HomeMy WebLinkAbout55E - RESO SB1 FUNDING FY 2020-21REQUEST FOR
COUNCIL ACTION
CITY COUNCIL MEETING DATE:
APRIL 7, 2020
TITLE:
ADOPT A RESOLUTION AFFIRMING
PROJECTS FOR SB1 FUNDING IN THE
AMOUNT OF $6,378,389 FOR FISCAL
YEAR 2020-21 CAPITAL IMPROVEMENT
PROGRAM
CLERK OF COUNCIL USE ONLY:
APPROVED
❑
As Recommended
❑
As Amended
❑
Ordinance on 1" Reading
❑
Ordinance on 2ntl Reading
❑
Implementing Resolution
❑
Set Public Hearing For
CONTINUED TO
/s/ Kristine Ridge FILE NUMBER
CITY MANAGER
RECOMMENDED ACTION
Adopt a Resolution affirming the Fiscal Year 2020-21 SB-1 Projects List and anticipated funding in
the amount of $6,378,389, which is required to be submitted to the California Transportation
Commission (CTC) for budgeting the Fiscal Year 2020-21 Capital Improvement Program (CIP) and
for City eligibility to receive Road Maintenance and Rehabilitation Account (RMRA) funding.
DISCUSSION
Senate Bill 1 (SB-1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017),
was passed by the Legislature and signed into law by the Governor in April 2017 to address basic
road maintenance, rehabilitation, and critical safety needs on both the state highway and the local
street systems. The funding guidelines specify that before local agencies can receive their
apportionment of Road Maintenance and Rehabilitation Account (RMRA) funds in a given fiscal
year, agencies are required to adopt a resolution with a list of proposed projects (Exhibit 1).
The City will receive an estimated $6,378,389 in FY 2020-21 from RMRA funds, but to maintain
eligibility, the City must submit a resolution with the project list to the California Transportation
Commission (CTC) by May 1, 2020. Each RMRA-funded project must be specifically distinguished
from the Highway Users Tax Account funding, and project nominations must include a project
description, specific location, proposed completion schedule, and the estimated useful life.
The proposed projects are being incorporated into the FY 2020-21 Capital Improvement Program
(CIP) Budget, and staff has prepared FY 2020-21 CIP Project Sheets (Exhibit 2) for each of the
projects. The proposed projects are as follows:
55E-1
Resolution — FY 2020-21 SB-1 RMRA Project List
April 7, 2020
Page 2
17th Street Rehabilitation: Bristol to Flower
Reconstruction/resurfacing of existing pavement and replacement/installation of missing or
damaged, curbs, gutters, sidewalks, driveway approaches, and wheelchair ramps within this
segment of roadway.
17th Street Rehabilitation: Fairview to Bristol
Application of slurry seal, crack seal, and minor pavement resurfacing with asphalt concrete. The
work also include replacement/installation of missing or damaged curbs, gutters, sidewalk,
driveway approaches, wheelchair ramps, and striping.
Alton Avenue Rehabilitation: Main to Standard
Reconstruction/resurfacing of existing pavement and replacement/installation of missing or
damaged, curbs, gutters, sidewalks, driveway approaches, and wheelchair ramps within this
segment of roadway.
Fairview Avenue Rehabilitation: City Limits to Segerstrom
Reconstruction/resurfacing of existing pavement and replacement/installation of missing or
damaged, curbs, gutters, sidewalks, driveway approaches, and wheelchair ramps within this
segment of roadway.
Flower Street Rehabilitation: McFadden to First St
Reconstruction/resurfacing of existing pavement and replacement/installation of missing or
damaged, curbs, gutters, sidewalks, driveway approaches, and wheelchair ramps within this
segment of roadway.
MacArthur Boulevard Rehabilitation: Fairview to Raitt
Reconstruction/resurfacing of existing pavement and replacement/installation of missing or
damaged, curbs, gutters, sidewalks, driveway approaches, and wheelchair ramps within this
segment of roadway.
The City must annually submit the proposed RMRA projects list to the CTC, and as required,
provide updates on the project progress. Therefore, staff recommends that the City Council adopt
a resolution recognizing the proposed project list which will utilize FY 2020-21 RMRA funds (Exhibit
1).
STRATEGIC PLAN ALIGNMENT
Approval of this item supports the City's efforts to meet Goal #6 - Community Facilities &
Infrastructure, Objective #1 (Establish and Maintain a Community Investment Plan for All City
Assets), Strategy G (Develop and Implement the City's Capital Improvement Program in
Coordination with the Community Investment and Deferred Maintenance Plans).
ENVIRONMENTAL IMPACT
There is no environmental impact associated with this action
55E-2
Resolution — FY 2020-21 SB-1 RMRA Project List
April 7, 2020
Page 3
FISCAL IMPACT
Pursuant to the California Transportation Commission's Annual Reporting Guidelines for Local
Streets and Roads Funding, staff has identified six CIP projects to be funded with anticipated FY
2020-21 RMRA revenues in the table shown below. The proposed FY 2020-21 CIP budget was
prepared using the California Department of Finance RMRA January 2020 estimate of $6,378,389.
Fiscal Year 2020-21 — Potential SB 1 Road Repair and Accountability Act Projects
PROJECT
LOCATION
DESCRIPTION
COST
17/h Street
Fairview Street to Bristol Street
Preventative
Maintenance/Slurry
$790,000
1rh Street
Bristol Street to Flower Street
Road Rehabilitation
$1,050,000
Alton Avenue
Main Street to Standard Avenue
Road Rehabilitation
$770,000
Fairview Avenue
City Limit to Segerstrom Avenue
Road Rehabilitation
$2,188,389
Flower Street
McFadden Avenue to First Street
Road Rehabilitation
$700,000
MacArthur Boulevard
Fairview Street to Raitt Street
Road Rehabilitation
$880,000
Grand Total: $6,378,389
Exhibits: 1. Resolution and Proposed FY 2020-21 List of Projects
2. FY 2020-21 CIP Project Sheets
55E-3
EXHIBIT 1 jmf3/16/20
RESOLUTION NO. 2020-XXX
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
SANTA ANA ADOPTING A LIST OF PROJECTS TO BE
FUNDED BY SB 1: THE ROAD REPAIR AND
ACCOUNTABILITY ACT
:1=Ia:7X063 VIA III :l'aI.I=NIAK6161111►[MI 19i1aI.I:9N1WLe7 W.9a►rrGWG1►/GWG[.9
17i111101M -1
Section 1. The City Council of the City of Santa Ana hereby finds, determines and
declares as follows:
A. Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017, was
passed by the Legislature and signed into law by the Governor in April 2017 in order to
address the significant multi -modal transportation funding shortfalls statewide.
B. SB 1 includes accountability and transparency provisions that will ensure
the residents of the City of Santa Ana are aware of the projects proposed for funding in
our community and which projects have been completed each fiscal year.
C. The City of Santa Ana must establish a list of all projects to receive funding
from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, which
must include a description and the location of each proposed project, a proposed
schedule for the project's completion, and the estimated useful life of the improvement.
D. The City will receive an estimated $6,378,389 in RMRA funding in Fiscal
Year 2020-21 from SB 1.
E. The City used a Pavement Management System to develop the SB 1 project
list to ensure revenues are being used on the most high -priority and cost-effective projects
that also meet the priorities of the community for transportation investment.
F. The funding from SB 1 will help the City maintain and rehabilitate local
streets and roads and provide resources for similar projects in the future.
G. Modernizing the local street and road system is critical for interconnectivity,
multimodal needs, and commerce.
H. The SB 1 project list and overall investment in our local streets and roads
infrastructure with a focus on basic maintenance, safety, and investing in complete streets
will have significant benefits statewide.
Resolution No. 2020-XXX
MEW
Page 1 of 3
jmf 3/16/20
Section 2. The City of Santa Ana adopts the following list of projects planned
to be funded with Road Maintenance and Rehabilitation Account (RMRA) revenues for
Fiscal Year 2020-21.
Project Name
Location
Description
Proposed
Project
Completion
Estimated
Useful Life
Road Projects:
17th Street
Fairview Street to Bristol Street
Preventative
Maintenance/Slurry
12/31/21
10 YR
17th Street
Bristol Street to Flower Street
Road Rehabilitation
12/31/21
20 YR
Alton
Main Street to Standard Avenue
Road Rehabilitation
12/31/21
20 YR
Fairview Avenue
City Limit to Segerstrom Avenue
Road Rehabilitation
12/31/21
20 YR
Flower Street
McFadden Avenue to 1 st Street
Road Rehabilitation
12/31/21
20 YR
MacArthur
Boulevard
Fairview Street to Raitt Street
Road Rehabilitation
12/31/21
20 YR
Section 3. This Resolution shall take effect immediately upon its adoption by
the City Council, and the Clerk of the Council shall attest to and certify the vote adopting
this Resolution.
ADOPTED this day of 12020.
APPROVED AS TO FORM:
Sonia R. Carvalho, City Attorney
By: C
John M. Funk
Assistant City Attorney
Miguel A. Pulido
Mayor
Resolution No. 2020->=
55 E -5 Page 2 of 3
jmf 3/16/20
AYES:
NOES:
ABSTAIN:
NOT PRESENT:
Councilmembers
Councilmembers
Councilmembers
Councilmembers
CERTIFICATE OF ATTESTATION AND ORIGINALITY
I, Daisy Gomez, Clerk of the Council, do hereby certify the attached Resolution No. 2020 -
to be the original resolution adopted by the City Council of the City of Santa Ana on
.2020.
Date:
Clerk of the Council
City of Santa Ana
Resolution No. 2020->=
55 E -6 Page 3 of 3
§
_
�
� )
§
� a
q
we
w�
we2
�ƒ
{o
G�
GI«
I S
IL
I<-
/
§
/
E
o
om
�
/
\
}
%
& )
§kk
qo
co
«E�
�2
LC
o!t
w�
w22
w\
(ƒf
G/
GI2
�-
f
\
A
e
\\
om
§
f
\)%[
f;2E®
\[))t
� k\{
R ZIS
r
�;®.�4
w
z
wlG�:
w,\(�
\
f
/
{
& )
§kk
q\
w�
«Ecr
Pm
o!t
§}
§\\
0Z
GI2
wm
W2f
C;
a.m,
k
k
0
-j
<\
�
h
f
\
\
& )
°
Ra2
\\\
�\
w®E
wet
w}\
w/>
w\[
wk\
I<m
ILm;
k �
k
0 .
-j
Ci
0
SmLL
°B0
§�
E
22Lm
)}
)/)
§!
•,
�
,
zz 1
,
, c
<
�
h
f
/
/
{
& )
§kk
q\
P�
o!t
§�
§/\
o
0 Q>
w2
w 2 t
I<
ILm,
k
k
(
-j
�
h
f
!f \
\$)}\ •
coo tE�
),!`,
i�\\�
!};
%rQ
00
;�, ,!
W;®.�.
W�),ta
z E.2
wlG�`
wfte
§�� (
ik
(�
2 \)/
� ;fe
w))!,
o�!*�
�:§t§
G7l2
�E-ak a
�lr,a
\
}
z
\
)
&
RR2
P\
\ §
§)
§ /\
Gs#
GI«
IL
IL%$
k
§
k
g
{
co
�
h
f