
Gary Voborsky
(949)361-6100
(949) 361-8316 FAX
Completed 12/05 $197,245.91
27.Victoria Gardens Lane Median
City of Rancho Cucamonga
10500 Civic Center Drive
Rancho Cucamonga, CA 91729-0807
Jerry Dyer
(909) 477-2700
(909) 477-2849 FAX
Completed 12/05 $155,482.00
28.MM O'Neil Park
City of Mission Viejo
200 Civic Center
Mission Viejo, CA 92691
Keith Rattay
(949) 470-3000
(949) 581-0983 FAX
$718,029.96
29.ATL Building Irrigation & Landscape
Chaffey College
5885 Haven Ave.
Rancho Cucamonga, CA 91737
Sarah Riley
(909) 477-8547
(909) 477-8571 FAX
Completed 05106 $286,910.61
30. YMCA Daycare Center
City of Mission Viejo
200 Civic Center
Mission Viejo, CA 92691
Jerry Hill
(949) 470-3052
(949) 581-0983 FAX
Completed 04/06 $239,542.00
31.Grass Playfields
Long Beach Community College
4901 E. Carson Street
Long Beach, CA 90808
Sandy Mathis
(562) 938-4111
(562) 938-4118 FAX
Completed 05/06 $520,247.88
32.La Habra Landscape & Electrical
City of La Habra
201 E. La Habra Blvd.
La Habra, CA 90631
Contact: Sam Makar
(562)905-9720
(562) 905-9643 FAX
Completed O1/06 $862,344.87
33.Vucca Park
City of Los Angeles
200 N. Spring Street
Los Angeles, CA 90012
Contact: Richard Chang
(213) 978-1912
(213) 978-1901 Fax
Completed 10/06 $574,960.24
34. Fullerton High School Landscape
35.Fullerton High School Site Work
Erickson -Hall Construction Co.
1021 W. Bastanchury #110
Fullerton, CA 92833
Contact: Santosh Mhapsekar
(714) 738-4995
(714) 738-5194 Fax
Fullerton High School Landscape Completed 03/06 $113,051.00
Fullerton High School Site Work Completed 03/06 $239,422.00
36.Sidewalk, Curb & Gutter
City of Newport Beach
3300 Newport Blvd.
Newport Beach, CA 92663-3884
Contact: Frank Tran
(949) 644-3340
(949) 644-3308 Fax
Completed 05/06 $595,341.00
37.Brea Blvd. Median Landscape
City of Brea
1 Civic Center Circle
Brea, CA 92821
Contact: Raul Lising
(714) 671-4450
(714) 990-2258 Fax
Completed 08/06 $1,344,650.00
38.Villegas Park Improvements
39.Monroe Street Wall
40.Sidewalk Curb & Gutter
City of Riverside
3900 Main Street
Riverside, CA 92522
Contact: Daniel J. Simmons
(951) 826-5591
(951)826-5542 Fax
Villegas Park Imp. Completed 2006 $306,523.00
Monroe Street Wall Completed 10/2006 $200,679.00
Sidewalk Curb & Gutter Completed 10/2006 $948,142.00
41.West Chapman Ave. Parking Lot Expansion
City of Fullerton
303 West Commonwealth Ave,
Fullerton, CA 92832-1775
Contact: Mehrdad Miralaie
(714) 738-6866
(714) 738-3115 Fax
Completed 2006 $353,903.0
42.Teen Square Improvements
City of Lynwood
11330 Bullis Road
Lynwood, CA 90262
Contact: Jorge Roque
(310) 603-0220
(310) 635-0493 Fax
Completed 10/06 $470,047.00
43.Harbor Hills Community Center
Community Development Commission of LA County
4800 E. Cesar E Chavez Ave.
Los Angeles, CA 90022
Contact: Bill Yee
(323)260-3412
(323) 266-5930 Fax
Completed 09/06 $209,034.00
44.Patricia Lane Park Improvements
City of Santa Ana
20 Civic Center Plaza M-22
Santa Ana, CA 92702
Contact: Ed Torres
(714) 647-5018
(714) 647-5058 Fax
Completed: 10/06 $456,181.00
45.La Palma Play Area Rehabilitation
City of La Palma
7822 Walker Street
La Palma, CA 90623-1771
Contact: Ismile Noorbaksh
(714) 690-3310
(714) 523-2141 Fax
Completed: 10/06 $245,372.00
46.Freeway Beautification
City of Riverside
3900 Main Street
Riverside, CA 92522
Contact: Daniel J. Simmons
(951) 826-5591
(951) 826-5542 Fax
Completed 09/06 $245,685.00
47.Veterans Memorial
City of Paramount
16400 Colorado Ave.
Paramount, CA 90723-5012
Contact: Jack Perich
(562)220-2000
(562) 630-6731 Fax
Completed 10/06 $995,680.77
48.Ray Moore Stadium Improvements
CAL K-12
32598 Oak Glen Road
Yucaipa, CA 92399
Contact: Nolan Ballard
(909)795-9169
(909) 795-9432 Fax
Completed 09/06 $594,464.00
49.Fountain Valley Sidewalks
City of Fountain Valley
10200 Slater Ave.
Fountain Valley, CA 92708
Contact: Harry Drake
(714) 593-4606
(714) 593-4494 Fax
Completed 09/06 $150,230.00
50.Civic Center Hardscape
City of Apple Valley
14955 Dale Evans Parkway
Apple Valley, Ca 92307
Contact: Gina Whiteside
(760)240-7000
Completed 02/07 $698,802.96
51.Mpower Parking Lot
City of Bellflower
16600 Civic Center Drive
Bellflower, Ca 90706
Contact: Paul Zweip
(562) 804-1424
(562)925-8660
Completed 01/07 $317,361.06
52.Loma Linda Tennis Courts
City of Loma Linda
25541 Barton Road
Loma Linda, Ca 92354
Contact: Eleazar Alex Rubalcava
(909) 799-2800
(909)799-2890 Fax
Completed 12/06 $351,278.42
53.Adelanto Road Imp.
City of Adelanto
11600 Airbase Road
Adelanto, Ca 92301
Contact: Wilson So
(760)246-2300
Completed 11/06 $967,788.90
54.Perris Blvd. Median
City of Moreno Valley
14177 Frederick Street
Moreno Valley
Contact: Ben Rahimian
(951)413-3130
(951)413-3170 Fax
Completed 12/06 $96,967.05
55.1lighland Sidewalks
City of Highland
7231 Boulder Avenue #531
Highland, Ca 92346
Contact: John G. Egan
(909) 748-0010
(909) 748-0016 Fax
Completed 01/07 $283,989,03
56.Lincoln St. Park
City of Lake Elsinore
130 S Main St.
Lake Elsinore, Ca 92530
Dave Solomon
(951) 674-87-61
(951) 674-3124 Fax
Completed 3/07 $769,634.40
57.Shirpser Elementary School
El Monte City School District.
3540 N. Lexington Ave.
El Monte, Ca 91731
Contact: Lila Hoverman
(909) 305-2332
(909) 305-2180
Completed 03/07 $160,391.68
58.Mistletoe Park Imp.
City of San Jacinto
248 E. Street
San Jacinto, Ca 92583
Contact: Mike Emberton
(951) 654-4041
(951) 487-7382
Completed 02/07 $220,966.60
59.Allendale Park
City of Pasadena
100 N. Garfield Ave.
Pasadena, Ca 91105
Contact: Alba Iralieta
(626) 744-4124
Completed 02/07 $278,093.32
60.Ramsey Street Medians
City of Banning
99 E. Ramsey Street
Banning, Ca 92220
Contact: Arturo Vela
(951) 922-3130
(909) 922-3141 Fax
Completed 05/07 $914,522.00
61.Boeing St.
City of Moreno Valley
14177 Frederick Street
Moreno Valley, Ca 92552
Contact: Christopher L. Wiberg
(951) 413-3135
(951) 413-3170 Fax
Completed 02/07 $281,834.81
62.Alicia Parkway Medians
City of Laguna Hills
24035 El Toro Road
Laguna Hills, Ca 92653
Contact: Kenneth Rosefield
(949)707-2650
(949) 707-2633
Completed 05/07 $434,021.89
63.Cesar Chavez Park Imp.
City of South Gate
8650 California Avenue
South Gate, Ca 90280
Contact: Adel Freij Willdan
(323)357-9657
(323)563-9572 Fax
Completed 05/07 $1,503,328.08
64.Chino Concrete Repair
City of Chino
13220 Central Avenue
Chino, Ca 91710
Contact: Jerry Perez
(909)627-7577
(909) 591-6829 Fax
Completed 06/07 $362,006.00
65.Chapman Ave. Streetseape
City of Stanton
7800 Katella Ave
Stanton, Ca 90680
Contact: Patricia A. Simpson
(714) 379-9222
(714) 890-3123 Fax
Completed July 2007 $905,490.50
66.Imperial Highway
County of Los Angeles
900 South Fremont Avenue
Alhambra, Ca 91803
Contact: Hector Hernandez
(626) 458-5100
Completed June 2007 $333,355.35
67.Fairplex Park & Ride
County of Los Angeles
900 South Fremont Avenue
Alhambra, Ca 91803
Contact: Jose Pon
(626) 458-5100
Completed 2007
68.Holifield Park
City of Norwalk
127000 Norwalk Blvd.
PO Box 1030
Norwalk, Ca 90651
Contact: Brenda L. De Jager
(562) 929-5700
(562) 929-5773 Fax
$96,987.50
69.Veterans Park Walkway
City of Yorba Linda
4845 Casa Loma Ave.
P.O. Box 87014
Yorba Linda, Ca 92885
Contact: Steve Campbell
(714) 961-7100
Completed 04/07 $139,643.00
70.Foothill Blvd. Medians
Lewis Operating Corporation
1156 North Mountain Ave.
P.O. Box 670
Upland, Ca 91785
Contact: Stacy Lin
(909) 985-0971
Completed 05/07 $166,373.29
71.Foothill Blvd. Perimeter
Lewis Operating Corporation
1156 North Mountain Ave.
P.O. Box 670
Upland, Ca 91785
Contact: Stacy Lin
(909) 985-0971
Completed 05/07 $475,333.22
72.Chino Hills Pkwy Monument
City of Chino Hills
2001 Grand Avenue
Chino Hills, Ca 91709
Contact: Anne Dutrey
(909)364-2760
(909) 364-2791 Fax
Completed 4/07 $300,175.00
73.Civic Center Park Landscape
City of Apple Valley
14955 Dale Evans Parkway
Apple Valley, Ca 92307
Contact: Gina Whiteside
(760)240-7000
Completed 08/07 $534,283.01
74.Friendship Park
City of Bellflower
16600 Civic Center Drive
Bellflower, Ca 90706
Contact: Paul Zweip
(562) 804-1424 Ext.2250
(562) 804-4465 Fax
Completed 11/07 $919,500.00
75.Kessler Park
County of San Bomardinol57 W. 5'h Street
San Bernardino, Ca 92415
Contact: Greg Bacon
(909)387-6076
(909) 397-5968
Completed 9/07 $456,152.00
76.Barstow High School Landscape
City of Barstow
551 South Avenue H
Barstow, Ca 92311
Contact: Steve Prince
Phone: (909) 989-9979
Completed 08/07 $326,412.00
77,Laguna Niguel Amphitheater
City of Laguna Niguel
27791 La Paz Road
Laguna Niguel, Ca 92677
Contact: Nicholas Reno
(949)362-43414
Completed 5/07 $157,900.00
78.Valley High School
PCM3
1801 S. Greenville Street
Santa Ana, Ca 92704
Contact: Pamela Goodrich
(714) 662-0227
(714)662-0233Fax
Completed 10/07 $234,830.00
79.Chapman Ave and Katella Ave Streetscape
City of Stanton
7800 Katella Ave
Stanton, Ca 90680
Contact: Sean Crumby
(714) 379-9222 Ext. 204
(714)890-3123 Fax
Completed July 2007 $905,480.50
80.Cerritos Ave Streetseape
City of Stanton
7800 Katella Avenue
Stanton, Ca 90680
Contact: Sean Crumby
(714) 379-9222 Ext.204
Completed 9/07 $1,059,468.62
81.Rivera Park
City of Pico Rivera
6767 Passons Blvd.
Pico Rivera, Ca 90660
Contact: Jose Rico
(562)802-4432
Completed 8/07 $237,592.00
82..San Gabriel Blvd
City of San Gabriel
425 S. Mission Drive
San Gabriel, Ca 91776
Contact: Mark Moreno
(714)293-0278
(714)973-2263 Fax
Completed 11/08 $228,927.00
83..Tree Removal and Sidewalk
City of Bellflower
16600 Civic Center Drive
Bellflower, Ca 90706
Contact: Paul Zwiep
(562)804-1421 Ext.2250
(562) 804-4465 Fax
Completed 6/07 $183,182.00
84.Grace Street Reconstruction
City of Barstow
220East Mountain View Street
Barstow, Ca 92311
Contact:William Henderson
(760)255-5157
(760) 760-256-1750 Fax
Completed 6/07 $297,741.00
85.Recreation Trail Improvements
City of Villa Park
17855 Santiago Blvd
Villa Park, Ca 92861
Contract: Blane Frandsen
(714)973-2230
Completed 9/07 $144,242.32
86.Veterans Memorial Park
City of Stanton
7800 Katella Avenue
Stanton, Ca 90680
Contact: Sean Cramby
(714) 379-9222 Ext. 204
Completed 12/07 $1,096,382.35
87.Santa Fe High School
Whittier Unified School District
9401 S. Painter Ave.
Whittier, Ca 90605
Contact: Dan Romo
(562) 698-8121
(562)693-5371
Completed 10/07 $349,309.00
DSA Inspected
88.Curbs, Gutters & Sidewalks
City of El Segundo
350 Main Street
El Segundo, Ca 90245
Contract: Maryam Jones
(310)524-2361
Completed 9/07 $182,201.00
89.Yucca Park
City of Indio
100 Civic Center Mall
Indio, Ca 92201
Contact: Connie Allen
(760)391-4005
Completed 03/08 $1,044,965.00
90.Foglesong Park
City of Barstow
220 East Mountain View Street
Barstow, Ca 92311
Contact: Jeanette Hayhurst
(760)255-5146
(760) 760-256-5621
Completed 02/08 $381,825.00
Percent Completed 100%
91.Las Flores Park
City of Malibu
23815 Stuart Ranch Road
Malibu, Ca 90265
Contact: Arthur Aladjadjian
(310) 456-2489
(310) 456-3356 Fax
Completed 09/08 2,040,673.00
92.Imperial Median
City of La Mirada
13700 La Mirada Blvd.
La Mirada, Ca 90638
Contact: Steve Forster
(562)902-2371
Completed 12/07 $990,381.00
93.Rialto Concirete
City of Rialto
150 South Palm Ave.
Rialto, Ca 92376
Contact: Naddem Syes
(909) 421-4986
(909) 421-7210 Fax
Completed 11/07 $170,701.00
94.UCR Parking Lot
The Regents of The University of California
3615A Canyon Crest Drive
Riverside, Ca 92507
Contact: John A. Friedrach
(951) 781-0811
(951) 781-8435 Fax
Completed 12/07 $357,924.00
95.Serrano Creek Play Structure
City of Lake Forest
25550 Commercentre Dr.
Lake Forest, Ca 92630
Contact: Jesse Caballero
(949) 855-5764
(949) 855-7050 Fax
Completed 12/07 $417,545.32
96.Azusa Ave. Medians
City of West Covina
1444 West Garvey Ave,
West Covina, Ca 91793
Contact: Sam Guitierrez
(626) 939-8734
(626)939-8660 Fax
Completed 12/07 $325,320.00
97.Thompson Basketball Park
City of Oxnard
305 West Third Street
Oxnard, Ca 93030
Contact:Patricia C. Friend
(805) 385-7821
(805)805-385-8329 Fax
Completed 11/07 $200,462.85
98.College Park
City of Oxnard
1060 Pacific Avenue. Building 2
Oxnard, Ca 93030
Contact: Patricia C. Friend
(805)385-7821
(805)385-8329 Fax
Completed 4/08 2,343,473.50
99.Warner Basin
City of Anaheim
200 S. Anaheim Blvd. Suite 276
Anaheim, Ca 92805
Contact: Caster D. Williams
(714) 765-5176
(714) 765-5225 Fax
Completed 3/08 166,199.00
100.Dog Park
City of Culver City
9770 Culver Blvd.
Culver City, Ca 90232
Contact: Hong Wang
(310) 253-5604
(310) 253-5626 Fax
Completed 3/08 $123,102.00
101.Maxwell Park Renovation
City of Anaheim
200 S. Anaheim, Ca 92805
Contact: Robert Palaeologus
(714) 765-5175 Ext 5711
Completed 11/08 $1,669,901.50
102.Whittier High School Quad
Whittier Union High School District
9401 So. Painter Ave.
Whittier, Ca 90605
Contact: Doug Orndorff
(562) 698-8121 Ext 1537
Completed 08/2008 $1,009,783.00
103.Meadows Park
City of Lynwood
11330 Bullis Road
Lynwood, Ca 90262
Contact: Arsenio Frontela
(310)603-0220
(310) 635-0493
Completed 9/08 $1,473,593.20
104.Hesperia Civic Plaza
City of Hesperia
9700 Seventh Ave.
Hesperia, Ca 92345
Contact: David R. Burkett
(760) 947-1202
Completed 9/2008 $3,500,000.00
105.PCH Roadway Improvements
City of Dana Pont
33282 Golden Lantern
Dana Point, Ca 92629
Contact: Todd Niemann
(949) 213-4231
Completed 09/2008 $712,343.30
106.Dateland Park
City of Coachela
1515 Sixth Street
Coachella, Ca 92236
Contact: Mark Chappell
(760) 398-5744
(760) 398-1630
Completed 10/2008 $1,679,765.61
107.Thornton & Windsor Parks
City of Santa Ana
P.O. Box 1988
Santa Ana, Ca 92702
Contact:William Albright
(714)647-5029
Completed 9/2008 $331,240.00
108. Dotson Park
City of Stanton
7800 Katella Avenue
Stanton, Ca 90680
Contact: Sean Crumby
(714) 379-9222 Ext. 204
Completed 12/08 $1,866,279.00
109.Garcia Park
City of Rancho Cucamonga
10500 Civic Center Dr.
Rancho Cucamonga, Ca 91729
Contact: Karen Emery Mcguire
(909) 477-2740 Ext. 4080
(909) 477-2746 Fax
Completed 09/08 $1,831,717.25
110.Estudillo Parking Lot
City of San Jacinto
595 S. San Jacinto Ave
San Jacinto, Ca 92583
Contact: Holly Binkley
(951) 654-3592
(951) 651-3672
Completed 8/08 $215,783.00
ItI.Memorial Park Walkway & Walkway Lighting
City of Pasadena
100 North Garfield Ave
Pasadena, Ca 91109
Contact: Reny Q. Quijano
(626) 744-6741
(626) 744-3892
Completed 09/2008 $130,000.00
112.Oak Glen Park Improvements
County of San Bernardino
157 West Fifth Street
San Bernardino, Ca 92415
Contact: Greg Bacon
(909) 387-5940
(909) 387-5968
Completed 2008
Original Contract $911,488.00
113.Westmister H.S. Parking Lot
Huntington Beach U.H.S.D
5832 Bolsa Ave.,
Huntington Beach, Ca 92646
Contact: Celia Taylor
(714) 903-7000
(714)372-8105
Completed 01/09 $854,832.00
114.1000 Palms Community Park
Riverside County Redevelopment
C/O Ian Davison Landscape Architecture, Inc.
3744 Tenth St. Suite 200
Riverside, Ca 92501
Contract: Ian Davison
(951) 683-1282
(951) 683-4352
Completed 12/08 $ 775,000.00
115.Centennial H.S. Softball Park
Compton U.S.D
C/O DelTerra
13181 Crossroads Pkwy North Ste. 200
City of Industry, CA 91746
Contact: Lisa Estrada
(626) 839-9300
(626) 592-3595
Completed 11/08 $310,000.00
116.Moorpark College Walkway
Ventura Community College
C/O Beery
103 Durley Avenue
Camarillo, Ca 93010
Contact: Dick Jones
(805) 384-8152
(805)384-8155
Completed 12/08 $359,956.00
117.Sky Water Trail Sidewalk
City of Cathedral City
68-700 Avenida Lalo Guerrero
Cathedral City, CA 92234
Contact: Mitchell J. Nieman
(760) 770-0348
(760)202-1460
Completed 10/08 $143,021.00
118.Playfield Expansion
Pomona Unified School District
800 S. Garey Ave
Pomona, Ca 91766
Contact: Ava Hill
(909)397-4800
(909)397-5050
Completed 11/2008 Original Contract $257,205.00
119.Banning Parking Lot
City of Banning
99 E. Ramsey Street
Banning, Ca 92220
Contact: Holly Stuart
(951) 922-3138
(951) 922-3141
Completed 12/08 $961,941.00
120.Ball Jr. High Concrete
Anaheim Unified School District
501 Crescent Way
Anaheim, Ca 92803
Contact: Ralph Figueroa
(714) 999-2188
(714) 520-5741
Completed 8/2008 $198,698.00
121. Slauson Ave Median
Los Angeles County
900 South Fremont Ave 8'h Floor
Alhambra, Ca 91803
Contact: Irma V. Serna
(626)458-4951
(626) 458-2197
Completed 08/2008 $ 698,729.00
122.Cypress St. Improvement
City of Highland
27215 Base Line
Highland, Ca 92346
Contact: Etta R. Pulce
(909) 890-1255
(909) 890-0995
Completed 09/09 Original Contract $437,389.00
123. Huntington Beach HS Tennis Courts
Huntington Beach
Union High School District
5832 Bolsa Ave
Huntington Beach, Ca 92649
Contact: Celia Taylor
(714) 903-7000
(714) 372-8105
Completed 03/2009 $1,475,370.00
124. Downtown Infrastructure
City of Indio
100 Civic Center Mall
Indio, Ca 92201
Contact: Mariano Aguire
(760) 541-4230
(760)391-4021
Completed 09/2009 $3,550,000.00
125.Soecer Field
Beverly Hills Unified School District
255 S. Lasky Drive
Beverly Hills, Ca 90212
Contact: Arturo Arce
(310) 550-8049
(310) 551-0287
Completed 05/2009$363,935.00
126.Community Services Parking Lot
City of Westminster
8200 Westminster Boulevard
Westminster, Ca 92683
Contact: Jake Ngo
(714) 898-3311
(714) 895-4499
Completed 10/09 Original Contract $237,314.00
127.Veterans Park Sports
City of Colton
650 N. La Cadena Dr
Colton, Ca 92324
Contact: Thomas I Williams
(909)370-5099
Completed 11/2009 $3,046,000.00
128. South Laguna Streetseape
City of Laguna Beach
505 Forest Ave
Laguna Beach, Ca 92651
Contact: Lisa M. Perna
(949) 497-0792
Completed 11/2009 $848,282.00
129. Challenger Youth Center
County of Los Angeles
900 South Fremont Avenue
Alhambra, Ca 91803
Contact: Brian Soria
(626)459-5100
Completed 06/09 Original Contract $101,294.00
130. Tierra Bonita Park
City of Lancaster
44933 Fern Avenue
Lancaster, Ca 93534
Contact: Jon H Manager
(661) 723-6000
Completed 07/09 Original Contract $101,294.00
131. Marina High School Courts
Huntington Beach U.H.S.D
5832 Bolsa Ave
Huntington Beach, Ca 92649
Contact: Celia Taylor
(714) 903-7000
Completed 10/2009 $1,268,639.00
132.Thundersky Park
City of Riverside
3900 Main Street
Riverside, Ca 92522
Contact: Andy Emery
(951)826-5311
Completed 10/2009 $1,259,000.00
133.Mary Van Dyke Park
City of South El Monte
1415 N. Santa Anita Avenue
South El Monte, Ca 91733
Contact: Norma Macias
(626) 579-6540
Completed 12/2009 $1,259,000.00
134.Prime Desert Pavilion
City of Lancaster
44933 Fern Ave
Lancaster, Ca 93534
Contact: Neal Knopik
(661) 72-6000
Completed 10/2009 $145,674.00
135.Robinson Park
City of Pasadena
100 North Garfield Avenue
Pasadena, Ca 91109
Contact: Steven L. Wright
(626)744-7389
Completed 12/2009 $ 2,459,699.00
136.Westminster H.S. South Parking Lot
Huntington Beach Union High School District
5832 Bolsa Avenue
Huntington Beach, Ca 92649
Contact: Celia Taylor
(714) 903-7000
Completed 10/2009 $ 1,065,526.00
137.Huntington Beach H.S. Fire lane
Huntington Beach Union High School District
5832 Bolsa Ave
Huntington Beach, Ca 92649
Contact: Nelson Cayabyab
(714)903-7000
Completed 10/2009 $664,687.00
138. Villa & Singer Restrooms
City of Pasadena
100 North Garfield Avenue
Pasadena, Ca 91109
Contact: Steven L. Wright
(626)744-7389
Completed 7/2010 $458,855.00
139.Lake Skinner Improvements
Riverside County Regional Park & Open - Space District
4600 Crestmore Rd
Riverside, Ca 92509
Contact: Jason Plotkin
(951) 955-0169
(951)955-1383
Completed 7/2010 $4,162,378.55
140.West Downtown Pedestrian Improvement
City of Santa Barbara
630 Garden Street
Santa Barbara, Ca 93102
Contact: Eric Maple
(805)564-5377
(805)897-2613
Completed 04/2011 $2,299,220.00
141.Fairmount Park Universal Play Area
City of Riverside
3900 Main Street
Riverside, Ca 92522
(951)826-2000
(951) 826-2005
Contact: Andy Emery
Completed 06/2010 $2,207,907.00
142.Palm Dr & Pierson Streetscape
City of Desert Hot Springs
65-950 Pierson Blvd
Desert Hot Springs
(760)329-6411
(760) 288-0606
Contact: Jonathan Joy
Completed 06/2010 $3,221,889,93
143.Eastside Box & Woodward Parks
City of Yorba Linda
4845 Casa Loma Avenue
Yorba Linda, Ca 92885
Steve Campbell
(714) 961-7168
Completed 06/2010 $1,067,515.41
144.Peck Park
City of Los Angeles
1149 South Broadway
Los Angeles, Ca 90015
(213) 847-1922
Contact: Mary Carter
Completed 09/11 Original Contract $3,636,946.00
145.Pioneer High School Sitework — Quad
Whittier Union High School District
9401 S Painter Ave
Whittier, Ca 90605
(562) 698-8121
Contact: Stephanie Rutembeck
Completed 09/2010
Original Contract $1,088,487.00
146. El Toro Park Renovation
City of Lake Forest
25550 Commercentre Dr Suite 100
Lake Forest, Ca 92630
(949)461-3400
Contact: Luis Estevez
Completed 09/2010
Original Contract $ 563,681.00
147. Van Wig Courtyard Renovation
Bassett Unified School District
904 N. Willow Ave
La Puente, Ca 91746
(626) 839-9300
Contact: Wilson Vasconez
Completed 10/2010
Original Contract $ 648,276.00
148. Hunter Hobby Park
City of Riverside
3900 Main St
Riverside, Ca 92522
(951) 826-2012
(951)826-2038
Contact: Ewina Lau
Completed 12/2011
Original Contract $4,754,813.00
149. Costa Mesa High School
Newport —Mesa Unified School District
2985 — A Bear Street
Costa Mesa, Ca 92626
(714)424-5000
Contact: James Lamond
Completed: 09/2010
Original Contract $ 369,072.00
150. Sepulveda Basin Sports Complex
City of Los Angeles
221 N. Figueroa St. Ste 1510
Los Angeles, Ca 90012
(213)202-2640
Contact: Mary E Alvarez
Completed 01/2012
Original Contract $ 7,301,548.00
151. Corona Del Mar High School
Newport Mesa Unified School District
2985 — A Bear Street
Costa Mesa, Ca 92626
(714)424-5000
Contact: Jeffery Trader
Completed 02/2011 $916,155.00
152. Multi -Site Track & Field Improvements
Huntington Beach Unified H.S.D.,
5832 Bolsa Ave
Huntington Beach, CA 92649
(714) 903-7000 x 4359
Contact: Celia Taylor
Completed 05/2011 3,208,884.00
153.Atwater Park
City of Los Angeles
221 N Figueroa Street
Los Angeles, Ca 90012
(213)202-2640
Contact: Mary E Alvarez
Completed 12/2011 Original Contract: 2,170,632.00
154.Pier Bowl Lighting
City of San Clemente
910 Calle Negocio
San Clemente, Ca 92673
(949) 361-8267
Contact: Tim Shaw
Completed 07/11 Original Contract: 1,326,322.00
155.4"1 Avenue Park
County of Los Angeles
4800 Cesar E Chavez Avenue
Los Angeles, Ca 90022
(323) 260-3449
Contact: Jeffrey Biben
Completed 5/12 Original Contract: 3,866,188.00
156. College Park
City of Oxnard
1060 Pacific Avenue
Oxnard, Ca 93030
(805) 385-7821
Contact: Ralph Alamillo
Completed 1/12 Original Contract: 11,056,475.00
157.Doty Trust Park
City of Riverside
3900 Main Street
Riverside, Ca 92522
(951)826-2000
Contact: Andy Emery
Completed 5/1.2 Original Contact: $3,531,462.00
158.Gibson Mariposa Park
City of El Monte
11333 Valley Blvd
El Monte, Ca 91731
(626)580-2058
Contact: James Emiquez
Completed 01/12
Original Contract 2,905,629.00
159.11untfngton Beach High School Athletic Fleld Imp
Huntington Beach Union High School District
5832 Bolsa ave
Huntington Beach, Ca 92649
(714)903-7000
Contact: Celia Taylor
Completed 12/2011 Original Contract $ 2,235,567.00
160.Cacamonga Elementary School Site Imp
Cucamonga School District
8776 Archibald Ave
Rancho Cucamonga, Ca 91730
(909) 484-1009
Contact: Lynn Ashton
Completed 08/11Original Contract: $212,426.00
161.Costa Mesa High School Paving & Landscape
Newport — Mesa Unified School District
2985 — A Bear Street
Costa Mesa, Ca 92626
(714) 424-5079
Contact: Jeffery Trader
Completed 09/11 Original Contract $ 467,692.00
162.Don Julian Elementary Path of Travel
Basset Unified School District
904 N Wilson Ave
La Puente, Ca 91746
(626) 931-3000
Contact: Wilson Vasconez
Completed 08/11 Original Contract $ 779,654.00
163.Atlantis Splash Pad
City of Garden Grove
11222 Acacia Parkway
Garden Grove, Ca 92842
(714) 741-5040
Contact: Sandra Segawa
Completed 03/12 Original Contract $ 668,192.00
164.Costa Mesa H.S. Utilities
Newport — Mesa Unified School District
2985 —A Bear Street
Costa Mesa, Ca 92626
(714)424-8950
Contact: Craig P. Scaringi
Completed 09/11 Original Contract $ 1,215,274.00
165.Copper Hill Park
County of Los Angeles
900 South Fremont Ave
Alhambra, Ca 91803
(626) 300-2329
Contact: Claire Chang
Completed 5/2012 Original Contract $ 795,555.00
166.Florence Ave. Parking Lot
County of Los Angeles Community Development Commission
1616 E.Florence Ave
Los Angeles, Ca 90001
(323)864-2574
Contact: Chen Kao
Completed 1/2012
Original Contract $364,104.00
167. Full Half Width
County of San Bernardino
222 W. Hospitality Lane
San Bernardino, Ca 92415
(909)386-8775
Contact: Arthur L Rivera
Completed 10/2012
Original Contract $ 2,696,336.00
168.Tequesquite Park Imp.
City of Riverside
3900 Main St
Riverside, Ca 92522
(951)826-2000
Contact: Andy Emery
Completed 6/2013
Original Contract $7,016,220.00
169.Arlington H.S. Field Upgrades
Riverside Unified School District
3380 14`h Street
Riverside, Ca 92501
951-352-6729
Contact: Chenehira (Jane) Jumnongslip
Completed 11/2012
Original Contract $3,092,452.00
170.Roosevelt II Elementary School
San Bernardino City Unified School District
777 N. F Street
San Bernardino, Ca 92410
909-384-1785
Contact: Andres Ramirez
Completed 12/12
Original Contract $1,088,938.00
171.Poly High School — Stadium Improvements
Riversde Unified School District
3380 14`h Street
Riverside, Ca 92501
951-788-7147
Contact: Janet Dixon
Completed 01/12
Original Contract $1,223,921.00
172.Monterey Ave Entrance
Desert Community College District
43-500 Monterey Ave
Palm Desert, Ca 92260
760-346-8041
Contact: Karen LeSassier
Completed 08/2013
Original Contract $1,201,040.00
1.73.North Campus Front Quad Landscape
Long Beach Community College District
4901 East Carson Street
Long Beach, Ca 90808
562-938-4947
Contact: Margie Padron
Completed 5/2013
Original Contract $2,271,564.25
174.Magnolia High School
Anaheim Union High School District
501 Crescent Way
Anaheim, Ca 92803
714-999-3511
Contact: Jennifer Ellmore
Completed 12/2012 Original Contact $1,427,100.00
175. Fitness Park
City of Paramount
16400 Colorado Avenue
Paramount, Ca 90723
562-220-2000
Contact: Bill Pagett
Completed 4/2013
Original Contact $3,767,348.23
176. Bagdouma Park
City of Coachella
1515 Sixth St
Coachella, Ca 92236
760-398-5744
Contact: Gordon Fisher
Completed 4/2013
Original Contract $2,447,971.00
177. Hwy 18 Imp
Town of Apple Valley
14955 Dale Evans Pkwy
Apple Valley, Ca 92307
760-240-7000
Contact: Christopher Moore
Completed 4/2013
Original Contract: $967,933.41.
178.Valley College
San Bernardino Valley College District
114 S. Del Rosa Dr
San Bernardino, Ca 92408
Contact: Charlie NG
909-382-4000
Completed 4/2013
Original Contract: $1,356,776.00
179.Orange Grove Park
Community Development Commission County of Los Angeles
700 W. Main St
Alhambra, Ca 91801
(323) 260-3449
Contact: Jeffrey Biben
Completed 01/14
Original Contract: $1,756,889.72
180.1) Street Improvements
City of Perris
101 N D Street
Perris, Ca 92570
Contact: Michael Morales
951-956-2120
Completed 11/2013
Original Contract: $ 1,723,873.60
181.Chittick Field
City Of Long Beach
333 West Ocean Blvd ] 0`h Floor
Long Beach, Ca 90802
Contact: Manly Surakis
562-570-6283
Completed 5/2014
Original Contract: $7.1 MM
182.Avocado Heights Trail
County of Los Angeles
900 S Fremont Ave
Alhambra, Ca 91803
Contact: Irma Vasquez
626-458-4951
Completed 7/2014
Original Contract: $4,038,400.00
183.Rimrock Road
City of Barstow
220 E Mountain View Street
Barstow, Ca 92311
Contact: JoAnne V. Cousin
760-256-3531
Completed 2/1014
Original Contract: $ 7,547,936.24
184. Median Improvements
Town of Yucca Valley
58928 Business Center Dr
Yucca Valley, Ca 92284
Contact: Alex Qishta
760-369-6579
Completes 5/2014
Original Contract: $2,161,147.00
185. Cedar Avenue
County of San Bernardino
825 E. Third St
San Bernardino, Ca 92415
Contact: Johnny Gayman
(909) 387-8104
Completed 06/2014
Original Contract: $ 811,969.00
186. Rexford Intersection Imp.
City of Beverly Hills
455 N. Rexford Drive
Beverly Hills, Ca 90210
Contact: Alan Schneider
(310) 285-2400
Completed 5/2014
Original Contract: $ 396,624.00
187.CDBG Sidewalk Imp
City of Corona
400 S. Vicentia Avenue
Corona, Ca 92882
Contact: Barry Ghaemi
(951)739-4961
Completed 7/2014
Original Contract $422,893.00
188. W. San Grabriel River
City of Lakewood
5050 N. Clark Ave
Lakewood, Ca 90714
Contact: Kimberly McDowell
562-866-9771
Completed 11/2014
Original Contract $912,903.00
189. Royal High School Track & Field
Simi Valley U.S.D
875 E. Cochran St
Simi Valley, Ca 93065
Contact: Pedro Avila
805-306-4500
Completed 11/2014
Original Contract $1,845,235.00
190. Curb & Sidewalk Imp
City of Rialto
335 W. Rialto Ave
Rialto, Ca 92376
Contact: Marcus L. Fuller
909-820-2525
Completed 10/2014
Original Contract $ 407,827.00
191. Ballfield No.5
City of Buenaventura
501 Poli Street
Ventura, Ca 93002
Contract: Melissa Yanez
805-654-7870
Completed 11/2014
Original Contract $ 610,809.62
192.Oso Parkway Widening
City of Mission Viejo
200 Civic Center
Mission Viejo, Ca 92691
Contact: Kimberly Schmitt
949-470-3052
Completed 712015
Original Contract $ 3,481,376.71
193. East Village Park
City of Oxnard
1060 Pacific Ave
Oxnard, Ca 93030
Contact: Ralph Alamillo
805-385-7821
Completed 5/2015
Original Contract $ 1,396,440.00
194. Crown Valley Community Park
City of Laguna Niguel
30111 Crown Valley Parkway
Laguna Niguel, Ca 92677
Contact: Hal Ghafari
949-362-4384
Completed 8/2015
Original Contract $4,599,485.88
195. Roxbury Park
City of Beverly Hills
345 Foothill Road
Beverly Hills, Ca 90210
Contact: Alan Schneider
310-285-1188
Completed 5/2015
Original Contract $996,626.00
196. Whitewater Park
City of Cathedral City
68700 Avenida Lalo Guerrero
Cathedral City, Ca 92234
Contact: John A. Corolla
760-770-0340 '
Completed 8/2015
Original Contact $ 2,499,241.00
197.Rutland & Gramercy Streets
City of Riverside
3900 Main St.
Riverside, Ca 92522
Contact: Danny Cwiak
951- 826-5341
Completed 04/2015
Original Contract $368,657.00
198. D Street Imp. Phase 6
City of Perris
101 N. D Street
Perris, Ca 92510
Contact: Michael Morales
951-956-2120
Completed 05/2015
Original Contract: $495,498.20
199, Grijalva Park
City of Orange
300 E. Chapman Ave
Orange, Ca 92866
Contact: Don Esquitz
714-532-6464
Completed 04/2015
Original Contract $ 337,809.00
200. La Mirada Blvd Median Nose Imp.
City of La Mirada
13700 La Mirada Blvd.
La Mirada, Ca 90637
Contact: Lori Wolfe
562-943-0131
Completed 5/2015
Original Contact $ 290,578.00
201. Lynwood Linear Park
City of Lynwood
11330 Bullis Rd
Lynwood, Ca 90262
Contact: Bruno Naulls
310-603-0220 Ext253
Completed 10/2015
Original Contract $ 4,683,273.00
202. Civic Center Conservation Park
City of Ontario
303 East B. Street
Ontario, Ca 91764
Contact: Carolyn Bell
909-395-2622
Completed 9/2015
Original Contract $ 1,985,083.00
203.Orange Splash Pad Zone
City of Paramount
16400 Colorado Ave
Paramount, Ca 90723
Contact: Sarah Ho
562-220-2000
Completed 9/2015
Original Contract $591,701.00
204. Perris Sound Wall
Perris Elementary School District
143 East I" Street
Perris, Ca 92570
Contact: Gloria Gonzales
951-657-3118
Completed 8/2015
Original Contract $ 558,772.00
205.Calipatria Capital Imp.
City of Calipatria
140 West Main St
Calipatria, Ca 92233
Contact: Jack
760-337-3883
Completed 8/2015
Original Contract $643,784.00
206.Oxford Retention Basin
County of Los Angeles
900 S. Fremont Ave
Alhambra, Ca 91803
Contact: Rick Sun
626-458-5911
Completed 6/2016
Original Contract $8,004,089.00
207.Beverly Bills Concrete, Curb & Gutter
City of Beverly Hills
345 Foothill Rd
Beverly Hills, Ca 90210
Contact: Tristan D Malabanan
310-285-2512
Completed 3/2016
Original Contact $ 996,981.00
208.Ridgeerest Corp. Yard
City ofRidgecrest
100 W. California Ave
Ridgecrest, Ca 93555
Contact: Mike Bustos
760-499-5083
Completed 5/2016
Original Contract $869,734.00
209. Los Feliz Dr. Sidewalk
City of Thousand Oaks
2100 Thousand Oaks Blvd
Thousand Oaks, Ca 91362
Contact: Mike Tohidian
805-449-2400
Completed 6/2016
Original Contact $881,446.00
210. Via Verde Avenue
City of San Dimas
245 East Bonita Avenue
San Dimas, Ca 91773
Contact: Steve M. Farmer
909-394-6200
Completed 7/2016
Original Contract $766,956.00
211. Pearbloosom Park
County of Los Angeles
900 S. Fremont Ave
Alhambra, Ca 91803
Contact: David Palma
626-458-2180
Completed 8/2016
Original Contract $1,082,272.00
212.Orange Blossom Trail
City of Redlands
35 Cajon Street
Redlands, Ca 92373
Contact: Gregory Brooks
909-798-7698
Completed 8/2016
Original Contract $692,783.00
213. Multi Parks
City of Oxnard
305 West Third Street
Oxnard, Ca 93030
Contact: Ralph Alamillo
805-385-7803
Completed 6/2016
Original Contract $588,097.00
214. Paramount Blvd. Urban Renovations
City of Paramount
16400 Colorado Ave
Paramount, Ca 90723
Contact: Bill Paget
562-220-2108
Completed 8/2016
Original Contract $3,316,409.95
215. IIKPP Grant Parks
City of Indio
100 Civic Center Mall
Indio, Ca 92201
Contact: Mike Edgar
760-391-4000
Completed 6/2016
Original Contract $1,069,040.00
216. CDBG Sidewalk Imp.
City of Corona
400 S. Vicentia Ave
Corona, Ca 92882
Contact: Barry Ghaemi
951-739-4961
Completed 7/2016
Original Contract $746,235.00
217. Tierra Bonita Park
City of Lancaster
44933 Fern Ave
Lancaster, Ca 93534
Contact: John Loomis
661-723-6237
Completed 10/2016
Original Contract $514,032.30
218. Richmar Park
City of San Marcos
201 Mata Way
San Marcos, Ca 92069
Contact: Michael Edwards
760-744-1050
Completed 02/2017
Original Contract $1,617,252.00
219. Landmark / Mountain View R & R
Moreno Valley Unified School District
25634 Alessandro Blvd
Moreno Valley, Ca 92553
Contact: Veronica Castro
951-571-7679
Completed 11/2016
Original Contract $505,303.00
220. Drake Chavez Park
City of Long Beach
333 W, Ocean Blvd 70' Floor
Long Beach, Ca 90802
Contact: Teri Luce
562-570-6200
Completed 5/2017
Original Contract $2,474,478.00
221. Moreno Valley H.S. Fencing
Moreno Valley Unified School District
25634 Alessandro Blvd
Moreno Valley, Ca 92553
Contact: Josie H. Ripoly
951-571-7500
Completed 5/2017
Original Contract $2,564,296.00
222. Carolyn Rosas Splash Pad
County of Los Angeles
900 S. Fremont Ave
Alhambra, Ca 91803
Contact: Loydi Nguyen
626-458-5100
Completed 10/2017
Original Contract $ 1,244,194.00
223. Los Robles Splash Pad
County of Los Angeles
900 S. Fremont Ave
Alhambra, Ca 91803
Contact: Loydi Nguyen
626-458-5100
Completed 10/2017
Contract $ 1,192,048.00
224. Mojave Riverwalk
Town of Apple Valley
14955 Dale Evans Pkwy
Apple Valley, Ca 92307
Contact: Richard Pederson
760-240-7000
Completed 2/2017
Original Contract $750,623.25
225. Futsal Court
City of Paramount
16400 Colorado Ave
Paramount, Ca 90723
Contact: Bill Pagett
562-220-2108
Completed 5/2017
Original Contract $442,709.00
226. Digiorgio Action Park
City of Arvin
200 Campus Dr.
Arvin, Ca 93203
Contact: Adam Ojeda
661-854-3134
Completed 2/2017
Original Contract $454,911.00
227. Paradise Creek Educational Park
City of National City
1243 National City Blvd
National City, Ca 91950
Contact: Stephen Manganiello
619-336-4241
Completed 8/2017
$612,243.00
228. FIrebaugh H.S. & Lynwood Middle School
Lynwood Unified School District
11321 Bullis Road
Lynwood, Ca 90262
Contact: Cecilia Ginoza
626-839-9300
Completed 7/2017
$1,812,083.00
229. Jack Bulik Courtyard
City of Fontana
16489 Orange Way
Fontana, Ca92335
Contact: Luis Villalobos
909-350-6696
Completed 5/2017
$566,583.00
230. Southwinds Park
City of Oxnard
305 W. Third St.
Oxnard, Ca 93030
Contact: Renee Hatcher
805-200-5289
Completed 8/2017
$933,120.00
231. Main St. Lighting Imp.
City of El Centro
1275 Main St.
EL Centro, Ca 92243
Jack Fleming
760-337-4515
Completed 8/2017
$1,799,971.00
232. Miles Ave Park
City of Indio
100 Civic Center Mall
Indio, Ca 92201
Contact: Mike Edgar
760-391-4000
Completed 8/2017
Original Contract $1,311,487.00
233. Kellogg Park
Trust for Public Land
135 W. Green Street 2"4 Floor
Pasadena, Ca 91105
Edna Robidas
323-223-0441
Completed 1/2018
$2,044,438.00
234. Various Parks Improvements
City of Pomona
505 S. Garey Ave
Pomona, Ca 91769
Dan Drake
909-620-2261
Completed 11/2017
$1,124,520.00
235. O'Farrell Charter School— Whole Site Modernization
San Diego Unified School District
2351 Cardinal Lane
San Diego, Ca 92123
Contact: Judith Stark
858-522-5864 .
Completed 9/2018
$2,817,474.00
236. Julian Fisher Park
City of Monrovia
415 S. Ivy Avenue
Monrovia, Ca 91016
Contact: Lauren Marshall
626-932-5575
Completed 11/2017
$474,635.00
237. Windrow Dog Park
City of Oxnard
305 W. Third St
Oxnard, Ca 93030
Contact: Renee Hatcher
805-200-5289
Completed 11/2017
$320,181.00
238. Wash Stabilization
City of Lake Havasu City
2330 McCulloch Blvd N.
Lake Havasu City, AZ 86403
Contact: Diane Libby
928-854-0779
Completed 6/2018
$3,256,325.00
239. Cordova Park Lighting Renovation
City of Mission Viejo
200 Civic Center
Mission Viejo, Ca 92691
Contact: Jerry Hill
949-470-3085
Completed 3/2018
$181,710.00
240. North Beach Playground
City of Santa Monica
1685 Main Street
Santa Monica, Ca 90401
Contact: Marcelo Serrano
310-458-2205
Completed 8/2018
$1,824,677.00
241. Brookhurst Security Fence
Anaheim Union High School District
501 Crescent Way
Anaheim, Ca 92803
Contact: Jennifer Keys
714-999-2380
Completed 4/2018
$673,507.00
242._Bus Bench Shelter Imp.
City of Redondo Beach
415 Diamond St.
Redondo Beach, Ca 90277
Contact: Nik Boas
310-318-0661
Complete 7/2018
$800,341.00
243. Wells Arlanza Sidewalks
City of Riverside
3900 Main Street
Riverside, Ca 92522
Contact: Alex Ramirez
951-826-5294
Completed 9/2018
$1,578,520.00
244. Torrance Splash Pad
City of Torrance
3031 Torrance Blvd
Torrance, Ca 90509
Contact: Nina Schroeder
310-781-7140
Completed 9/2018
$892,095.00
245. Civic Center & Community Center Imp.
City of Stanton
7800 Katella Ave
Stanton, Ca 90680
Contact: Guillermo Perez
714-379-9222
Completed 9/2018
1,179,072.00
246. Buena Park US Stadium
Fullerton Joint Union High School District
1051 W. Bastanchury Rd
Fullerton, Ca 92833
Contact: Maria Rafael
714-870-2819
Currently Working on
$13,801,330.00
247. Hollister/I-Cellogg Park
City of Goleta
130 Cremona Dr.
Goleta, Ca 93117
Contact: JoAnne Plummer
805-562-5505
Completed 312019
$3,592,171.00
248. Clover Park Restroom Replacement
City of Santa Monica
1685 Main Street
Santa Monica, Ca 90401
Contact: Marcelo Serrano
310-458-2205
Currently Working on
$2,101,827.00
249. Laguna Beach Village Entrance
City of Laguna Beach
505 Forest Avenue
Laguna Beach, Ca 92651
Contact: Robert Echavarria
949-497-9000 Ext 252
Completed 5/2019
$8,432,668.00
250. Alpine Park
City of Los Angeles
221 N. Figueroa St.
Los Angeles, Ca 90012
Contact: Javier Gonzalez
213-847-4725
Currently working on
$6,388,000.00
251. South Victoria Park
Land for Public Trust
135 W. Green St
Pasadena, Ca 91105
Contact: Edna Robidas
323-223-0441 Ext 15
Currently Working on
$1,247,927.00
252. Lake Havasu Ave Reconstruction
City of Lake Havasu City
2330 McCulloch Blvd N.
Lake Havasu City, AZ 86403
Contact: Shannon Blakey
928-854-0779
Currently Working on
$3,570,372.59
253. Commons Heritage Park
City of Cathedral City
68-700 Avenida Lalo Guerrero
Cathedral City, Ca 92234
Contact: John A Corella
760-770-0360
Currently Working on
$1,666,567.00
■■ii■iiii
C.S. LEGACY
CONSTkUCTION. INC.
Please Reference Section 321443
1.3 A
Laguna Beach Village Entrance Phase 1
City of Laguna Beach
505 Forest Avenue
Laguna Beach, Ca 92651
Contact: Robert Echavarria
rechavarria@griiTwstructures.com
949-497-9000 Ext 252
Completed 5/2019 $8,432,668.00
General Contractor — C.S. Legacy Construction, Inc.
1704 Unit B. S Grove Ave
Ontario, Ca 91761
909-590-2626
Contact: Gregg Strumpf
ue-gg(a,eslegacy, net
Hollister/Kellogg Park .
City of Goleta
130 Cremona Dr.
Goleta, Ca 93117
Contact: JoAnne Plummer
iplumraer@cityofgoleta.org
805-562-5505
Completed 3/2019 $3,592,171.00
General Contractor — C. S. Legacy Construction, Inc.
1704 Unit B. S Grove Ave
Ontario, Ca 91761
909-590-2626
Contact: Gregg Stumpf
greegAa csiegacv net
1704 S. Grove Avenue Unit B, Ontario, CA 91761
(909) 590-2626 (909) 590-4117 fax
D3 ['
■%■Mid N
C.S. LEGACY
CONSTkUCTION. [NC.
Civic Center & Community Center Imp.
City of Stanton
7800 Katella Ave
Stanton, Ca 90680
Contact: Guillermo Perez
GPerez ci.stanton ca us
714-379-9222
Completed 9/2018
1,179,072.00
General Contractor — C. S. Legacy Construction, Inc.
1704 Unit B. S Grove Ave
Ontario, Ca 91761
909-590-2626
Contact: Gregg Strumpf
W-egg(acsleeacy net
Lake Havasu Ave Reconstruction
City of Lake Havasu City
2330 McCulloch Blvd N.
Lake Havasu City, AZ 86403
Contact: Shannon Blakey
BlakeyS@lhcaz.gov
928-854-0779
Currently Working on
$3,570,372.59
General Contractor — C.S. Legacy Construction, Inc.
1704 Unit B. S Grove Ave
Ontario, Ca 91761
909-590-2626
Contact: Gregg Strumpf
reggAa cslegacy.net
1704 S. Grove Avenue Unit B, Ontario, CA 91761
(909) 590-2626 (909) 590-4117 fax
\ƒ
/ >
(N
00
ƒ )
t 0
e%0CN
ƒ
/6\E\00
\\d
`Ln
o&
)�a3/2k
5�2
t$i�E0)
ƒ\JCL
\\
)�
]\
u
)/
00
CITY OF SANTA ANA
BONDS Bond Number: 2981781
PROJECT NO.: 17-2674
FAITHFUL PERFORMANCE BOND
KNOW ALL MEN BY THESE PRESENTS that C.S. Legacy Construction, Inc.
,
as CONTRACTOR, and Great American Insurance Company
a corporation, organized and existing under the laws of the State, and duly authorized to transact
business under the laws of the State of California, as SURETY, are held and firmly bound unto
the City of Santa Ana, as AGENCY, in the penal sum of nine hundred ninety thousand
seven hundred forty three and 05/100 Dollars
($ 990,743.05 ), which is 100 percent of the total contract amount for the above stated
project, for the payment of which sum, CONTRACTOR and SURETY agree to be bound, jointly
and severally, firmly by these presents.
THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas CONTRACTOR has
been awarded and is about to enter into the annexed Contract Agreement with AGENCY dated
for Project No.17-2674 ; Center Street Urban Greening Project ,
if CONTRACTOR faithfully performs and fulfills all obligations in the performance of the Work
of Improvement to be done under said Contract Agreement in the manner and time specified
therein, then this obligation shall be null and void, otherwise it shall remain in full force and
effect in favor of AGENCY; provided that any alterations in the obligations or time for
completion made pursuant to the terms of the contract documents shall not in any way release
either CONTRACTOR or SURETY, and notice of such alterations is hereby waived by
SURETY.
IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seal this
Subscribed and sworn to before me, *****see attached acknowledgment, this 2 Z day of
20K.
Signature:
Notary Public in and for the County of State of
Rate of premium on this bond is $ per thousand.
Total amount of premium charge is $ 11,469.00 . To be filled in by Surety
**$14.40 per thosuand on the first $500,000 of the contract amount, $8.70 per thousand on the remaining $490,743.00 of the contract amount
*Provide CONTRACTOR /ADMITTED SURETY name, address, and telephone number and the
name, title, address, and telephone number of authorized representative.
1 of 3
8/7/2019 Great American.jpeg
GREAT AMERICAN INSURANCE COMPANY%
AdmilliStr3tWu Offkc: 301 E 4TH STREFT • CINCINNATI, OHIO 45= • 513J59 .SDW It FAX 513-723-Z74D
The nvmhcr of n.•swne nethurvcd hu
this rvnxc, nral4neKY is mt nsoa than THREF
N..0 1485c
YO\L'!.R Oh'ATTIHt\EY
KNOIVAIJ. NtEN 61"tT1E.SF. YR64F.M5: find theLiRI:ATAMERiCAN IMSLRANCE CUMRiNY, a a WXx wFmj,W reds istmp mefc
and M'vme ofthe Ivus(,rllv:.Slat of(Min.dte,hereh, wrldnaie. w,mitnm and agX,im Ua p nr Iscrsuys,dined bchsu-ymlifmnrc uwn
ne is ,wrsd. irs trw and 1-1-1 aluurnq-m�6et, tiv 4 ewd ,n its I--, Phes and umd m �n nr do bdwf of lhc. ,id tutntwy, x, ywn7, aaY y asd all Minh,
vndenakinE•c and wntruu of>wnYsl,ip, ul d"'n xrniv, nidigyt nm in the ,wsme lberto( rm
'es14nakv,C a [Nllmel ul'mreyahm a�alcd :x,d. Ihr, antbnnry sF.dl w cs;:zy; We I>-.,. ata;ui Rkkd � the Irandiir nl Urc ss'i fm,lawl An any sue, Inmd.
KEtN.RFOName AddreI,
MARC
S A- RF ALL Oh i.mA ll'N.uv
JONRS A REED ALL
JON kW"NURG �SQN' $It1U.O00,000 DJ
AHIZ4MIA
Isis PawerafAudln,, sev ,dl Ixevmm R`ar'rX,ww,cdm Mtultnf Ilz uxrtrx'yrstm-Iv,:t ruvred zcdMniaptxa
gsxvl nhu.c. ;N WIT:I'%"Wl IER"*if- f.RLATA}1IRR AN iW 19 AWECSMI•AN\'ha: macsl dsex t,rs ,, m Idsm4nrtpvinre
aRicrrs and IN u rXwatc ,AI t .I. alh\,4 u"s T6TH dy of n'F.PrLYpFR \,tssr )01]
GRIFAIANUMCAN INSURAn EC04tP\NY
i suavr�.r.w....�... L� t'L�YXr'�i�\.• /_V
'TATf (N OlflO. ft1VNT1' (!s it AA71110N - m.
%rn Vsn 2dT11 nuaL m:'va 9rr.vrasrc9
Imvvn. bdap del. swmm ' ' n! .^iF3'IE1.fl$[R M17 lehuc tee ".dily
. dcµthe an4 sacs that he rtaides in Cuuinnm,, (Min. Ibv IN u a niv.:aaal Senaa Ync 1?PPrauN UAYtn (' XfTCII(N. ro me
\nsanut Insm:mvc fumrynv, the t'iv» - `crzdnnt of the Raays Dis'i:iru rvf f;red
3Ri.pl m (4 :a,d n,un,,,wc ,,, ;u� en win. ee'l, aN m am wh,d+camnui;ltc atone mrrrunent. to 1, ixxs drc xd of the said Cunprn- W.0 the Q
aane li aw by ),I, nlh,xsy rPwatc xal: iRn ,t wac su s!r ed M Aw neity nl M o1Lee under an, Il'-I-1 erm t.'annPm,v_ aad aw he yVNd hu
MY'mEpr06.16�C10 �"`n [Lh" � �jF.g.ticl�
Illy Powttaf A,"'. Y r, rrrntcd h, wdmn;Y n{tin Gn16 sn,uF r x7,rrinnc:s,pgncd M nc� t3wN of IJvaaws of Il
h:: anaoimtuns wnuct nn. c dcd J,nc 9.:U:IX rcX Amcriun IrAmmre ('mnpmy
.YF \t')LiGU TMe rArMwnrubyI, .H[m.>:h•r.rrp/[ryr.r..ngrr 3'e�rl..r Prerairnra fhvrsmrml3.r P2sti&,d. ysi Drrur..ert:(rsrsruu s',rr
Prxuknrr, ar ury w,e ajrh,m. bee mad ls.eb!-rs wuk+.nri. fnnr rmre ro e,mm. xs rtryiorrs, rx. w merr.tmrtr,rss�m.•;r�i ro erc,.au"..r brAU al r!r ('
.sssamy.urvamldl Nxeb, rnnkrretntE. rmdcan:rmrr<ITsx-�ru,'.vuT.. ,vdM.,,rnt-_•, olL /. `-"rrNn^.
..,r.ra;.arrn. Liner of rhur'urp,.vrrrrm: aurrn re nL�ren�rrvR �"<18•�Jc rmr..eY.m jruµ:scrrhr Nw.ra pn-nu'rmrru as
r4f_41/.Are Fb,f ,- Tlw lM C'prtpm:..n'd mJ:tm �.smv,.•r J gym' ofrlc yr w..swl w":cn. r+M.an ti„+.rw. warsoru x 5ecn'wv of the
iyw�.M rn(:x abf sa6anbv,Ase,mrlr w une p,,.e•' nj""mnnwr' ev crnsrnare o(rrrnr. cn,rn/Ur rlwr rrxanort yr um6w t rrxkndre . <unmacr arrwemM
imrr •rmrM mrhvr rhrrM rrrh rryr.n�r:imis<rrf vhrrtm,cmi brt<W fyr.Le afarwv9fry rM m r �m. nMrJT arr3rmr: snv nlrlr Cwgnrxrv. b Er vo:d <uaf bnd.rr:yyrr the C� PYH('n"t'rs* f/K vrg.rW nrrurm+rrlrrrp
"aymrrrV, rlK rvnr/ rrxNr/,hy �. r/emsh mwrinlfd rr�cd
CX;RI'IFICAI'ION
L`i r'PHENC RFRASIA,An,sunt 5ccreury of(:rrs lm,:r,an lnsvransr Comq,nnu.d;•hmiy r=uts LLss u4c ftr<frw,y;4.uer nfAnmxy nwl
:M1n :.wiasvnv pf UK Onard nl D,rcamc of June 9, :fION bout mi Men <rsvkcd ed sc row m n,it rm c mW eihxx
cirnw and xm.d m,� 2 2 sr. nr ,Tc�.�y ZO/CJ.
https:Hdrive.google.com/file/d/l PB3gw1 htEWJA-cgBtrWm2JY-nZh5nCa4/view?ts=5d4b598c 1/1
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual
who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
validit�of that document. _„___�,�_
State of California
County of _,_ Orange
On July 22, 2019
before me, Brandon K. Grindel
(insert name and title of the officer)
personally appeared Kevin P. Reed
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are
subscribed to the within instrument and acknowledged to me that he/she/they executed the same in
his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the
person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
A PoN H. 6RINDCailfo I. #
Notaryimm,ic -unty rnla l
s Orange Country.
Commission X 2247b79
My Comm. Upues Jun 18, 2021
(Seal)
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual
who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
-validity of that document.
State of California
County of SAN BERNARDINO
On AUGUST 9, 2019
before me, GLORIA MACIAS, NOTARY PUBLIC
(insert name and title of the officer)
personally appeared GREGG STRUMPF
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are
subscribed to the within instrument and acknowledged to me that he/she/they executed the same in
his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the
person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
Signature >
GLORIA MACIAS
,r Notary Pu611c - California
San Bernardino County €
i{ y° Commission # 2284219
My Comm. Expires Apr 2, 2023
(Seal)
CITY OF SANTA ANA
BONDS
Bond Number: 2981781
PROJECT NO.: 17-2674
KNOW ALL MEN BY THESE PRESENTS that C.S. Legacy Construction, Inc.
as CONTRACTOR, and Great American Insurance Company
a corporation, organized and existing under the laws of the State, and duly authorized to transact
business under the laws of the State of California, as SURETY, are held and firmly bound unto
the City of Santa Ana, as AGENCY, in the penal sum of nine hundred ninety thousand
seven hundred forty three and 05/100 Dollars
($ 990,743.05 ), which is 100 percent of the total contract amount for the above stated
project, for the payment of which sum, CONTRACTOR and SURETY agree to be bound, jointly
and severally, firmly by these presents.
THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas CONTRACTOR has
been awarded and is about to enter into the annexed Contract Agreement with AGENCY dated
for Project No.17-2674 ; Center Street Urban Greening Project
if CONTRACTOR or any subcontractor fails to pay for any labor or material of any kind used in
the performance of the Work of Improvement to be done under said Contract Agreement, or fails
to submit amounts due under the State Unemployment Insurance Act with respect to said labor,
SURETY will pay for the same in an amount not exceeding the sum set forth above, which
amount shall insure to the benefit of all persons entitled to file claims under the State Code of
Civil Procedures; provided that any alterations in the work to be done, materials to be furnished,
or time for completion made pursuant to the terms of the contract documents shall not in any
way release either CONTRACTOR or SURETY, and notice of said alterations is hereby waived
by SURETY.
IN WITNESS VTIEREOF the parties hereto have set their names, titles, hands, and seal this
22nd day of July 20 19.
President
SURETY*
Kevin P. ReftAttorney-in-Fad
Subscribed and sworn to before me, see attached acknowledgment this 2 7_ day of
J"/y, 20 tai.
T
Signature:
Notary Public in and for the County of
State of
Rate of premium on this bond is $ included per thousand.
Total amount of premium charge is $ included . To be filled in by Surety
*Provide CONTRACTOR /ADMITTED SURETY name, address, and telephone number and the
name, title, address, and telephone number of authorized representative.
2 of 3
8/7/2019
Great American.jpeg
GREAT AMERICAN INSURANCE COMPANY0
Admellstrativrl ptfkC: 301 E 4TH STREET a CINCINNATI, OHIO 45202 a 513. 69-SDDD w FAX 513-723-274D
T"te pa:nicr of q'rsrurulutlww:d in
Ihix pnuer ol'al:n:rty is m1 nwrt Ilun THFi[t
No.0 14865
PONlk UF'ATTOMNEy
KNU{VAI J. h1F:ti 8V'I}IESS. PRkSF_NTS: 11,111 lM 1ALI:ATAMEIUCAN INSURANCE CONMAN)'. a rnrpornrw areaniHd axl¢iumg mKkr
and 11 vvmr of 0t laws of dx.Suve pfOhin, d:� hereh) ramLinmr, viltimK nod a im We PnsfMl M penzns nsrrtJ IKinu_ p mdmeio ly if mnle dran
nr rc ,ke,c,. Lis ort and laulal aun-cy-m-fxt I.rt rt M in IL' nauK, Plme arM need w ¢eMc oo b3ellnl dx still CvnlAgl}'. as smmy, ant aad alI Mn3s,
unrxnakan4' mld wnani: of smct,sllgr, of W'r unmo nhlipalvus in the rvnne tbnmf.
w-rdL-rmksn(, La axvrnea ufwrny¢hrp ve od Imder 11„1 xmMnn'Nvtl nru esgzy Ne Inrq>vard Mlo•+. dle:rshri4s'r.l a.fpnt>ry h41 weh Moo
Nome Addrras M A RC P. A. RF Land of Fhru�}
kMRCUS A. R(-Ep �' Of Ati
MN ROSUURG TLCSON. 3100.000,0W 00
ARIZONA
:his 51>w urAtuol,. nr& r, all rysvMgrsP-+ers Issued nr MMIf ofrbc ]nr.rrrrytsl,w-Iwt cared nhvee. IN,
INS(IM
olh<ras null it, m WwetsulEkh,-rcvlmlal tN dltAN�itl('AN AWE( aAlll'ANV has<axcd dress Ftcxnlz Fn MSBltd and nrkacdM 45 apF yvisr:
)lle
dn. of 3FPTCkWR Xt]
GREAI AM M- WAN INSURA NCB COMB\ NY
�_ wrrke ltesshv
ST:RFrM fNf1O.tY1lINT)'[n HAt tl1.dn -sv
rM lhu d"gTlt day of StYtFhlOEk
:nnsm. Ltd dill,o-1 sun-, d an4 eels ahm M nvees a C}rtsnnntl. f M:m.
ruva•c wrnxr W:anaelm
M17 Mhnr nu �rf of UAVIU 1 fN. le me
\1 W IHillr.dLC l lhV
the
� )M l'Mllllil)' deSCIrL{'d N dh9 wlrrll: CXRWN IIK aIXMC
-- v,,e i urk
pnLiAln 6f I RCJr
Aq
bell
]1LY'. G)19 Lr fa1S Inf oo,je
{ ry j gVryKnlc yYdl_ IRt! it 50 TJOZpI YS Jrij1NK•.(y
nvm rt+sscm hY
41WSnLMq IRn'paM4 dt Sal rWjlrlll{• yyd C. "' diif IIrC y,.d
pl el) UITICe oll i tit Iiti-I Jvy
44r auhnrw
A
of 1 C' onK�Y, and mn M dSmrt hrs
N0wyrheftkEl3w
a �
Shrs Pourrol Ann-cy wp.ule hry wUr9, Itrley
M'mser4dared of dt fnAowury rcxludnnc*MPtdh)eMfelurdofl Mcgxs nl'I prat Amerirnrr Irnumnre Cmgp my
rrrnnimn1hwn¢m nJust
kP.)TAtf7:U Tlnu u)e Jt� lil yl I a,d-nr. ]M•...r+W lirr:.rrmr l.Temb.:„r Prcs�nxr, fh.rmw]af ):.r Preulrm. r f finuruvA lssrsmrr tra
P'r N.rr. nr urc. mr oldsr.r. be and h'uwuM.•.xd.jn,.r rrrlar ra nee.p�•gny mr ry avve ,srrru.ress :rsFo-am¢.v. ,n [gAUfnfrtr !'e+q•.svn.
ar`M'fN:Om'BK/nwele{y. rrrgkrrG}rvlpl rNkf WPoYgfI[[!(SWYn'siraSi rtv Mivr rrvr1,oe-JNrPjli r.-R rR ilK lui✓i SfKlip.tt. %, .a a'.yannt•Lmrs ry lheu'rurdrornn; orrrf en re Xrrm'ruris rq�x.;rgnrnusrm•rmre f fzsrrthr rf..s rr� ays dnrxs maf
P.€_SO4.J'Fp I. t,A'11,EA 77au
toary.ur, s rhr nrpstr mr rrrr aim..ra'ef
mcbyLad byfolldr mar:In',.,4yruiwn'cJr.m om/rke.j w.do/firs.. rmJ abnor'.G( mhrrarrrdw.pnn.4nrrf�
ttwuYnarfw�ndxrxoywmr Aerc/.rh a Xr.xmr amt]rr.i •.hru a urrn 6rum iurnr' adanurd♦n rhr Caayau.r'rss r!t asp
.yrixr.. rind Um Mkwo'' 1i of dq'Crir lv. ra& sold cull b:mL�m:•x�n llt l'r. ,yru.f n0mnur n/rn'/!
+, wvmn'vrdr rh,;mKfw.rrisi r!kn u•nwn{h mcvuL lJr•rrjP.rc6
rFRITFICAPION
i, STF if, Elo.ld
NFkAcIulc,.fjomlSerreran PfGrras Arn¢xan hnnrm rnmsa�•.de•hm_by=^fs SS ui feryluwy FNlerofAdrme)uW
:hzP•essdgtisn. or llt iloard of Uuu'kve orJmt 9, 21XW hose Mnr revoked end re rowIe fall ILq end e(fai
.s�Gurd mdremm� mrx ��, Ikrr nr .�L�.�v 2.0101
.4auw.•Y.mvr ~��
TrCMK.1MVr Y�
https:Hdrive.google.com/file/d/1 PB3gwl htEWJA-cgBtrWm2JY-nZh5nCa4/view?ts=5d4b59Bc 1/1
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual
who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
validity_ of that document__
State of California
County of Grange
On July 22, 2019 before me, . Brandon K. Grindel
(insert name and title of the officer)
personally appeared Kevin P. Reed
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are
subscribed to the within instrument and acknowledged to me that helshe/they executed the same In
his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the
person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seat.
BRANDON K. GRINDEL If
Notary Public - California
s Orange County
Commission R 2249619
My Comm. Expires. Jun IB, 2022
(Seal)
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual
who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
validity of that document.
State of Califomia
County of SAN BERNARDINO
On AUGUST 9, 2019
before me, GLORIA MACIAS, NOTARY PUBLIC
(insert name and title of the officer)
personally appeared GREGG STRUMPF
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are
subscribed to the within instrument and acknowledged to me that he/she/they executed the same in
his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the
person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
GLORIA MACIAS
WITNESS my hand and official seal ': Notary Public - California
F'
San Bernardino County -
, e Commission A 7284219
My Comm. Expires Apr 2, 2023
Signature ( JLr . ') (Seal)
CITY OF SANTA ANA
BONDS Bond Number: 2981781
PROJECT NO.: 17-2674
WARRANTY PERFORMANCE AND PAYMENT BOND
(To be submitted upon project completion as a condition of project acceptance)
KNOW ALL MEN BY THESE PRESENTS that C.S. Le
as CONTRACTOR, and Great American Insurance
a corporation, organized and existing under the laws of the State, and duly authorized to transact
business under the laws of the State of California, as SURETY, are held and firmly bound unto
the City of Santa Ana, as AGENCY, in the penal sum of nine hundred ninety thousand
seven hundred forty three and 05/100 Dollars
($ 990,743.05 ), which is 100 percent of the final contract amount for the above stated
project, for the payment of which sum, CONTRACTOR and SURETY agree to be bound, jointly
and severally, firmly by these presents.
THE CONDITIONS OF THIS OBLIGATION AR E SUCH that, whereas CONTRACTOR has
been awarded and is about to enter into the annexed Contract Agreement with AGENCY dated
for Project No.17-2674 ; Center Street Urban Greening Project
if CONTRACTOR faithfully warrants the work done under said Contract Agreement against
material or quality defects for a period of one year after acceptance by the AGENCY, then this
obligation shall be null and void, otherwise it shall remain in full force and effect in favor of
AGENCY; provided that any alterations in the obligations or time for completion made pursuant
to the terms of the contract documents shall not in any way release either CONTRACTOR or
SURETY, and notice of such alterations is hereby waived by SURETY.
IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seal this
22nd day of J1114 20 19.
SURETY*
Subscribed arjd swom to before me, %"""""'see attached acknowledgment this day of
Signature:
Notary Public in and for the County of State of
Rate of premium on this bond is $ included per thousand.
Total amount of premium charge is $ included . To be filled in by Surety
*Provide CONTRACTOR /ADMITTED SURETY name, address, and telephone number and the
name, title, address, and telephone number of authorized representative.
3 of 3
8/7/2019
Great American.jpeg
GREAT AMERICAN INSURANCE COMPANYn
Ada"NiStrativg Offiec: 301 E 4TH STREET • CINCINNATI, OHIO 45,202 $13-369-5f}00 FAX 613-72'f.174D
'"hc rlcni.cr ntr.rsrxrc arrtlrorvui hr
Ihiv town of alMrMY i� ml naxx 1Mn THREE
Nn.0 14866
HNOWAl"IF_N B\'I'HESE PRESEISTS: Tlnn am UKEATAMl It M' CAN [M
aad bt'+vtu, of ale laic ntll:c .Ctar,.o(Ohin. FJ(ICAN INSLA.gN(.EL'OMAlNI',amnu rtrun cvganihylnd amnig lmd,
O:a Inmly a. ,m aaa wnI i a nnJ appnin Ita: perum a p(xrarce ram,d brdcrw, each hr&vldosil< if mnr, dan
one n narnul. irs nac and lan l01 afarneTcl-fal. tax rt ar,4 ie ib rl:mc, Olbs aM nrad w --ft on bdlalf o) fbe sail L'srn , as auelT. aq av1 all SnnrL.
mdcnahin� and rglua,ls otsunlyshm. m rXha uncl,n -Wow., in lb, matam Ihnm{ mme md,nnk-rnX w nmrcam ofzvretyslup ceexirleJ msMr n.n auHnriry 1� rrix eantd the Imw vrrad Xe� � luMiinr.t 4ie ,,;.I Cnnfylr m nos sndr MuW,
KEI r'. R(EO Nanm Admelr
I.mnRm.v
MANCl15 A. Rf-EO ALL Of- ALL
MN RCSBURG Ur —SON. stoo.oW.DmM
AR,IZONA
leis lirua ofArmrnm =%> M all MVI(at Waert tamd m brlulTare,, amrlSllaFro-(al1 raacd a,,
INWIT 'ma ITRI�<)F llm C.NF:ATA.\Jf.ttll'ANINStIR ANCCC(fMl'ANY'Ex iw.,d lhcan prrunLs wlm> alwnllb bT ntngmopia,:
oRiccrt an ,rpt al, a -al 4rrrcrmlu alfixxd Wtt 35TH lxy u( iFr'iL'A1N[�N
x19
GfUJ:f AA1371H1�NI�NS}�11gA Nf.'E C/O/•\1H\YY
ST.4TF C40HIo.('oUNTYtR 11"iLION-, ._,o --..
rM IN, c"OT11 IvufCa•nau arl.arrs
IVIDER
k.a,n. Im." duds swum, ri nez anJ • of .SkPlF*ma, M7 brlur, la 1vrn I' alrTrcarnJ DAVIO C KFMI11N, Cam�r amP says thol he revi�s rn L'incauuu. (Y;ia, Ima k u a Oin.amal tirninr v,cc PceyJ,nl of the W al Drvoim of I:rey
vT;sarl �IIN cva noamlrcm n�. su:6 rnrXmy' dezcndy M msl wha ms nl:hc abmx msuanmr, mp h, kmnc ale seol of Ilan avd Caa,mIy. uv am aral
aunt 14n,ur by like aWurw rlltmal, xal:lnq it wr. le hFry aralnxin nl bu elLu urrJn do Ily-I aez ofs Con
'Remy. and nrX1 h, sigud hra
NAVY PuWS/Y dQlb
?hrsfbanaVfrwrncy 'panlcdM a,Uarrty of rtn fnl::,•_, ,eclminn= /�
Mai�vnlrc rarimn mnser4 rS4dlrax 9. 2rKIX - :nl+pledM ne NwNoflhrcwanf(nc6.4mencai lfvmmfae {'nnpany
.RA�'()La E'tl rhur the ylrva*m'NlPrr-cdrm. nFr w+rrwti,,.�,.ar:.feruv:rcs Prcrdrmt th..rsrwnfli.r Pret.,hrea ,v.{1lrvur..d �mrlua lits
"ien:fr,rrr, or an c+n• afdxor, br and hnsb� a urrhr+rrd. fr+.. rrm m aar. ro
acrosrv. wmaddllrvafr, umkndlny. end rorerunanharnr gyaorw ro-m mrve.rmn.nyzrn.F �iroer¢cnrr.w hhal/.Nrh-('n,xT.y,n.
rr rcatrcnnr Lmx. n/rhru arrinnry: adroramir mrrzmh awnu ararr�rrmeaM:y.::�.,u ra W: rurwr xa Jn, pz,u-nh M.n rsr/xmxm,rrcrard >� v
REk)l.YE'[r tifi.41/!f.'R Tlav+M['engnaa, rru and:iu r.>,+axun•oj,aer ofaw a+rravl rrr.rWmn .Lve.rwr cr.sv.nuvn ,4oezaJ' lrke
'myTn.v mm 6ajlrr..Cbcjk=imdrwanv[Q.m ojnmrnrrm,xsalmarr ojavrr. X.v Aw rh, ezrru'ro "(um 6'ad wrkn
m nrinr rrnrren rCJ+y+vmv rn rh rmxm rhnro{. zrrh zep.Aar mdz.nl vhax n nxJ mn hrrcln, rAuy. earvun �jrurrrcaMp.
..yfi.\. nmfrfrc mrylmlraly nj tlr!'orpwrv..ro tr rofd,ud hMor�vpon udgnrdhs Or!'a+{mavvw rhs nnXrrurnfnnro. n/rarh
+.L•.+n'rlrh r!r «mu jut nd rJkrt uc amalh nw 81' nff=d
I'M IFICATION
1, SIi-PNE\: Nf-RAiIA Au:s(anl Sc,rttm 4f GrsAl 4rrwran lmamrac pwa.d.•hmN'—_1f1 fna lhi fcmRo><rg i4,ccr ulArlaxy-ed
.tw Iiewialiem. of dre Lovri nl Oncanrc nr hmc 9, 2ws lu+c Iml dery Ir olwd W xc row m Nil lime, ad cfle.t
.SWw a,dammnor 22 d.nr .1LIUI1,
I 2or�
'
..ravF x+nm
https://drive.google.com/file/d/1 PB3gwl htEWJA-cgBtrWm2JY-nZh5nCa4/view.7tS=5d4b598c 1 /1
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual
who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
validity of that document-,,_-___
State of California
County of —...._ Orange
On July 22, 2019
before me, Brandon K. Grindel
(insert name and title of the officer)
personally appeared Kevin P. Reed
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are
subscribed to the within instrument and acknowledged to me that helshe/they executed the same in
his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the
person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY Under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
BRANDON K. GRINDEI.
s Notary Pubilc- California
a i Orange County _
Commission 8 2243619
My Comm. Expires Jun 18, 2022
(Seal)
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual
who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
-validity of that document.
State of California
County of SAN BERNARDINO
On AUGUST 9, 2019
before me, GLORIA MACIAS, NOTARY PUBLIC
(insert name and title of the officer)
personally appeared GREGG STRUMPF
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are
subscribed to the within instrument and acknowledged to me that he/she/they executed the same in
his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the
person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
,'.r. MACIAS
WITNESS my hand and official seal. c Y�i 1; No[ar y LPublic-Cali
San Bernardino County
% > j Commissfon p 2284211
My Comm. Expires Apr 2, 2023
Signature (Seal)
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
CONTRACT CHANGE ORDER
Project Number Project No. 17-2674 Center Street Urban Greening Change Order Number
To C.S Legacy Construction Inc. Contractor
You am hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and
specifications on this contract.
NOTE THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER.
Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time.
Change requested by PUBLIC WORKS; AGENCY
The compensation both time and cost set forth in this change order comprises the total compensation
due the Contractor, all Subcontractors, and all Suppliers for all work performed per this change order,
including impact on unchanged work. By signing this change order, the Contractor acknowledges and
agrees on behalf of himself, all Subcontractors, and all Suppliers, that the stipulated compensation
includes payment for all work contained in this change order, plus all payment for interruption of
schedules, extended field overhead, home office overhead, profit, delay, and all impact, ripple effect or
cumulative impact on all other work under this Contract. The signing of this change order constitutes full
mutual accord and satisfaction for all changes and work performed on this project, and that the time and
cost paid per this change order constitutes the total equitable adjustments owed the Contractor, all
Subcontractors, and all Suppliers for all work performed on this project. The Contractor on behalf of
himself, all Subcontractors, and all Suppliers agrees to waive all rights, without exception or reservation
of any whatsoever to file any further claim related to this project.
TOTAL COSTTHIS CHANGE ORDER: DECREASE $ INCREASE $ 35,790.70
By reason of this order the CONTRACT TIME completion will be adjusted as follows: 41.j non-compensable working days
We the undersigned contractor have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide
all equipment, furnish all materials, except as may otherwise be noted above, and perform all service necessary for the work above: specified, and will accept
as full payment therefor the prices shown above.
Accepted, Date x J Contractor C.S Legacy Construction Inc.
By Title G
Approval recommended by Date
PUBUC WORKS AGENCY EXECUTIVE DIRECTOR I
Approved by Date
r1YMANAGER
ATTEST:
Page 2of2
ERK OF THE COUNCIL
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
CONTRACT CHANGE ORDER
Project Number Project No. 17-2674 Center Street Urban Greening Change Order Number 1
To C.S Legacy Construction Inc. Contractor
You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and
specifications on this contract.
NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER
Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time.
Change requested by PUBLIC WORKS AGENCY
EXTRA WORK AT AGREED PRICE
1. Added cost for FilterPave glass pervious pavement color modification. (PCO #3)
TOTAL AGREED PRICE = $4,300.00
2. Added cost for adding an extra 1" base layer under the 2" pervious pavement. (PCO #3)
TOTAL AGREED PRICE = $4,795.35
3. Change the seeding from 801b. & 401b. seeding to 120lb/AC. Seeding. (PCO #4)
4. Electrical design modification per delta 1. (PCO #8)
EXTRA WORK AT TIME & MATERIAL
1. Lighting conduit upsize.(PCO #1)
TOTAL AGREED PRICE = $813.05
TOTAL AGREED PRICE = $25,650.00
TOTAL AGREED PRICE = $232.30
Page 1 of 2