HomeMy WebLinkAboutPUBLIC NOTICE - 75A
Orozco, Norma
From:natalie_mendoza@dailyjournal.com
Sent:Wednesday, May 06, 2020 4:06 PM
To:Orozco, Norma
Subject:Confirmation of Order 3364317 for PH - WELL 32
Dear Customer:
The order listed below has been received and processed. If you have any questions regarding this order, please contact
your ad coordinator or the phone number listed below.
Customer Account Number: 120448
Type of Notice : GPN - GOVT PUBLIC NOTICE
Ad Description : PH - WELL 32
Our Order Number : 3364317
Newspaper : ORANGE COUNTY REPORTER
Publication Date(s) : 05/08/2020
Sales/Hrg Date : 05/19/2020
Thank you.
NATALIE MENDOZA
DAILY JOURNAL CORPORATION
CALIFORNIA NEWSPAPER SERVICE BUREAU
Phone: (800) 788 7840 / (213)229-5300
Fax: (800) 540 4089 / (213)229-5481
1
5`1(g l2oL0 Ccr". -75A
ORANGE COUNTY REPORTER
- SINCE 1921 -
600 W SANTA ANA BLVD, SANTA ANA, CA 92701
Telephone (714) 543-2027 / Fax (714) 542-6841
NORMA OROZCO
SANTA ANA/CITY CLERK
20 CIVIC CENTER PLAZA M-30
SANTA ANA, CA - 92701
PROOF OF PUBLICATION
(2015.5 C.C.P.)
State of California )
County of ORANGE ) ss
Notice Type: GPN - GOVT PUBLIC NOTICE
Ad Description:
PH - WELL 32
I am a citizen of the United States and a resident of the State of California; I am
over the age of eighteen years, and not a party to or interested in the above
entitled matter. I am the principal clerk of the printer and publisher of the
ORANGE COUNTY REPORTER, a newspaper published in the English
language in the city of SANTA ANA, county of ORANGE, and adjudged a
newspaper of general circulation as defined by the laws of the State of
California by the Superior Court of the County of ORANGE, State of California,
under date 0600/1922, Case No. 13421. That the notice, of which the
annexed is a printed copy, has been published in each regular and entire issue
of said newspaper and not in any supplement thereof on the following dates,
to -wit:
[�1c10I9PAYA]
Executed on: 05/08/2020
At Los Angeles, California
I certify (or declare) under penalty of perjury that the foregoing is true and
correct.
Signature
II III 11111111 1111111
* A 0 0 0 0 0 5 4 1 3 9 9 7*
This space for filing stamp only
OR#: 3364317
WELL NO. 32 REHABILITATION
PROJECT
PROPOSED MITIGATED NEGATIVE
DECLARATION AND
NOTICE OF INTENT TO ADOPT THE
PROPOSED MITIGATED NEGATIVE
DECLARATION
NOTICE OF PUBLIC HEARING
This serves as the City of Santo's Noth
of Intent fN00 to adopt a Minoan
as
The public heating for this project,
originally scheduled for January 21, 2020.
will now take place on May 19, 2020.
Name of Project.. City of Santa Ana Well
No. 32 Rehabilitation Project
Project Locagon: The Proposed Cie, of
Quadrangle Map (1977). Well No. 32 is
located at 2801 North Westwood Avenue
in the southwest comer of Morrison Park.
A new proposed pipeline will connect the
well to the existing John Gable Reservoir
traversing North Westwood Avenue to
West Memory Lane W North Bristol
Street.
Lead Agency. City of Santa Ana, Public
Works Agency
220 S. Daisy Avenue
Santa Ana, California 92701
Project Description: The City of Santa
Ana is proposing to rehabilitate existing
Well No. 32 by removing the existing
pump and installing a now one with a
variable frequency dit to pump well
water. The Project includes conswction
of approximately 3,250 linear feet of new
pipeline to pump the well water Io the
existing John Gable Reservoir. The
protect also includes a new above ground
well building with separate elecln I and
mechanical room. Appurtenant Features
include demolition of undergroontl
facilities, site improvements and
landscaping. A separate chemical reality
building far on -site generation of sodium
hypochlodte to disinfect well production
waters will be constructed at John Ganhe
Reservoir.
The City encompasses 27.5 square miles
and has a population of over 325,000
people. The City operates a water
tllstribution system which includes more
than 450 miles of water mains and over
es. The City's potable
/ using a combination
the Orange County
r using 21 existing
rid Importing water via
olitan Water District
s. The Cl has some
e gmun ter with
rvels. The City has
e Blending Plan that
.is groundwater with
star. One of the high
II No. 32 and it has
mr nine (9) years due
efficiandes and high
in rehabilitate and re -
No. 32 for semce.
well site and impacting Morrison Park, the
City intends to incorporate Well No. 32
Into its existing Nitrate Blending Plan,
Water fmm Well No. 32 will be pumped to
the Jahn Games Reservoir site. At the
John Gadhe Reservoir site, the City
Intends to blend low nitrate water from
Well Nos. 36 and 39 (both located at the
reservoir site) with higher nitrate water
man Well Nos. 18, 24 and once
reinstated, Well No. 32. By reinstating
Well No. 32, the City can more efedlvely
improve its water supply reliability and
help ease the burden on the other water
production distribugon fedlities.
The disturbed surface area for the
rehabilitation of Well No. 32 and
construction of the associated pipeline Is
approximately 0.278 acres. Cnstmction
is anticipated to begin in the 2020 and
continue for approximately 14 months.
Once operational, the potential production
capacity of rehabilitated Well No. 32 is
expected to range been 2,000 to as much
as 2,500 gallons per minute.
The Project site is not designated a
hazardous waste property, or a hazardous
waste disposal site as enumerated under
Section 65962.5 of the Califomia
Government Code.
NOTICE IS HEREBY GIVEN THAT the
City of Santa Ana proposes to adopt a
Mitigated Negative Declaration for the
above -cited Project. Such Mitigated
Negative Declaration is based on the
finding that, by implementing the identified
mitigation measures, the Projects
Polential impacts will be maintained at a
es'sthan significant level. The reasons to
support such a finding are documented by
the Initial Study prepared by the City of
Santa Ana. Copies of the Initial Study, the
proposed Mitigated! Negative Declaration
and supporting materials are available for
review at the City of Santa Ana, Public
Works Agency located at 220 S. Daisy
Avenue, Santa Ana, CA 92703.
For questions regarding the Mitigated
Negative Declaration, please contact:AM NE: Armando Fernandez, P.E.
PHONE: 714.647.3316
TITLE: Senior Civil Engineer
EMAIL: AFemandez@same-ana.org
ADDRESS: City of Santa Ana Public
Works A ency
220 S. Daley Avenue
Santa Ana. CA 92703
Public Review Period: The Initial
Study/Mitigated Negative Declaration
under went public review for 30 days,
Email