HomeMy WebLinkAboutPOWERPOINT PRESENTATION - 75A
813 NORTH EUCLID STREET 75A 21 -2019NO. CONDITIONAL USE PERMIT AND03,-2019AMENDMENT APPLICATION NO. 28,-MITIGATED NEGATIVE DECLARATION NO. 2018 City Council MeetingMarch 17, 2020
SITE DESCRIPTION Site 2 AvenueStreet and Hazard Access off of Euclid Site:West: Residential ResidentialFamily -South: TwoCenterEast: Religious Uses:Surrounding Land
3 24 Hour operationstations on a 0.65 acre parcelfoot fueling canopy with eight pump -1,800 squarefoot convenience store and -Develop a 3,045 squarePROJECT DESCRIPTION
SITE PLAN Euclid StreetHazard AvenueFueling CanopyStore 4
PROJECT BACKGROUND 5 21-2019.No(CUP)PermitUseConditionalapprovingresolutionaAdopt03-2019.NoApplicationAmendmentapprovingordinanceanAdopt28-2018.NoReviewEnvironmentalapprovingresolutionaAdopt:Counc
ilCitythethatrecommendedCommissionPlanning–2020,10FebruaryMeetingOrdinanceSunshine–2018,12May
Transportation •Noise•Hazards and Hazardous Materials•Geology and Soils •Cultural and Tribal Cultural•Measuresitigation Requiring MFactors Environmental 6 28-2018ENVIRONMENTAL REVIEW
NO. MND), MITIGATED NEGATIVE DECLARATION (require mitigation. comments were received that would result in an impact or No parties.the MND was circulated to interested On January 6,
2020 was prepared. with technical studies 28) -2018Review No. (Environmental Negative Declaration Mitigated
AMENDMENT APPLICATION (ZONE CHANGE)1)-Commercial (CCommunity designation: Proposed 2)-(RFamily Residential -Twodesignation: Current
RECOMMENDATION 8 conditionedas21-2019.NoPermitUseConditionalApproveand,03-2019.NoApplicationAmendmentApprove28-2018.NoReviewEnvironmentalAdopt
9
MITIGATION MEASURES 10.regulationslocalandstate,federal,applicableallwithaccordanceingroundwaterandsoilimpactedofdisposetoproceduresproperidentifyshallplanThe.plantheofpartasactivitiesexcavationdurin
gsite-onpresentbetoretainedbeshallpersonnelQualified.ProjectProposedtheofconstructionandgradingduringgroundwaterand/orsoilimpactedhydrocarbonofabsenceorpresencethedeterminetofirmqualifiedbysamplingso
iladditionalincludesthatplanmanagementgroundwaterandsoilaDepartmentsBuildingandPlanningandWorksPublicCitythetosubmitshallOwner/DeveloperPropertythepermit,gradingaofissuancethetoPrior:1-HAZMM.resource
stheofsalvageand/orexplorationforproceduresappropriatethepaleontologist,certifiedawithestablishshallwhoCity,thebydeterminedasmaterialspaleontologicalofevaluationandidentification,sampling,thepermitto
redirectedorhaltedtemporarilybeshallactivitiesconstructionallconstruction,andgradingduringencounteredareresourcespaleontologicalthateventtheIn:plansgradingtheonnotefollowingtheincludeshallOwner/Devel
operPropertythepermit,gradingaofissuancethetoPrior:1-GEOMM
MITIGATION MEASURES 11 through lane and modify the existing traffic signal.Hazard Avenue to provide a second eastbound the City its fair share of 35% of the cost to restripe permit,
the Property Owner/Developer shall pay to Prior to the issuance of a building 1: -MM TRANS.construction would be less than significantpotential vibration impacts associated with 1,
-MM NOIPPV at 25 feet. With implementation of creates a vibration level of 0.0170 inch per second sonic pile driver. A sonic style pile driver typically driver that produces similar
vibration levels as a style pile driver or other type of pile -with a sonicand require the installation of piles to be installed drivers during construction of the Proposed Project
would restrict the use of impact pile 1 -MM NOI
MITIGATION MEASURES 12 andfindingsandexcavationsofreportletterbriefacompleteshallrepresentative(s)tribalThe.warrantedbemayactionsappropriateotherorinstitution,educationalormuseumappropriatethetotrans
ferand/orreviewarchivalreburial,recovery,datatesting,documentation,find,theofareatheofavoidanceassuchmeasuresadditionalrepresentative(s),tribalthebydeterminedasCEQA,undersignificantpotentiallybetopro
vesdiscoverytheiffind,theofnaturetheonDepending.haltmustareaimmediatetheinworkactivities,disturbinggroundduringencounteredareresourcesculturaltribalIf.activitiesconstructiondisturbing-groundsubsurfac
eduringplacetaketomonitoringresourceculturaltribalforNationKizh–IndiansMissionofBandGabrielenothewithagreementmonitoringtribalAmericanNativeaCitythetosubmitshallOwner/DeveloperPropertythepermit,gradi
ngaofissuancethetoPrior:1-TCRMM