HomeMy WebLinkAbout23C - CONTRACT FOR PREVENATIVE ST MAINTENANCEREQUEST FOR
COUNCIL ACTION
CITY COUNCIL MEETING DATE:
CLERK OF COUNCIL USE ONLY:
MAY 19, 2020
TITLE:
APPROVED
AWARD A CONSTRUCTION CONTRACT
❑ As Recommended
TO ALL AMERICAN ASPHALT IN THE
ElAmended
❑ OOrrdinance on 11' Reading
AMOUNT OF $1,984,588 FOR THE LOCAL
❑ Ordinance on 2nd Reading
STREET PREVENTATIVE MAINTENANCE
❑ Implementing Resolution
FY 2019-20 PROJECT WITH AN
❑ Set Public Hearing For
ESTIMATED TOTAL CONSTRUCTION
DELIVERY COST OF $2,775,000
(PROJECT NO. 20-6907)
(NON -GENERAL FUND)
CONTINUED TO
/s/ Kristine Ridge
FILE NUMBER
CITY MANAGER
RECOMMENDED ACTION
Award a construction contract to All American Asphalt, the lowest responsible bidder, in
accordance with the base bid in the amount of $1,984,588, for construction of the Local Street
Preventative Maintenance FY 2019-20 Project, for the term beginning upon execution of the
contract and ending upon project completion, and authorize the City Manager to execute the
contract subject to non -substantive changes approved by the City Manager and the City
Attorney.
Approve the Project Cost Analysis for a total estimated construction delivery cost of
$2,775,000, which includes $1,984,588 for the construction contract, $298,000 for contract
administration, inspection and testing, and a $492,412 project contingency (approximately 25%
of the construction contract amount), paid with Measure M2 Local Fairshare funding.
DISCUSSION
The City's Pavement Management Program has been developed to identify the preventive
maintenance requirements for the City's street network. The local street segments (Exhibit 1)
recommended for the Fiscal Year 2019-20 Local Street Preventative Maintenance Capital
Improvement Project have been identified as high priorities for slurry seal. The recommended work
consists of preparing the roadway by performing minor pavement repairs, including localized
replacement of asphalt concrete pavement, followed by slurry seal resurfacing, crack seal, striping,
and signage. The improvements also include replacement of damaged concrete curbs, gutters,
sidewalks, and curb ramps. Once completed, these improvements will improve the City's overall
pavement condition, enhance the visual appearance of the street, upgrade ride quality, and support
compliance with Americans with Disability Act standards.
23C-1
Award Construction Contract to All American Asphalt
Local Street Preventative Maintenance FY 2019/20 Project
May 19, 2020
Page 2
Public Outreach and Contractor Participation
To provide an opportunity for local vendors to submit bids, a Notice Inviting Bids was advertised in
the Orange County Register newspaper on March 26 and April 2, 2020, and bids were received
electronically via the City's web -based electronic bidding system, PlanetBids, on April 14, 2020.
Through the PlanetBids online portal, vendors may register to receive notifications on all current
and future City projects, as well as download contract documents, receive project updates and
submit bids electronically.
A total of 535 vendors, including 32 located in Santa Ana, were notified of the project via
PlanetBids. A total of 33 vendors requested bidding documents and five bids were received with
none from Santa Ana.
Bid Results Summary
RANK
BIDDER'S NAME
LOCATION
BASE BID
1
All American Asphalt
Corona
$1,984,588
2
Hardy & Harper, Inc.
Lake Forest
$2,154,000
3
R.J. Noble Company
Orange
$2,182,928
4
EBS General
Corona
$2,247,311
5
Excel Paving Co
Long Beach
$2,325,965
The five bids received were deemed responsive. All American Asphalt submitted the lowest
responsive bid in the amount of $1,984,588 (Exhibit 2). Based on the bid analysis and a
contractor's reference check, staff recommends awarding the construction contract to All American
Asphalt in the amount bid (Exhibit 3).
Project Delivery
To deliver a complete project, in addition to the construction contract awarded to the lowest
responsible bidder, the estimated total construction delivery cost of the project includes
construction administration, inspection, and testing, along with an allowance for contingencies to
account for unexpected or unforeseen conditions. Construction administration and inspection
includes construction management; implementation of the City's Community Workforce Agreement
requirements; inspection of the Contractor's work to ensure contract compliance, workmanship,
and quality; and material testing. As indicated in the Cost Analysis (Exhibit 4) and as summarized
in the table below, the estimated total construction delivery cost of the project is $2,775,000.
Construction Contract
$1,984,588
Construction Administration, Inspection, and Testing
$298,000
Contingencies
$492,412
ESTIMATED CONSTRUCTION DELIVERY COST
$2,775,000
Project funds will cover all staffing costs for delivery of this capital project.
STRATEGIC PLAN ALIGNMENT
23C-2
Award Construction Contract to All American Asphalt
Local Street Preventative Maintenance FY 2019/20 Project
May 19, 2020
Page 3
Approval of this item supports the City's efforts to meet Goal #6 - Community Facilities &
Infrastructure, Objective #1 (establish and maintain a Community Investment Plan for all City
assets), Strategy B (equitably maintain existing streets and associated assets in a state of good
repair so they are clean, safe, and aesthetically pleasing for all users), Strategy C (invest resources
and technology to extend the service life of existing infrastructure to protect the City's investment
and support a high quality of life standard), and Strategy G (develop and implement the City's
Capital Improvement Program in coordination with the Community Investment Plan).
ENVIRONMENTAL IMPACT
In accordance with the California Environmental Quality Act, the recommended actions are
exempt from further review. Categorical Exemption Environmental Review No. ER-2019-81 was
filed for the project.
FISCAL IMPACT
As indicated in the Cost Analysis (Exhibit 4), the estimated total construction delivery cost of the
project is $2,775,000, which includes the construction contract, contract administration, inspection,
testing, and project contingency. The following table summarizes the funds budgeted in the FY
2019-20 Capital Improvement Program to deliver construction of this proiect:
ACCOUNTING
ACCOUNTING UNIT -
FISCAL
UNIT - ACCOUNT
FUND
YEAR
NO.
DESCRIPTION
ACCOUNT NO.
AMOUNT
PROJECT NO.
DESCRIPTION
FY 2019-
03217662-66220
Measure M-
Measure M2 Local
Street
Fairshare, Improvements
$2,775,000
20
(20-6907)
Construction
Other Than Building
Total
$2,775,000
All funds are scheduled for expenditure in Fiscal Year 2020-21.
IXVJLe7L1Le71240
Exhibits: 1. Location Map
2. Bid
3. Construction Contract
4. Cost Analysis
23C-3
PREVENTATIVE MAINTENAN(
NEIGHBORHOOD BOUNDAR)
NEIGHBORHOODS:
15 - BRISTOL / WARNER
16-LAURELHURST
18 - CENTENNIAL PARK
20 - MID -CITY
21-ARTESIA PILAR
33-SHADOW RUN
35 -VALLEY ADAMS
SANTA ANA
EXHIBIT 1
17TW CT
WARNER AVE
PROJECT 20-6907
LOCAL STREET PREVENTATIVE
FY 2019/20
MAINTENANCE
PAGE 1 OF 1
23C-4
City of Santa Ana
EXHIBIT 2
Local Street Preventative
Maintenance FY 19120 (Project 20-6907), bidding on April 14, 2020 2:00 PM (Pacific) Primed 042412020
Bid Results
Bidder Details
Vendor Name
All American Asphalt
Address
400 E. Sixth Street
Corona, CA 92879
United States
Respondee
Jim McGee
Respondee Title
Project Manager
Phone
951-736-7600 Ext.
Email
publicworks@allamericanasphalt.com
Vendor Type
CADIR
License 4
267073
CA DIR
Bid Detail
Bid Format
Electronic
Submitted
April 14, 2020 1:50:06 PM (Pacific)
Delivery Method
Bid Responsive
Bid Status
Submitted
Confirmation 4
206470
Ranking
0
Respondee Comment
Buyer Comment
Attachments
File Title
File Name
File Type
Bid Documents- All American Asphalt
Local Street Preventative Maintenance Bid Documents.pdf
General Forms
Ownership Affidavit- All American Asphalt
Local Street Preventative Maintenance Ownership
Ownership Affidavit (Notary
Affidavit.pdf
Public) - REQ Original Hard
Copy Submittal in Addition
Bid Bond- All American Asphalt
Local Street Preventative Maintenance Bid Bond.pdf
Bid Bond Guaranty (Notary
Public) - REQ Original Hard
Copy Submittal in Addition
Non -Collusion Affidavit- All American Asphalt
Local Street Preventative Maintenace Non Collusion
Non -Collusion Affidavit
Affidavit.pdf
(Notary Public) - REQ Original
Hard Copy Submittal in
Addition
Line Items
Type
Item Code
UOM
Oty
Unit Price
Line Total Comment
Base Bid Items
1
Unclassified Excavation*
CY
740
$145.00
$107,300.00
2
Cold Milling (1.5'-T')*
SF
254300
50.30
$76,290.00
3
Cold Milling (5)*
SF
11800
51.00
$11,800.00
City of Santa Ana
Page 2
Local Street Preventative Maintenance FY 19120 (Project 20-6907), bidding
on April 14, 2020
2:00 PM (Pacific)
Primed 042412020
Bid Results
Type
Item Code UOM
Qty
Unit Price
Line Total Comment
4
Asphalt Concrete (AC Pavement)*
TN
3570
$73.00
$260,610.00
5
Rubberized Emulsion Aggregate Slurry (REAS) Type II*
TN
1600
$630.00
$1,008,000.00
6
Construct PCC Curb & Gutter (A-2-6)*
LF
1080
$45.00
$48,600.00
7
PCC Curb Ramp*
SF
6300
$10.00
$63,000.00
8
Construct PCC sidewalk (T=4")*
SF
3310
56.80
$22,508.00
9
PCC Cross Gutter*
SF
12800
$16.00
$204,800.00
10
Root Shave*
EA
32
$370.00
$11,840.00
11
Adjust Manhole Frame & Cover to Finished Grade
EA
24
$600.00
$14,400.00
12
Adjust Water Valve Frame & Cover to Finished Grade
EA
49
$600.00
$29,400.00
13
Crack Sealing
LS
1
$52,000.00
$52,000.00
14
Protection of Surface Utility Frames and Covers
LS
1
$1,500.00
$1,500.00
15
Remove Existing Striping, Pavement Legends, and Markers
LS
1
$18,900.00
$18,900.00
16
Furnish & Install Traffic LoopS Type E
EA
4
$455.00
$1,820.00
17
Signing & Striping
LS
1
$38,300.00
$38,300.00
18
Project Advertisement Sign
LS
2
$760.00
$1,520.00
19
Labor Agreement Oversight
LS
1
$12,000.00
$12,000.00
Subtotal
$1,984,588.00
City of Santa Ana
Page 3
Local Street Preventative Maintenance FY 19120 (Project 20-6907), bidding on April 14, 2020 2:00 PM (Pacific) Primed 042412020
Bid Results
Type Item Code UOM Qty Unit Price Line Total Comment
Asterisk Notes (Per Section 3-2 of Standard Specifications) - NOT part of Total Bid Calculation
20 * = The quantity for this bid item is shown for bid comparison only. This bid item shall not be subject to the "25%" limit as stated in Section 3-2 of the
Standard Specifications. This bid item shall not be subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual
amount for this item will be dictated by the actual quantitiy used, and the Agency reserves the right to increase or decrease the quantity of this item
accordingly.
EA 0 0 0
21 t = This bid item is considered a Specialty Item per Section 2-3.2 of the Standard Specifications.
EA 0 0 0
Subtotal 0
Total $1,984,588.00
23C-7
MAYOR
Miguel A. Pulido
MAYOR PRO TEM
Juan Milegas
COUNCILMEMBERS
Phil Bacerra
Cecilia Igleslas
David Penaloza
Vicente Sarmiento
Jose Solono
April 2, 2020
ADDENDUM No. ONE
CITY OF SANTA ANA
Public Works Agency — Design Engineering
20 Civic Center Plaza, M-36 • P.O. Box 1988
Santa Ana, California 92702
www.santa-ana.oro
CITY MANAGER
Kristine Ridge
CITY ATTORNEY
Sonia R. Carvalho
CLERK OF THE COUNCIL
Daisy Gomez
SUBJECT: Project 20.6907 Local Street Preventative Maintenance Fiscal Year
2019-2020
The following changes have been made to Specifications for the subject project:
Specifications
1. TABLE OF CONTENTS, i to iii: Replace TABLE OF CONTENTS (i to iii) with
attached TABLE OF CONTENTS (i to iii)
2. PROPOSAL, P-1 to P-17: Replace Proposal section (P-1 to P-16) with attached
Proposal section (P-1 to P-17).
• Added P-17 STATEMENT REGARDING COMMUNITY WORKFORCE
AGREEMENT (CWA) REQUIREMENTS
CONTRACTOR MUST ACKNOWLEDGE PROJECT CWA REQUIREMENTS AS
PART OF BID SUBMITTAL
This addendum includes 21 pages (including this page).
ALL OTHER ITEMS REMAIN
FOR THE CITY OF SANTA ANA
Edwin "William" Galvez, P.E.
Public Works Agency
City Engineer
SANTA ANA CITY COUNCIL
14gw A. PUW J"m VA.", Vif wear Vw hard Mn g .b+s 9addo PIe BaWra GUW IgISWs
Naya Maya Pm Tam, Mm5 wamI WrN2 WN] We1d6 Wudd
...niee®w"e-ena.a iNoeoe�ume-eru.�ve nnienn®aam..me.ao dw.Nomft.na. 119 eeecx�aiIDunu.au i.Y �YYYiY®••e1•-Oe•
O .Wa
23C-8
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 20-6907
LOCAL STREET PREVENTATIVE MAINTENANCE FY 2019-20
BID PROPOSAL
TO: CITY COUNCIL OF THE CITY OF SANTA ANA
REQUIREMENT:
The undersigned bidder declares that they have carefully examined the location of the proposed
work, that they have examined the Contract Documents in its entirety and hereby proposes to
furnish all material and do all the work required to complete the said work in accordance with
said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the
following schedule:
Item
Description
Qty
Unit
Unit
Price
Amount
I
Unclassified Excavation*
740
CY
S l u r
$ I n 1 O
2
Cold Milling (1.5" — 2")*
254,300
SF
$ / O
$
3
Cold Milling (6")*
11,800
SF
$ I
$ Iwo
4
Asphalt Concrete (AC
Pavement)*
3,570
TN
$ rl
'1
$ 'no �In UG I 0
VI
5
Rubberized Emulsion Aggregate
Slurry (REAS) Type II*
1,600
TN
$�n 10
W
`U V
6
Construct
t2ons r ct PCC Curb and Gutter
1,080
LF
$
$
7
PCC Curb Ramp*
6,300
SF
$
$ 2 0 o O
Jn
8
Construct PCC Sidewalk
T=4" *
3,310
SF
$� O
$
(0
!JJ
9
PCC Cross Gutter*
12,800
SF
$ 1 1 n
$10 (A� n D
10
Root Shave*
32
EA
$ J
$ I l U V
I I
Adjust Manhole Frame & Cover
to Finished Grade
24
EA
$ 0
0
(OVO
$ woo
�'l `'1
12
Adjust Water Valve Frame &
Cover Finished Grade
49
EA
$� o
$ ��
4 0
13
Crack Sealing
1
LS
51000
$
5UV
14
Protection of Surface Utility
Frames and Covers
1
LS
$11 Q D
$ I f o O
l!�
21#%'%#P--ff%7
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 20-6907
LOCAL STREET PREVENTATIVE MAINTENANCE FY 2019-20
Item
Description
Qty
Unit
Unit
Price
Amount
15
Remove Existing Striping,
Pavement Legends, and Markers
1
LS
I 00
"l Q O
16
Furnish and Install Traffic Loops
Type E
4
EA
$ 5 J
J
$ I O
17
Signing & Striping
1
L5�
3oti
$ n O
18
Project Advertisement Sign
2
LS
$
19
Labor Agreement Oversight
I
LS
$12,000
$12,000
TOTAL BASE BID $ I 1 � " • D D
The lowest responsible bidder shall be selected based on the total base bid. The City reserves the
right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any).
* The quantity for this bid item is shown for bid comparison only. This bid item shall not be
subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual
amount for this item will be dictated by the actual quantity used, and the Agency reserves the
right to increase or decrease the quantity of this item accordingly.
f This bid item is considered a Specialty Item per Section 2-3.2 of the Standard Specifications.
TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES
The undersigned bidder hereby proposes to complete the Work for the total base bid amount
shown above, within eighty (80) working days after the commencement date stated in the Notice
to Proceed.
The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the
Standard Specifications, shall be $4,000 per calendar day.
Name of Firm All American Asphalt
Signature of BIDDER
Title Edward J. Carlson, Vice President
(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
Corporation, All American Asphalt
Mark Luer, President
Edward J. Carlson, Vice President
Michael Farkas, Secretary
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 20-6907
LOCAL STREET PREVENTATIVE MAINTENANCE FY 2019-20
BIDDER'S STATEMENT
BIDDER understands and agrees that this Bid Proposal, Contract Documents and subsequent
Construction Contract Agreement shall constitute the entire agreement between BIDDER and the
AGENCY only after it has been accepted by the City Council, endorsed by the Clerk of the
Council with her signature and official seal noting hereon the action of approval of the Council,
signed by the Public Works Agency Executive Director or his/her duly authorized agent, and
signed by the City Attorney, denoting his approval of the form of this document, and its
execution, and when it or an exact copy of it has been either delivered to BIDDER or deposited
with the United States Postal Service properly addressed to the BIDDER with the correct postage
affixed thereto.
BIDDER further agrees that upon delivery (as defined above) of the accepted agreement he/she
will furnish AGENCY all required bonds and certificate of liability insurance within ten (10)
business days or the funds, check, draft, or BIDDERS bond substituted in lieu thereof
accompanying this proposal shall become the property of the AGENCY and shall be considered
as payment of damages due to the delay and other causes suffered by AGENCY because of the
failure to furnish the necessary bonds and because it is distinctly agreed that the proof of
damages actually suffered is difficult to ascertain; otherwise said funds, check, drafts, or
BIDDER'S bond substituted in lieu thereof shall be returned to the undersigned.
BIDDER understands that a bid is required for the entire work, the estimated quantities set forth
in the bid schedule are solely for the purpose of comparing bids, and that final compensation
under the contract will be based upon the actual quantities of work satisfactorily completed. The
BIDDER also certifies that the bid is a balanced bid.
In accordance with Section 7028.15 of the California Business and Professions Code, the
undersigned certifies under penalty of perjury that the foregoing is true and correct.
Name of Firm All American Asphalt
Signature of BIDDER
Title Edward J. Carlson, Vice President
(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
Corporation, All American Asphalt
Mark Luer, President
Edward J. Carlson, Vice President
Michael Farkas, Secretary
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 20-6907
LOCAL STREET PREVENTATIVE MAINTENANCE FY 2019-20
CONTRACTOR'S LICENSING AND REGISTRATION STATEMENT
The undersigned contractor, or corporate officer, declares under penalty of perjury that he/she
and all his/her subcontractors are registered with the State of California Department of Industrial
Relations (DIR), and that the following is true and correct.
Contractor's Name: All American Asphalt
Business Address: 400 E 6th Street, Corona, CA 92879
Business E-Mail Address: publicworks@allamericanasphalt.com
Telephone: 951-736-7600
State Contractor's License No. and Class: 267073 Class: A, C-12
License Expiration Date:
1/31/2022
State Dept. of Industrial Relations (DIR)
Registration No.: 1000001051
State Dept. of Industrial Relations (DIR)
Registration Expiration Date: 1 06/30/2020
Signed:
Title: Edward J. Carlson, Vice President
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 20-6907
LOCAL STREET PREVENTATIVE MAINTENANCE FY 2019-20
PREVAILING WAGE COMPLIANCE AND MONITORING STATEMENT
Contractor is aware of the requirements of California Labor Code Section 1720, et seq., as well
as California Code of Regulations, Title 8, Section 16,000, et seq., ("Prevailing Wage Laws"),
which require the payment of prevailing wage rates and the performance of other requirements
on "public works" and "maintenance" projects. Since the services are being performed as part of
an applicable "public works" or "maintenance" project, as defined by the Prevailing Wage Laws,
and since the total compensation is $1,000 or more, Contractor agrees to fully comply with such
Prevailing Wage Laws.
City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at
the commencement of this Agreement. Contractor shall make copies of the prevailing rates of
per diem wages for each craft, classification or type of worker needed to execute the services
available to interested parties upon request, and shall post copies at the Contractor's principal
place of business and at the project site.
Contractor shall defend, indemnify and hold the City, its elected officials, officers, employees
and agents free and harmless from any claim or liability arising out of any failure or alleged
failure to comply with the Prevailing Wage Laws.
The undersigned certifies that the foregoing is true and correct.
Name of Firm All American Asphalt
Signature of 1311
Title Edward J. Carlson, Vice President
(if an individual, so state)
Corporation, All American Asphalt
Mark Luer, President
Edward J. Carlson, Vice President
Michael Farkas, Secretary
F '
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 20-6907
LOCAL STREET PREVENTATIVE MAINTENANCE FY 2019-20
OWNERSHIP AFFIDAVIT
STATE OF CALIFORNIA )
COUNTY OF ORANGE I SS:
CITY OF SANTA ANA )
Eftwd J. cansm , being duly swom. deposes and says:
❑ INDIVIDUAL That he/she is the party making the foregoing proposal:
❑ PARTNERSHIP That he/she is a member of the co•pannership firm designated as:
and who has been and is duly vested with the authority to make and execute instruments
for the co -partnership by:
who constitute the other members of the co -partnership.
®CORPORATION That he is of,
a corporation which is making the foregoing proposal:
❑ JOINT VENTURE That he is of:
one of the parties making the foregoing proposal as a joint venture, and the he/she has
been and is duly vested with the authority to execute instruments for an on behalf of the
parties making said bid who are:
that such a bid is genuine and not collusive or sham, and has not in any manner sought by
collusion to secure any advantage against the City of Santa Ana or any person interested in the
proposed contract, for himself or any other person.
Signatu Bider Edward J. Carlson. Vice President)
Subscribed and sworn to before me this,% day of 20
i>=
Signature of officer Admin+�ering Oath (Notary Public)
P-6 of P-17
23C-14
CALIFORNIA JURAT GOV CODE § 8202
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the
document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
State of California
County of Riverside
KENONA NA2ARI
NOUry Publk - Calllornia
- Rlverstde County
F Commission Y 3318601
'' My Comm, Expires Jan 10, 2024 -
Plett Notary aW Above
Subscribed and sworn to (or affirmed) before
me on this 9th day of April 2020,
Date Month
By (1) Edward J. Carlson
Name of Signer
Proved to me on the basis of satisfactory evidence
be the person who appeared before me (.) (,)
(and
(2)
Name of Signer
Proved to me on the basis of satisfactory evidence
be the person who appeared before me.)
Signature
Signature of Not Public
OPTIONAL
Though the information below is not required by law, R may prove
valuable to person retying on the document and could prevent
fraudulent removal and reattachment of this form to another document.
Further Description of Any Attached Document
Title or Type of Document Ownership Affidavit Santa Ana
Document Date: 4-9.2020 Number of Pages: 1
Signer(s) Other Than Named Above: None
23C-15
Bond No.08597423
Bid Date: 04/14/2020
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 20-6907
LOCAL STREET PREVENTATIVE MAIN I EN'ANCE FY 2019-20
BID BOND
KNOW ALL PRESENT that.
All American Asphalt as BIDDER. and
Fidelity and Deposit Company of Maryland as SURETY.
are held and firmly bound unto the CITY OF SANTA ANA, as AGENCY_ in the penal sum ot'_
Ten Percent of Total Amount Bid----- Dollars ($10% of Bid ), which is ten percent (100,'o)
of the total amount bid by BIDDER to AGENCY for the abnve-stated project. for the payment of
which sum. BIDDER and SURETY agree to be bound, jointly and severally, firmly by these
presents.
1HE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas BIDDER is about to
submit a bid to AGENCY for the above -stated project. if said bid is r41ected. or if said bid is
accepted and a contract is awarded and entered into by BIDDER in the manner and time
specified. then this obligation shall be null and void. otherwise it shall remain in full force and
effect in favor of AGENCY.
IN WITNESS WHEREOF the parties hereto have set their names, titles. hands, and seal this
6th day of April . 2020.
ili1L7.'Itii
SURETY"
Fidel*rk
s Compan of Ma land - 777 S. FI ueroa Street, Suite 3900, Lo�Angeles, �270-0600
017
Davi
Wiiliaorney-in-Fact.ubsworn 0 before me '•Please See Attached** this day of
.20 .
Signature:
Notary Public in and for the County of . State of
Provide BIDDER/ SURETY name. address. and telephone number and the name. title.
address, and telephone number of authorized representative.
P-7 of P-17
23C-16
CALIFORNIA ALL-PURPOSE ACKNOWLEDGEMENT CIVIL CODE § 1189
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the
document to which this certificate is attached. and not the truthfulness. accuracv. or validity of that document.
State of California
County of Riverside
On April 13, 2020 before me, Kenona Nazari, Notary Public
Date Here Immt name aM Tile a tna nmcer
personally appeared Edward J. Carlson
Nam W 6ipner�
who proved to me on the basis of satisfactory evidence to be the
person(s) whose name(s) is/afe subscribed to the within instrument
and acknowledged to me that he/shekhey executed the same in
hisAmwilheir authorized capacity("), and that by hisAmm4heir
signature(s) on the instrument the person(s), or the entity upon behalf
of which the person(s) acted, executed the instrument.
KENONA NA2ARI
Notary publiC. California I certify under PENALTY OF PERJURY under the laws of the State of
' Ilherside County California that the forgoing paragraph is true and correct.
Commission 8 2318601
My Comm. Expires Jan 10, 2024
WITNESS my hand a 9fficial seal.
Signature
Piwe Notary Seal New. � signature oIxiary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to person relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
Description of Attached Document
Title or Type of Document Bid Bond City of Santa Ana
Document Date: April 6 2020 Number of Pages: 3
Signer(s) Other Than Named Above: William Svrkin Attomey-in-Fact
Capacity(!") Claimed by Signer(*)
Signers Name: Edward J. Carlson Signer's Name:
❑ Individual ❑ Individual
X Corporate Officer—TRIe(s): Vice President ❑ Corporate Officer— dle(s):
❑ Partner L c Limited n General ❑ Partner l e Limit d o General
❑ Attomey in Fad ❑ Attomey in Fa
-oo aL`�.n[ ,xe Top W Numb here
❑ Trustee ❑Trustee
in Other: ❑ Other:
Signer is Representing: Signer is Representing:
All American Asphalt
23C-17
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § tISO
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the
document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
State of California )
County of Orange _ )
On 04/06/2020 before me, Litiana Gomez, Notary Public
Date Here Insert Name and Title of the Officer
personally appeared William Syrkin
NameKof Signers)
who proved to me on the basis of satisfactory evidence to be the person(s) whose names) is/are
subscribed to the within instrument and acknowledged to me that he/she/they executed the same In
his/herithak authorized capacity(ies), and that by his/head heir signatureZt} on the instrument the person(*
or the entity upon behalf of which the persons) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws
of the State of California that the foregoing paragraph
s true and correct.
( o nNacoM z1iWITNESS my hand and official seal.
9e d v � �I �dltor5id
\ wi co r. _a l •, �i ie, zM Signature
4- Signature of NiStary Public
Place Notary Seal Above
OPTIONAL
Though this section is optional, completing this Information can deter alteration of the document or
fraudulent reattachment of this form to an unintended document.
Description of Attached Document
Title or Type of Document: Bid Bond Document bate: 04/06/2020
Number of Pages: One I Signer(s) Other Than Named Above: All American Asphalt
Capacity(les) Claimed by Signer(s)
Signer's Name: William Syrkin
0 Corporate Officer — Title(s):
❑ Partner — ❑ Limited ❑ General
Individual 9?Attomey in Fact
❑ Trustee ❑ Guardian or Conservator
C Other:
Signer Is Representing:
Fidel and Deposit Company of Maryland
Signer's Name:
❑ Corporate Officer — Title(s):
❑ Partner — 11 Limited ❑ General
Individual ❑ Attorney in Fact
❑ Trustee ❑ Guardian or Conservator
it Other:
Signer is Representing:
02014 National Notary Association • www.NationaiNotary.org • 1-800-US NOTARY (1-800-876-6827) Item 05907
23C-18
EXTRACT FROM BY-LAWS OF THE COMPANIES
"Article V, Section 8, Attorneys -in -Fact. The Chief Executive Officer, the President, or any Executive Vice President or Vice President
may, by written instrument under the attested corporate seal, appoint attorneys -in -fact with authority to execute bonds, policies,
recognimces, stipulations, undertakings, or other like instruments on behalf of the Company, and may authorim any officer or any such
attomey-in-fact to affix the corporate seal thereto; and may with or without cause modify of revoke any such appointment or authority at any
time."
CERTIFICATE
I, the undersigned, Secretary of the ZURICH AMERICAN INSURANCE COMPANY, the COLONIAL AMERICAN CASUALTY
AND SURETY COMPANY, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, do hereby certify that the foregoing
Power of Attorney is still in full force and effect on the date of this certificate; and I do further certify that Article V, Section 8, of the By -
Laws of the Companies is still in force.
This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of
Directors of the ZURICH AMERICAN INSURANCE COMPANY at a meeting duly called and held on the 15th day of December 098.
RESOLVED: "That the signature of the President or a Vice President and the attesting signature of a Secretary or an Assistant Secretary
and the Seal of the Company may be affixed by facsimile on any Power of Attorney ... Any such Power or any certificate thereof bearing such
facsimile signature and seal shall be valid and binding on the Company."
This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of
Directors of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at a meeting duly called and held on the 51h day of
May, 1994, and the following resolution of the Board of Directors of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at a
meeting duly called and held on the IOth day of May, 1990.
RESOLVED: "That the facsimile or mechanically reproduced seal of the company and facsimile or mechanically reproduced signature
of any Vice -President, Secretary, or Assistant Secretary of the Company, whether made heretofore or hereafter, wherever appearing upon a
certified copy of any power of attorney issued by the Company, shall be valid and binding upon the Company with the same force and effect
as though manually affixed.
IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seals of the said Companies,
this 5th day of Apol 1 22020
R nw
o �•••..... Tb�
By: Brian M. Hodges
Vice President
TO REPORT A CLAIM WITH REGARD TO A SURETY BOND, PLEASE SUBMIT A COMPLETE DESCRIPTION
OF THE CLAIM INCLUDING THE PRINCIPAL ON THE BOND, THE BOND NUMBER, AND YOUR CONTACT
INFORMATION TO:
Zurich Surety Claims
1299 Zurich Way
Schaumburg, IL 60196.1056
www repoMfelaims(hurichna corn
800-626-4577
23C-19
ZURICH AMERICAN INSURANCE COMPANY
COLONIAL AMERICAN CASUALTY AND SURETY COMPANY
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That the ZURICH AMERICAN INSURANCE COMPANY, a corporation of the State of New
York, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, a corporation of the State of Illinois, and the FIDELITY
AND DEPOSIT COMPANY OF MARYLAND a corporation of the State of Illinois (herein collectively called the "Companies'), by
Robert D. Murray, Vice President, in pursuance of authority granted by Article V, Section 8, of the By -Laws of said Companies, which are
set forth on the reverse side hereof and are hereby certified to be in full force and effect on the date hereof, do hereby nominate, constitute,
and appoint William SYRKIN, Rebecca HAAS-BATES, Sergio D. BECHARA and Richard ADAIR, all of Irvine,
California, EACH, its true and lawful agent and Attomey-in-Fact, to make, execute, seal and deliver, for, and on its behalf as surety, and as
its act and deed: any and all bonds and undertakings, and the execution of such bonds or undertakings in pursuance of these presents,
shall be as binding upon said Companies, as fully and amply, to all intents and purposes, as if they had been duly executed and acknowledged
by the regularly elected officers of the ZURICH AMERICAN INSURANCE COMPANY at its office in New York, New York., the regularly
elected officers of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at its office in Owings Mills, Maryland., and the
regularly elected officers of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at its office in Owings Mills, Maryland., in their
own proper persons.
The said Vice President does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article V, Section 8, of
the By -Laws of said Companies, and is now in force.
IN WITNESS WHEREOF, the said Vice -President has hereunto subscribed his/her names and affixed the Corporate Seals of the said
ZURICH AMERICAN INSURANCE COMPANY, COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and
FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this I Ith day of June, A.D. 2019.
7 sa`��t.ei
sa,
ATTEST:
ZURICH AMERICAN INSURANCE COMPANY
COLONIAL AMERICAN CASUALTY AND SURETY COMPANY
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
By: Robert D. Murray
Vice Presidenl
By: Dawn E. Brown
Secretory
State of Maryland
County of Baltimore
On this I Ith day of June. A.D. 2019, before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, Robert D.
Murray, Vice President and Dawn E. Brown, Secretary of the Companies, to me personally known to be the individuals and officers described in and who
executed the preceding instmmen6 and acknowledged the execution of same, and being by me duly swom, depaseth and saith, that he'she is the said officer of
the Company aforessid, and that the seals affixed to the preceding instrument are the Corporate Sals of said Companies, and that the said Corporate Seals and
the signature as such officer were duly affixed and subscribed to the said insoutnent by the authority and direction of the said Corporations.
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above written.
unyq.
Constance A. Dunn, Notary Public
My Commission Expires: July 9, 2023
23C-20
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 20-6907
LOCAL STREET PREVENTATIVE MAINTENANCE FY 2019-20
LIST OF SUB -CONTRACTORS
Section 4100 et. seq. of the Public Contract Code requires listing of all subcontractors with the bid for all
subcontract work exceeding the following amount:
o Streets, highways including bridge projects: %s% of the bid or $10,000, whichever is greater
o Buildings, parks, or other projects: Y2% of the bid
Section 1725.5 of the Public Contract Code requires all Subcontractors be registered with the State
Department of Industrial Relations (DIR).
BIDDER proposes to subcontract certain portions of the work to the firms listed below:
Name Sul n
License #/Exp.
DIR Reg.#/Exp.
Location
Phone
Type Of Work
Amount $
Name j U V�
License #/Exp.
DIR Reg. #/Exp.
License #
Location (11
Phone
Type Of Work
Amount $ 4�!
Name
License #/Exp.
DIR Reg. #/Exp.
License #
Location
Phone
Type Of Work
Amount $
Signa in re ofBBidder
Edward J. Carlson, Vice President
b Name Y(1
> License #/Exp
l0 3O 22 DIR Reg. #/Exp
_f P-7 Location
Phone
Type Of Work
Amount $
License #/Exp.
DIR Reg. #/Exp.
License # _
Location _
Phone
Type Of Work
Amount $
Name
License #/Exp.
DIR Reg. #/Exp.
License # _
Location
Phone
Type Of Work
Amount $
CO -
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 20-6907
LOCAL STREET PREVENTATIVE MAINTENANCE FY 2019-20
REFERENCES
The following are the names, addresses, and telephone numbers for THREE public agencies for
which the BIDDER has performed similar work within the past three years.
1. City of Simi Valley 2929 Tapo Canyon Rd. Simi Valley, CA. 93063
Name and Address of Owner.
Sarah Sheshebor805-583-6792
Name and Telephone Number of person familiar with project.
$510.124.25 Street Rehabilitaiton 08/2019
Contract Amount
Type of Work
County of Ventura 501 Poli Street Ventura, CA. 93001
Name and Address of owner.
Christopher Solis 805-654-2054
Date Completed
Name and Telephone Number of person familiar with project.
%3 919 808 95 Resurfacing Project 12/2019
Contract Amount
Type of Work
3, City of Stanton 7800 Katella Avenue, Stanton CA. 90680
Name and Address of owner.
Guillermo Perez 714-890-4202
Name and Telephone Number of person familiar with project.
B3ilr:c�:I- ' I]
Contract Amount
Street Resurfacing
Type of Work
Date Completed
1212019
Date Completed
The following are the names, addresses, and telephone numbers of all brokers and sureties from
whom BIDDER intends to procure insurance and bonds.
Broker/ Surety: Fidelity and Deposit Company of Maryland- 777 S. Figueroa St. #3900 Los Angeles, CA. 90017 (213)207-0600
Agent: Millennium Corpoate Solutions- 5530 Trabuco Road Irvine, CA. 92620 (949) 857-4500
Insurance: Edgewood Partner's Insurance Center- 3633 Inland Empires Blvd. Suite 640 Ontario CA. 91764 (909)919-7513
_ cf
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 20-6907
LOCAL STREET PREVENTATIVE MAINTENANCE FY 2019-20
ADDITIONAL REFERENCES
The following are the names, addresses, and telephone numbers for THREE public agencies for
which the BIDDER or Subcontractor has performed similar work in the past five years.
1. City of Compton 205 S. Willowbrook Avenue, Compton CA. 90220
Name and Address of Owner.
.John Strictland (310)605-5505
Name and Telephone Number of person familiar with project.
$1,019,100.00 Road Repair 10/2019
Contract Amount Type of Work Date Completed
2, City of San Clemente 910 Calle Negocio San Clemente, CA. 92673
Name and Address of owner.
Darra Koger (949)361.3138
Name and Telephone Number of person familiar with project.
$384,405.00 Street Rehabilitaiton 1012019
Contract Amount Type of Work Date Completed
3, City of Fontana 8353 Sierra Avenue Fontana, CA. 92335
Name and Address of owner.
Kimberly Young (909)350-7632
Name and Telephone Number of person familiar with project.
$5,023,730.00
Contract Amount
Improvements
Type of Work
10/2019
Date Completed
The following are the names, addresses, and telephone numbers of all brokers and sureties from
whom BIDDER intends to procure insurance and bonds.
Broker/ Surety Fidelity and Deposit Company of Maryland-777 S. Figueroa St. #3900 Los Angeles CA. 90017 (213)270-0600
Millennium Corpoate Solutions- 5530 Trabuco Road Irvine, CA. 92620 (949) 857-4500
Insurance: Edgewood Partners Insurance Center- 3633 Inland Empire Blvd. Ontario CA. 91764 (909)919-7513
z3CL23
2019
PAST WORK REFERENCES
City of Simi Valley
2929 Tapo Canyon Rd.
Simi Valley, CA 93063
Contact: Sarah Sheshebor (805)583-6792
sshesheb[cD.sim ivallev. orq
County of Ventura
501 Poli Street
Ventura, CA 93001
Contact: Christopher Solis (805) 654-2054
ch ris. so I i sevent u ra. orq
City of Stanton
7800 Katella Avenue
Stanton, CA. 90680
Contact: Guillermo Perez (714) 890-4204
a perez(fti. stanton.ca. us
City of Compton
205 S. Willowbrook Avenue
Compton, CA. 90220
Contact: John Strictland (310) 605-5505
istrictlandCa)com ptoncity.orq
City of San Clemente
910 Calle Negocio
San Clemente, CA. 92673
Contact: Darra Koger (949) 361-3138
koaerDOsan-cemente. orq
City of South Gate
8650 California Avenue
South Gate, CA. 90280
Contact: John Rico (323) 563-9594
irlcoosogate.org
Simi Valley Minor Street Rehabilitation
Contract Amount: $510,124.25
Start Date: 07/2019
End Date: 08/2019
Yerba Buena Area Resurfacing Project
Contract Amount: $3,919,808.95
Start Date: 06/2019
End Date: 1212019
2019 Citywide Street Resurfacing
Contract Amount: $1,206,869.00
Start Date: 10/2019
End Date: 12/2019
Road Repair Service (Pothole Repair)
Contract Amount: $1,019,100.00
Start Date: 08/2019
End Date: 11/2019
Street Rehabilitation for S. Avenue LA
Esperanza
Contract Amount: $384,055.00
Start Date: 09/2019
End Date: 10/2019
Circle Park Driveway Project
Contract Amount: $268,576.00
Start Date: 06/2019
End Date: 09/2019
23C-24
2019
PAST WORK REFERENCES
Pardee Homes
1250 Corona Pointe Court, Ste. 600
Corona, CA. 92879
Contact: Nick Lasher (951) 428-4442
nick. lasher ali7.oardeehomes.com
City of Fontana
8353 Sierra Avenue
Fontana, CA. 92335
Contact: Kimberly Young (909) 350-7632
kyoun-g(&fo nta na. o ro
DR Horton
2280 Wardlow Circle Ste. 100
Corona, CA. 92880
Contact: Keith Alex (951) 830-5872
kalex0drhorton.com
City of Ontario
2201 Dupont Dr. #300
Irvine, CA. 92612
Contact: Kavous Emami (909) 628-6234
Irvine Community Development Company
550 Newport Center Dr. Ste. 550 B2
Newport Beach, CA. 92660
Contact: Mike Morse (949) 720-2560
City of Downey
11111 Brookshire Avenue
Downey, CA. 90241
Contact: Desi Gutierrez, (562) 904-7110
dg utierradownevca. o ro
Railroad Canyon Widening
Contract Amount: $5,062,746.00
Start Date: 11/2018
End Time: 08/2019
Citrus Avenue Improvements
Contract Amount: $502,730.00
Start Date: 08/2018
End Date: 10/2019
Singlton Road
Contract Amount: $1,684,000.00
Start Date: 07/2018
End Date: 12/2019
Eucalyptus Street Improvements
Contract Amount: $1,580,580.00
Start Date: 3/2018
End Date: 10/2019
Portola Springs PA-6 Enclave 5B Phasel, 2
Contract Amount: $2,055,055.00
Start Date: 09/2018
End Date: 12/2019
FY 18/19 Slurry Seal Project
Contract Amount: $313,425.87
Start Date: 06/2019
End Date: 1212019
23C-25
2019
PAST WORK REFERENCES
City of Chino
PO Box 667
Chino, CA. 91708
Contact: Dustin Postovoit (909) 334-3415
apostovoit(Mcitvofchino. oro
City of Lancaster
44933 Fern Avenue
Lancaster, CA. 93534
Contact: Greg Wilson (661) 570-8003
gwilson aacitvoflancasterca.org
City of Colton
650 N. La Cadena Dr.
Colton, CA. 92324
Contact: Victor Ortiz (909) 370-5099
vortiz@coltonca.gov
City of Cathedral City
68700 Ave Lalo Guerrero
Cathedral City, CA. 92234
Contact: John A. Corella (760) 770-0349
4corell a0cathedralcity. pov
City of San Clemente
910 Calle Negocio
San Clemente, CA. 92673
Contact: Gary Voborsky (949) 361-6132
voborskvo0san-Clemente. ora
County of Orange
300 N. Flower Street
Santa Ana, CA. 92703
Contact: Stephen Clayton (714)955-0206
Stephen. clavtonCo)ocpw. ocaov. com
Slurry Seal Maintenance Work
Contract Amount: $372,805.00
Start Date: 112019
End Date: 12/2019
2018 Pavement Management Program
Contract Amount: $2,720,103.65
Start Date: 3/2019
End Date: 12/2019
FY 18-19 Asphalt Paving Project
Contract Amount: $1,377,700.00
Start Date: 3/2019
End Date: 1112019
Ortega Road Widening
Contract Amount: $459,998.00
Start Date: 2/2019
End Date: 12/2019
Arterial Street Pavement Maintenance
Contract Amount: $1,187,187.00
Start Date: 312019
End Date: 712019
JOC Pavement Maintenance
Contract Amount: $4,500,000
Start Date: 07/2019
End Date: 10/2019
23C-26
2019
PAST WORK REFERENCE
City of Lake Elsinore SB-1 Lincoln St Pavement Rehabilitation
130 S. Main Street Contact Amount: $833,360.00
Lake Elsinore, CA. 92530 Start Date: 6/2019
Contact: Nicole McCalmont (951) 674-3124 End Date: 10/2019
n mcalmont(&Iake-elsi nore. oro
City of Inglewood
One W. Manchester Blvd
Inglew000d, CA. 90301
Contact: Lea Reis (323) 260-4703
Ireise,koacoro.com
North La Brea Avenue
Contract Amount: $4,540,992.20
Start Date: 11/2018
End Date: 12/2019
23C-27
PAST WORK REFERENCES
2018
City of Moreno Valley
14177 Frederick St.
P.O. Box 88005
Moreno Valley, CA 92552.
Contact: Henry Ngo, P.E.. (951) 413-3106
henryii(i moval.org
City of Aliso Viejo
12 Journey Street Ste # 100
Aliso Viejo, CA 92656
Contact: Mari Shakir, (949) 425-2556
M shaki rc i tvgfa l isoviejo.c om
City of Laguna Niguel
30111 Crown Valley Parkway
Laguna Niguel, CA 92677
Contact: Frank Borges, (949) 632-4300
FBot'Us ci?citvollaeunauiguel.oro
City of Jurupa Valley
8304 Limonite Avenue Suite M
Jurupa Valley, CA 92509
Contact: Chase Keys, (951) 332-6464
ckeysnnjurupavalley.ore
City of Irwindale
5050 N. lnvindale Avenue
lnvindale, CA 91706
Contact Richard Cotpis, (626) 430-2200
rcorpis(c nkvndakeCA.eov
Allessandro Blvd, Street Improvements at
Chogall Court and Graham Street
Contract Amount: $445,821.50
Start: 05/2018
Complete: 1 1 /2018
Aliso Creek and Road Rehab
Contract Amount: $657,770.00
Start: 05/2018
Complete: 10/2018
FY 17-18 Alicia Parkway Arterial Pavement
Rehab
Contract Amount: $2,211,700.00
Start: 08/2018
Complete: 11 /2018
Van Buren Blvd. Pavement Rehab PH2
Contract Amount: $781,845.00
Start: 08/2018
Complete: 09/2018
Irwindale 2017-2018 Resurfacing Project
Contract Amount: $285,503.10
Start: 07/2018
Complete: 08/2018
County of Los Angeles Pine Canyon Road
P.O. Box 7508 Contract Amount: $3.288,999.00
Alhambra, CA 91802 Start: 06J2018
Contact: Hoda Hassan, (626) 458-3144 Complete: 11/2018
HHA SSAN;r"i^dpw.lacountov
23C-28
PAST WORK REFERENCES
2018
City of Rolling Hills Estates
2017-18 Street Resurfacing Project
4045 Palos Verdes Drive
Contract Amount: $1,203,292.50
Rolling Hills Estates, CA 90274
Start: 03/2018
Contact: Scott Gibson (909) 210-0548
Finish: 09/2018
n oasrlh -men .com_
City of Huntington Beach Heil and Main Street
2000 Main Street Contract Amount: $2,285,562.00
Huntington Beach, CA 92648 Start: 11/2017
Contact: Jim Escutia (714) 536-5525 Finish: 06/2018
ksculia/it)surfc�
City of Fontana Valley Blvd. Median Improvement Project
8353 Sierra Avenue Contract Amount: $164,715.00
Fontana, CA 92335 Start: 03/2018
Contact: Jazmine Pena (909) 350-6648 Finish: 05/2018
jpenafa�fontana oig
City of Lake Forest Bake Parkway at Trabuco Road
25550 Commercentre Drive Contract Amount: $121,621.00
Lake Forest, CA 92630 Start: 02/2018
Contact: Taylor Abernathy, (949) 461-3490 Finish: 06/2018
tabernathy crAakeforestca.eov
City of La Quinta Contact: Ubaldo Ayon Jr., (760)777-7051
74-495 Calle Tampico FY 16-17 Phase 2 Desert Club
La Quinta, CA 92253 Contract amount: S697,474.76
uavon ada- uinta.orc Start date: 06/2017
Finish date 12/2017
City of Canyon Lake Slurry Seal FY 2017-2018 Railroad Canyon/
31516 Railroad Canyon Road Canyon Lake Drive
Canyon Lake, CA 92587 Contract amount $263,241.63
Contact: Kenneth Bailey, (951) 244-2955 Start date: 03/2018
kennethbailevi(tcaa1)rotessionaIs.coin Finish date: 12/20t8
23C-29
PAST WORK REFERENCES
2018
City of Newport Beach
100 Civic Center Drive
Newport Beach, CA 92660
Contact: Alfred Castanon, (949) 644-3314
AC astanon(a:) i ie%vkortbeaehca.
Town of Apple Valley
14955 Dale Evans Parkway
Apple Valley, CA 92307
Contact: Rich Berger, (760) 240-7000 ext 7530
rbereertr7i annlevalley.oro
West Coast Highway Landscape Improvements,
Phase 1, Contract No. 7189-1
Contract amount: $604,284.50
Start date: 0612018
Finish date: I 1 /2018
Navajo Road Rehabilitation
Contract amount: $849.182.00
Start date: 0712017
Finish date: 12/2017
City of Indian Wells Cook Street Rubberized Pavement Overlay
44-950 Eldorado Drive Contract amount: $599,599.59
Indian Wells, CA 92210 Start date: 05/2018
Contact: Ken A. Seumalo, P.E., (760) 346-2489 Finish date: 12/2018
ksenmaloiCl)Indiall Wells.com
23C-30
PAST WORK REFERENCES
2017
City of Rancho Cucamonga
10500 Civic Center Drive
Rancho Cucamonga, CA 91730
Contact: Romeo David, (909)477-2740
Rorneo.DavidC,cityofrc us
City Of Temecula
41000 Main Street
Temecula, CA 92590
Contact: William Becerra, (951)694-6444
Will. bece rra (c—otemecula.gov
Town Of Apple Valley
14955 Dale Evans Pkwy
Apple Valley, CA 92307
Contact: Rich Berger, (760)240-7000
rbereer@dopleyallev.org
City Of Victorville
14343 Civic Dr.
Victorville, CA 92392
Contact: Carlos Seanez, (760)955-5162
cseanez @victorvilleca.6oy
Base Line Rd, pavement Rehab.
Contract Amount: $1,130,470
Start: 05/2017
Completed: 07/2017
Margarita Road Pavement
Rehab
Contract Amount: $2,577,770
Start: 05/2017
Completed: 11/2017
Navajo Road Rehabilitation
Contract Amount: $849,182
Start: 08/2017
Completed: 11/2017
Water Warehouse H1 Paving
Project
Contract Amount: $251,008
Start Date: 04/2017
Completed: 06/2017
City Of Santee Citywide Slurry Seal & Roadway
10601 Magnolia Ave Building 4 Maintenance 2017
Santee, CA 92071 Contract Amount: $285,061.90
Contact: Toby M. f_spinola, P.E., (619)258.4100 Start: 06/2017
tobyespinola@cityof;anteeca.nov Completed:10/2017
23C-31
PAST WORK REFERENCES
2017
City Of Yucaipa
34272 Yucaipa Blvd.
Yucaipa, CA 92399
Contact: John Larose,(909)797-2489
Ilarose@yucaipa.org
City Of West Covina
Eclipse Way & Jennifer PI
West Covina, CA 91792
Contact: Hany Demitri, (626)939-8445
Hany.DemltriPwestcoyina.goV
2015-2016 Micro -Surfacing
Program Project No.11043
Contract Amount: $252,379.06
Start: 07/2017
Completed: 08/2017
Residential Street Rehabilitation
SP 17038
Contract Amount: $469,960.70
Start: 05/01/17
Completed: 06/09/2017
City Of Highland 2015-16 CDBG Streets Pavement
McKinley Ave & 9`h St Improvements
San Bernardino, CA 92410 Contract Amount: $823,389.68
Contact Name: Carlos Zamano, (909)864-8732 Start: 06/05/17
czamano cityofhighland.org Completed:10/13/17
County Of Riverside Gilman Springs
2950 Washington Street Contract Amount: $1,662,671.20
Riverside, CA 92504 Start: 11/2016
Contact Name: Justin Robbins, (951)955-6885 Completed: 08/2017
JROBBINS@rctlma.org
City Of Palm Springs Taxiway J Rehabilitation
3400 E. Tahquitz Cyn Way Ste 1 Contract Amount: $291,482.99
Palm Springs, CA 92262 Start: 09/2017
Contact Name: Robert Denning, (541)324-7321 Completed: 10/2017
Robe rt.denning @0aecom.com
23C-32
PAST WORK REFERENCES
2016
City of Riverside 2014/2015 Preservation and Maintenance
3900 Main St. Contract Amount: $3,400,725.00
Riverside, CA 92501 Start: 012016
Contact: Steve Howard, (951)826-5708 Completed: 06/2016
City of Rancho Santa Margarita
2212 El Pasco
Rancho Santa Margarita, CA 92688
Contact: Max Maximous, (949)635-1800
City of Diamond Bar
21810 Copley Drive
Diamond Bar, CA 91765
Contact: Kimberly Young, (909) 839-7044
City of Bell
6330 Pine Avenue
Bell, CA 90201
Contact: Dahi Kim. (323)923-2628
Department of "rransportation
72-800 Dinah Shore Dr. Ste. 104
105 Palm Desert, CA 92211
Contact: Khoi Vu, (951) 232-6263
Department of Transportation
3251 '/C University Dr. Trailer No. 2
Irvine, CA 92612
Contact: Peter Shieh, (949)279-8636
City of Victorville
14343 Civic Drive
Victorville, CA 92392
Contact: Bruce Miller, (760) 269-0045
Annual Residential Overlay
Contract Amount: $245.190.00
Start: 0112016
Completed: 09/2016
Grand Ave. Beautification Project
Contract Amount: $1,939,000.00
Start: 08/2015
Completed: 0512016
Florence Avenue Overlay
Contract Amount: $643,000.00
Start: 04/2016
Completed: 092016
Route I11, Contract No. 08-IC4604
Contract: $1,536,207.00
Start: 04/2016
Completed: 0912016
Route 73, Contract No. 12-OM 1104
Contract Amount: $1,545,163.00
Start: 4/2015
Completed: 07/2016
Bear Valley Road Reconstruction
Contract Amount: $2,611,215.00
Start: 04/2016
Completed: 0712016
23C-33
PAST WORK REFERENCES
2016
City of Perris
101 N. D Street
Perris, CA 92570
Contact: Brad Brophy, (951)943-6504
City of Palos Verdes Estates
340 Palos Verdes Drive West
Palos Verdes Estates, CA 90274
Contact: Ken Rukavina, (310)378-0383
City of Newport Beach
100 Civic Center Drive
Newport Beach, CA 92660
Contact: Alfred Castanon, (949)644-3314
City of Newport Beach
100 Civic Center Drive
Newport Beach, CA 92660
Contact: Frank Tran, (949)644-3340
City of Aliso Viejo
12 Journey, Suite 100
Aliso Viejo, CA 92656
Contact: Chris Tame, (949)425-2531
4" Street Improvement Project
Contract Amount: $545,680.00
Start Date: 03/2016
Completed: 07/2016
FY 15-16 St. Resurfacing & Slurry Seal Project
Contract Amount: $876,455.00
Start: 1 1 /2015
Completed: 06/2016
Corona Del Mar Entry Improvements
Contract Amount: $497,497.00
Start Date: 02/2016
Completed: 05/2016
Cameo Shores Pavement Reconstruction
Contract Amount: $3,363,363.00
Start Date: 06/2016
Completed: 12/2016
Pacific Park Rehab. -Chase to 73 Fwy
Contract Amount: $633,633.00
Start Date: 10/2016
Completed: 12/2016
23C-34
PAST WORK REFERENCES
2015
City of Hawthorne
4455 W. 162i' Street
Hawthorne, CA 902.50
Contact: Heecheol Kwon, (310) 349-2980
City of Inglewood
One Manchester Blvd, 3' Floor
Inglewood, CA 90301
Contact: Hunter Nguyen, (310) 412-4252
County of Ventura
800 S. Victoria Ave
Ventura, CA 93009
Contact: Jeewoong Kim, (805) 654-3987
City of Montclair
51 1 1 Benito Street
Montclair, CA 91763
Contact: Steve Stanton, (909) 625-9444
Hawthrone Blvd Reconstruction
Contract Amount: $12,579,000.00
Start: 4/2014
Completed: 5/2015
Florence Ave
Contract Amount: $2.639,000.00
Start: 4/2015
Completed: 10/2015
Pavement Resurfacing, Phase II
Contract Amount: $2,401,970.00
Start: 4/2Q 15
Completed: 10/2015
Northeast Montclair Street Rehabilitation
Contract Amount: $514,150.00
Start: 4/2015
Completed: 7/2015
Riverside County Transportation Commission Route 74 Widening
4080 Lemon Sweet, Pt Floor Contract: $1,970,004.00
Riverside, CA 92501 Start: 4/2014
Contact: Bill Seitz, (949) 300-9132 Completed: 7/2015
City of Riverside
3900 Main Sweet
Riverside, CA 92501
Contact: Steve Howard, (951) 826-5708
Long Beach Unified School District
2201 E. Market Street
Long Beach, CA 92805
Contact: Nancy Chinchilla, (562) 997-7513
2014115 Arterial Streets
Contract Amount: $1,683,076.00
Start: 4/2015
Completed: 9/2015
Garfield Elementary School Pavement
Contract Amount: $1,976,508.00
Start: 6/2015
Completed: 1 1 /2015
23C-35
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 20-6907
LOCAL STREET PREVENTATIVE MAINTENANCE FY 2019-20
NON -COLLUSION AFFIDAVIT
(Title 23 United States Code Section 112 and Public Contract Code Section 7106)
In conformance with Title 23 United States Code Section 112 and Public Contract Code 7106 the
BIDDER declares that the bid is not made in the interest of, or on behalf of, any undisclosed
person. partnership, company, association, organization, or corporation; that the bid is genuine
and not collusive or sham; that the BIDDER has not directly or indirectly induced or solicited
any other BIDDER to put in a false or sham bid, and has not directly or indirectly colluded,
conspired, connived, or agreed with any BIDDER or anyone else to put in a sham bid, or that
anyone shall refrain from bidding; that the BIDDER has not in any manner, directly or indirectly,
sought by agreement, communication, or conference with anyone to fix the bid price of the
BIDDER or any other BIDDER, or to fix any overhead, profit, or cost element of the bid price,
or of that of any other BIDDER, or to secure any advantage against the public body awarding the
contract of anyone interested in the proposed contract; that all statements contained in the bid are
true; and, further, that the BIDDER has not, directly or indirectly, submitted his or her bid price
or any breakdown thereof, or the contents thereof, or divulged information or data relative
thereto, or paid, and will not pay, any fee to any corporation, partnership, company association.
organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham
bid.
Note: The above Non -collusion Affidavit is part of the Proposal. BIDDERS are
cautioned that making a false certification may subject the certifier to criminal
prosecution.
Signed
State of California
County of Riverside
Subscribed and sworn to (or
person(s) who appeared befoi
Notary Public
K'me on this day of
on the basis of satisfactory
Notary Public Seal
20�, by
evidence to be the
P-I I of P I7
23C-36
CALIFORNIA JURAT GOV CODE § 8202
A notary public or other officer completing this certificate verges only the identity of the individual who signed the
document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
State of California
County of Riverside
-------------
KENONA NAZARI
Natary Public - Calil mla
0AY
Riverside County
Canmission N 2319601
Comm. Expires Jan 10, 2024
Place Notary Seal Above
Subscribed and sworn to (or affirmed) before
me on this 9th day of Aoril . 2020
Date Month
By (1) Edward J. Carlson
Name of Signer
Proved to me on the basis of satisfactory evidence
be the person who appeared before me (.) (,)
(and
(2)
Name of Signer
Proved to me on the basis of satisfactory evidence
be the person who appeared before me.)
l
Signature
l Signature of Nota ublic
OPTIONAL
Though the information below is not required by law, it may prove
valuable to person relying an the document and could prevent
fraudulent removal and reattachment of this form to another document.
Further Description of Any Attached Document
Title or Type of Document Non -Collusion Aff Santa Ana
Document Date: 4-9-2020 Number of Pages: 1
Signer(s) Other Than Named Above:
Top of thumb here
Top of mumb nem
23C-37
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 20-6909
LOCAL STREET PREVENTATIVE MAINTENANCE FY 2019-20
NON-DISCRIMINATION CERTIFICATE
The undersigned contractor or corporate officer, during the performance of this contract, certifies
as follows:
1. The Contractor shall not discriminate against any employee or applicant for employment
because of race, color, religion, sex, or national origin. The Contractor shall take affirmative
action to ensure that applicants are employed, and that employees are treated during
employment without, regard to their race, color, religion, sex, or national origin. Such action
shall include, but not be limited to, the following: employment, upgrading, demotion, or
transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other
forms of compensation; and selection for training, including apprenticeship. The Contractor
agrees to post in conspicuous places, available to employees and applicants for employment,
notices to be provided setting forth the provisions of this nondiscrimination clause.
2. The Contractor shall, in all solicitations or advertisements for employees placed by or on
behalf of the Contractor, state that all qualified applicants will receive consideration for
employment without regard to race, color, religion, sex, or national origin.
3. The Contractor shall send to each labor union or representative of workers with which he/she
has a collective bargaining agreement or other contract or understanding, a notice to be
provided advising the said labor union or workers' representatives of the Contractor's
commitments under this section, and shall post copies of the notice in conspicuous places
available to employees and applicants for employment.
4. The Contractor shall comply with all provisions of Executive Order 11246 of September 24,
1965, and of the rules, regulations, and relevant orders of the Secretary of Labor.
5. The Contractor shall furnish all information and reports required by Executive Order 11246
of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or
pursuant thereto, and will permit access to his/her books, records, and accounts by the
administering agency and the Secretary of Labor for purposes of investigation, to ascertain
compliance with such rules, regulations, and orders.
6. In the event of the Contractor's non-compliance with the nondiscrimination clauses of this
contract or with any of the said rules, regulations, or orders, the contract may be canceled,
terminated, or suspended in whole or in part and the Contractor may be declared ineligible
for further Government contracts or federally assisted construction contracts in accordance
with procedures authorized in Execution Order 11246 of September 24, 1965, and such other
sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of
September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or as
otherwise provided by law.
5
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 20-6907
LOCAL STREET PREVENTATIVE MAINTENANCE FY 2019-20
The Contractor shall include the portion of the sentence immediately preceding paragraph (1)
and the provisions of paragraphs (1) through (7) in every subcontract or purchase order
unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to
Section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be
binding upon each subcontract or purchase order as the administering agency may direct as
means of enforcing such provisions, including sanctions for noncompliance; provided,
however, that in the event the Contractor becomes involved in, or is threatened with,
litigation with a subcontractor or vendor as a result of such direction by the administering
agency, the Contractor may request that the United States enter into such litigation to protect
the interests of the United States.
8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats. 1939, and as
amended, no discrimination shall be made in the employment of persons upon public works
because of race, religious creed, color, national origin, ancestry, physical handicaps, mental
condition, marital status, or sex of such persons, except as provided in Section 1420, and any
contractor of public works violating this Section is subject to all the penalties imposed for a
violation of the Chapter.
Signed: ���• �r
Title: Edward J. Carlson, Vice President
Firm: All American Asphalt
Date: 0 H 10 q�/ 2.0 ZO
�k1'1) 6
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 20-6907
LOCAL STREET PREVENTATIVE MAINTENANCE FY 2019-20
STATEMENT REGARDING APPRENTICESHIP REQUIREMENTS
The undersigned BIDDER is familiar with the requirements of Section 1777.5 of the State Labor
Code regarding employment of apprentices, and understands that contractors on contracts
exceeding $30,000 or 20 working days shall:
Apply to the joint apprenticeship committee administering the apprenticeship standards of
the craft or trade in the area of the site of the public work for a certificate approving the
contractor under the apprenticeship standards for the employment and training of apprentices
in the area or industry affected.
2. Employ the number of apprentices or the ratio of apprentices to journeymen stipulated in the
apprenticeship standards.
3. Contribute to the fund or funds in each craft or trade in which he/she employs journeymen or
apprentices on the public work, in the same amount or upon the same basis and in the same
manner as the other contractors, except contractors not signatory to the trust agreement shall
pay a like amount to the California Apprenticeship Council.
Signed:
Title: Edward J. Carlson, Vice President
Firm: All American Asphalt
Date: 0 g l e 7 2,0
�Jlb� 46
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 20-6907
LOCAL STREET PREVENTATIVE MAINTENANCE FY 2019-20
STATEMENT REGARDING "ANTI -KICKBACK" REQUIREMENTS
The undersigned is submitting this proposal for performing by contract the work required by
these bid documents, agrees to comply with the Copeland "Anti -Kickback" Act (18 USC 74) as
supplemented in the Department of Labor regulations (29 CFR, Part 3). This act provides that
each contractor or subcontractor shall be prohibited from inducing, by any means, any person
employed in the construction or repair of public work, to give up any part of the compensation to
which he/she is otherwise entitled.
Signed:
Title: Edward J. Carlson, Vice President
Firm: All American Asphalt
Date: 0� 7o 20
fjdf p y
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 20-6907
LOCAL STREET PREVENTATIVE MAINTENANCE FY 2019-20
PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE
In conformance with Public Contract Code Section 10162, the BIDDER shall complete,
under penalty of perjury, the following questionnaire:
Has the BIDDER, any officer of the BIDDER, or any employee of the BIDDER who has a
proprietary interest in the BIDDER, ever been disqualified, removed, or otherwise prevented
from bidding on, or completing a federal, state, or local government project because of a
violation of law or a safety regulation?
Yes No X
If the answer is yes, explain the circumstances in the following space
L ?1lr f a
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 20-6907
LOCAL STREET PREVENTATIVE MAINTENANCE FY 2019-20
STATEMENT REGARDING COMMUNITY WORKFORCE AGREEMENT (CWA)
REQUIREMENTS
This is to certify that the undersigned BIDDER, and subcontractors, have read and understood
the CWA entered into by and between the City of Santa Ana, the Los Angeles/Orange Counties
Building and Construction Trades Council, and the signatory Craft Councils and Local Unions,
effective as of September 1, 2017. The CWA is available at:
http://wwtiv.santa-ana.orglpwa/documents/C WA.pdf
The undersigned BIDDER hereby agrees to comply with all terms and conditions of the CWA,
and is capable of completing construction of the project continuously, and without interruptions
or delays. If awarded any work covered by the CWA, BIDDER will also be required to sign the
Letter of Assent that appears as Attachment A to the CWA.
Signed: ZN�
T
Title: Edward J. Carlson, Vice President
Title: All American Asphalt
Date: ANlD9 %2�ZlJ
2Jr1-1) t
CITY OF SANTA ANA EXHIBIT 3
CONSTRUCTION CONTRACT
PROJECT NO.20-6907
LOCAL STREET PREVENTATIVE MAINTENANCE FY 2019-20
This CONSTRUCTION CONTRACT is made and entered into this 19t' day of May, 2020 by and between
the City of Santa Ana, California, a charter city and municipal corporation organized and existing under
the Constitution and laws of the State of California (hereinafter "CITY"), and All American Asphalt
(hereinafter "CONTRACTOR").
WII'NESSETH:
The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows:
1. CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and
expense necessary to construct and complete in a good and workmanlike manner and to the satisfaction
of the City Engineer of the CITY, the Local Street Preventative Maintenance FY 2019-20 Project
(hereinafter referred to as the "WORK OF IMPROVEMENT") identified in and in accordance with
the Contract Documents prepared by the City's Public Works Agency and approved by the City
Council.
2. The complete Construction Contract consists of the "Contract Documents" as defined by the Standard
Specifications for Public Works Construction and which include the following:
• Notice Inviting Bids
• Information to Bidders
• Bid Proposal
• Bid Bond
• Contract Form
• Contract Bonds
• General Provisions
• Special Provisions
• Technical Provisions and Project Plans
• Community Workforce Agreement
• Appendices
In case of conflict between the Contract Documents, the precedence of documents shall be as
established in the Standard Specifications for Public Works Construction.
3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the WORK OF
IMPROVEMENT the sum total amount not to exceed One Million Nine Hundred Eighty-four
Thousand Five Hundred Eighty -Eight Dollars and No Cents ($1,984,588.00), as set forth and
identified in the BID PROPOSAL, which is attached hereto and incorporated herein as Exhibit "A."
The BID PROPOSAL contains a schedule of unit price(s) or lump sum(s) based on approximate
quantities only, and the City does not expressly or by implication agree that the actual amount of work
will correspond therewith, but reserves the right to increase or decrease the amount of any class or
portion of the work or to omit portions of the work as may be deemed necessary or advisable.
rev. 09/01/2017 23C-4 4 Page 1 of 3
4. CONTRACTOR agrees to complete the WORK OF IMPROVEMENT within the time specified in
the Time for Completion of Improvements section of the BID PROPOSAL (Exhibit "A") including
commencing construction within the timeframe therein specified after issuance of allotice to Proceed.
The CONTRACTOR will pay, and will require all subcontractors to pay, all employees on the WORK
OF IMPROVEMENT a salary or wage at least equal to the prevailing salary or wage established for
such work as set forth in the wage determinations for this work in accordance with applicable State
and Federal law.
6. If applicable, the CONTRACTOR shall adhere to the CITY'S Community Workforce Agreement
(CWA), a pre -hire collective bargaining agreement, which establishes the labor relations policies and
procedures for CONTRACTOR to follow in the crafts persons employed to complete the WORK OF
IMPROVEMENT as more fully described in the CWA. The CWA may be found on the City's website
at:
http://www.santa-ana.org/pwa/documents/CWA.vd
7. CONTRACTOR shall, after award of this Contract, furnish two bonds to be approved by the CITY,
one in the amount of One Hundred Percent (100%) of the Contract price, to guarantee the faithful
performance of the work (Performance Bond), and one in the amount of One Hundred Percent (100%)
of the Contract price to guarantee payment of all claims for labor and materials furnished (Payment
Bond). This Contract shall not become effective until such bonds are supplied to and approved by the
CITY.
8. CONTRACTOR shall, prior to the release of the performance and payment bonds or the retention
payment, furnish a warranty performance and payment bond (Warranty Bond). Said Warranty Bond
shall also be required as a condition of project acceptance. For projects up to Five Hundred Thousand
Dollars ($500,000), the Warranty Bond amount shall be the greater of Ten Thousand Dollars ($10,000)
or Twenty Percent (20%) of the final contract price. For projects above Five Hundred Thousand
Dollars ($500,000), the Warranty Bond amount shall be the greater of One Hundred Thousand Dollars
($100,000) or Ten Percent (10%) of the final contract price.
9. CONTRACTOR shall, after award of this Contract, furnish Certificates of Liability Insurance and
Worker's Compensation Insurance as outlined in the General Provisions, to be approved by the CITY.
23C-45 Page 2 of 3
IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the day and
year first above written.
ATTEST:
DAISY GOMEZ
Clerk of the Council
APPROVED AS TO FORM:
SONIA R. CARVALHO
City Attorney
By. K" TA�L
J FUNK
Assistant City Attorney
RECOMMENDED FOR APPROVAL:
NABIL SABA, PE
Executive Director
Public Works Agency
CITY OF SANTA ANA
KRISTINE RIDGE
City Manager
CONTRACTOR:
All American Asphalt
NAME: M)CtIT1 FftQV-ftS
TITLE: AG4'w�
23C-46
Page 3 of 3
City of Santa Ana
Page t
Local Street Preventative Maintenance FY 19120 (Project 20-6907), bidding on April 14, 2020 2:00 PM (Pacific)
Primed 042412020
Bid Results
EXHIBIT A
Bidder Details
Vendor Name All American Asphalt
Address 400 E. Sixth Street
Corona, CA 92879
United States
Respondee Jim McGee
Respondee Title Project Manager
Phone 951-736-7600 Ext.
Email publicworks@allamericanasphalt.com
Vendor Type CADIR
License 4 267073
CA DIR
Bid Detail
Bid Format Electronic
Submitted April 14, 2020 1:50:06 PM (Pacific)
Delivery Method
Bid Responsive
Bid Status Submitted
Confirmation 4 206470
Ranking 0
Respondee Comment
Buyer Comment
Attachments
File Title
File Name
File Type
Bid Documents- All American Asphalt
Local Street Preventative Maintenance Bid Documents.pdf
General Forms
Ownership Affidavit- All American Asphalt
Local Street Preventative Maintenance Ownership
Ownership Affidavit (Notary
Affidavit.pdf
Public) - REQ Original Hard
Copy Submittal in Addition
Bid Bond- All American Asphalt
Local Street Preventative Maintenance Bid Bond.pdf
Bid Bond Guaranty (Notary
Public) - REQ Original Hard
Copy Submittal in Addition
Non -Collusion Affidavit- All American Asphalt
Local Street Preventative Maintenace Non Collusion
Non -Collusion Affidavit
Affidavit.pdf
(Notary Public) - REQ Original
Hard Copy Submittal in
Addition
Line Items
Type
Item Code
UOM
Oty
Unit Price
Line Total Comment
Base Bid Items
1
Unclassified Excavation*
CY
740
$145.00
$107,300.00
2
Cold Milling (1.5'-T')*
SF
254300
50.30
$76,290.00
3
Cold Milling (5)*
SF
11800
51.00
$11,800.00
23Ili.fs.47
City of Santa Ana
Page 2
Local Street Preventative Maintenance FY 19120 (Project 20-6907), bidding
on April 14, 2020
2:00 PM (Pacific)
Primed 042412020
Bid Results
EXHIBIT A
Type
Item Code UOM
Qty
Unit Price
Line Total
Comment
4
Asphalt Concrete (AC Pavement)*
TN
3570
$73.00
$260,610.00
5
Rubberized Emulsion Aggregate Slurry (REAS) Type II*
TN
1600
$630.00
$1,008,000.00
6
Construct PCC Curb & Gutter (A-2-6)*
LF
1080
$45.00
$48,600.00
7
PCC Curb Ramp*
SF
6300
$10.00
$63,000.00
8
Construct PCC sidewalk (T=4")*
SF
3310
56.80
$22,508.00
9
PCC Cross Gutter*
SF
12800
$16.00
$204,800.00
10
Root Shave*
EA
32
$370.00
$11,840.00
11
Adjust Manhole Frame & Cover to Finished Grade
EA
24
$600.00
$14,400.00
12
Adjust Water Valve Frame & Cover to Finished Grade
EA
49
$600.00
$29,400.00
13
Crack Sealing
LS
1
$52,000.00
$52,000.00
14
Protection of Surface Utility Frames and Covers
LS
1
$1,500.00
$1,500.00
15
Remove Existing Striping, Pavement Legends, and Markers
LS
1
$18,900.00
$18,900.00
16
Furnish & Install Traffic LoopS Type E
EA
4
$455.00
$1,820.00
17
Signing & Striping
LS
1
$38,300.00
$38,300.00
18
Project Advertisement Sign
LS
2
$760.00
$1,520.00
19
Labor Agreement Oversight
LS
1
$12,000.00
$12,000.00
Subtotal
$1,984,588.00
I23Q.48
City of Santa Ana
Page 3
Local Street Preventative Maintenance FY 19120 (Project 20-6907), bidding on April 14, 2020 2:00 PM (Pacific) Primed 042412020
Bid Results
EXHIBIT A
Type Item Code UOM Qty Unit Price Line Total Comment
Asterisk Notes (Per Section 3-2 of Standard Specifications) - NOT part of Total Bid Calculation
20 * = The quantity for this bid item is shown for bid comparison only. This bid item shall not be subject to the "25%" limit as stated in Section 3-2 of the
Standard Specifications. This bid item shall not be subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual
amount for this item will be dictated by the actual quantitiy used, and the Agency reserves the right to increase or decrease the quantity of this item
accordingly.
EA 0 0 0
21 t = This bid item is considered a Specialty Item per Section 2-3.2 of the Standard Specifications.
EA 0 0 0
Subtotal 0
Total $1,984,588.00
23Q.49
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 20-6907 EXHIBIT A
LOCAL STREET PREVENTATIVE MAINTENANCE FY 2019-20
The lowest responsible bidder shall be selected based on the total base bid. The City reserves the
right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any).
* The quantity for this bid item is shown for bid comparison only. This bid item shall not be
subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual
amount for this item will be dictated by the actual quantity used, and the Agency reserves the
right to increase or decrease the quantity of this item accordingly.
f This bid item is considered a Specialty Item per Section 2-3.2 of the Standard Specifications.
TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES
The undersigned bidder hereby proposes to complete the Work for the total base bid amount
shown above, within eighty (80) working days after the commencement date stated in the Notice
to Proceed.
The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the
Standard Specifications, shall be $4,000 per calendar day.
Name of Firm All American Asphalt
Signature of BIDDER
Title Edward J. Carlson, Vice President
(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
Corporation, All American Asphalt
Mark Luer, President
Edward J. Carlson, Vice President
Michael Farkas, Secretary
COST ANALYSIS
CONSTRUCTION OF THE PROJECT NO. 20-6907: LOCAL STREET
PREVENTATIVE MAINTENANCE FY 2019-20
Construction Contract
$
1,984,588.00
Contract Administration, Inspection and Testing
$
298,000.00
Contingencies
$
492,412.00
TOTAL ESTIMATED CONSTRUCTION COSTS
$
2,775,000.00