Loading...
HomeMy WebLinkAboutATCHISON, TOPEKA AND SANTA FE RAILWAY COMPANY01000089-56 Santa Ana SUPPLEMENTAL AGREEMENT, made this V%� day of 1987, between THE ATCHISON, TOPEKA AND SANTA FE RAILWAY COMPANY a Delaware Corporation, hereinafter designated "Santa Fe" and the CITY OF SANTA ANA, a California municipal corporation, hereinafter designated "City". R E C I T A L S By Agreement dated December 14, 1983, identified as Santa Fe Secretary's Contract No. 168991, the parties hereto agreed to the construction and maintenance of a public transportation center .in the City of Santa Ana. Exhibit "A", attached to and made a part of said agreement, was a print of Drawing C.E.C.L. No. 20-41279 --- 1 dated February 4, 1982, and last revised May 11, 1983. Santa Fe has now prepared a new Exhibit "A" drawing which reflects changes which have been agreed to by the parties during construction of said public transportation center, and other changes which the parties desire to accomplish to complete the project. Exhibit "B" dated April 20, 1982, revised October 26, 1982, attached to and made a part of said agreement, was an estimate of cost of work to be performed by Santa Fe in connection with said public transportation center. Santa Fe has now prepared a new Exhibit "B" which reflects the estimated cost of all work accomplished to date by Santa Fe, including changes which have been agreed to by the parties during construction of said transportation center, and other changes which the parties desire to accomplish to complete the project. Santa Fe and City being willing to supplement said agreements, the parties hereto desire to set forth their understanding and agreement. A G R E E M. E N T It is agreed by and between the parties as follows: El: 1. Exhibit "A", C..E.C.L. Drawing No. 20-41279-1 dated 'February 4, 1982, and last revised March 9, 1987, which is attached hereto and by reference made a part hereof, is hereby substituted in the place and instead of Exhibit "A", Drawing C.E.C.L. No. 20-41279-1, last revised May 11, 1983, attached to and made a part of Secretary's Contract No. 168991, with like force and effect as though originally attached thereto and made a part thereof. 2. Exhibit "B", dated March 9, 1987, which is attached hereto and by reference made a part hereof, is hereby substituted in the place and instead of Exhibit "B", last revised October 2.6, 1982, attached to and made a part of Secretary's Contract No. 168991, with like force and effect as though originally attached thereto and made a part thereof. 3. That as herein amended, Santa Fe Secretary's Contract No. 168993, shall be and remain in force and effect. x E! N -2- IN WITNESS WHEREOF THE PARTIES HERETO HAVE DULY EXECUTED THIS AGREEMENT on the day and year first above written. THE ATCHISON, TOPEKA AND SANTA FE RAILWAY COMPANY By PPesident Its CITY OF SANTA ANA BY CITY OF SANTA ANA, CALIFORNIA APPROVED: David H. Grosse, Director Department of Transportation Svcs APPROVED AS TO FORM: 0056j ATTEST: Jan I Clerk of The Council APPROVED 0 ONTENT: City M nAge` -3- EXHIBIT "B" THE ATCHISON, TOPEKA AND SANTA FE RAILWAY COMPANY ESTIMATE FOR SANTA ANA INTERCITY TRANSPORTATION CENTER Estimate of: costs by forces for: engineering, inspection and flagging, permanent removal of garage, permanent relocation of signal facilities and crossing warning devices at Fourth Street and Santa Ana Boulevard, and installation of electric locks and power switch, permanent relocation of joint signal/communication pole line, permanent relocation, construction and/or removal of various tracks, permanent installation and removal of A.C. paving, permanent installation of 240 track feet of rubber crossing material, relocation of team track and unloading dock, all in connection with Santa Ana Intercity Transportation Center. at Santa Ana, Fourth District, Los Angeles Division. Revised March 9, 1987 -1- THE ATCHISON, TOPEKA AND SANTA FE RAILWAY COMPANY - COAST LINES EXHIBIT "B" Summary - Estimate of Cost, Santa Ana Intercity Transportation Center 1. Engineering, Inspection and Flagging (Perm) 55,391 2. Communications (Perm) 28,531 3. Signal (Perm) 535,966 4. Track (Perm) 625,116 5. Loading Dock (Perm) 16,466 6. Paving (Perm) 120,000 7. Remove - Garage Building (Perm) 3,000 Add for Contingencies 130,894 Estimated Cost of Labor and Material 1,515,365 Auditing and Billing 4,738 Equipment Rental and Depreciation 72,415 Transportation of Equipment 7,500 Credit for Material Recovered: Signal 3,000 Less Cost to Return to Stock - 120 2,880 - 2,880 Estimated Cost of Work to be Performed by Santa Fe Forces and Paid for by the City of Santa Ana 1,597,137 -2- 1. Engineering Inspection and Flagginq Salaries Expenses Vacation, Paid Holiday Retirement and Unemployment Tax Health and Welfare Benefits and Croup Life Insurance Workman's Comp. and Liab. Ins. Excise Tax Estimated Cost of Engineering and Inspection 2. Communication (Perm.) Material Handling at Storehouse Transportation to Site of Job Use Taxes Estimated Cost of Material Labor Salaries Expenses Vacation, Paid Holiday Retirement and Unemployment Tax Health and Welfare Benefits and Group Life Insurance Workman's Comp. and Liab. Ins. Excise Tax Estimated Cost of Labor Estimated Cost of Labor and Material (Perm.) 3. Signal (Perm.) Material Handling at Storehouse Transportation to Site of Job Use Taxes Estimated Cost of Material Labor Salaries Expenses Vacation, Paid Holiday Retirement and Unemployment Tax Health and Welfare Benefits and Group Life Insurance Workman's Comp. and Liab. Ins. Excise Tax Estimated Cost of Labor Estimated Cost of Labor and Material (Perm.) 33,383 3,704 3,589 8,583 1,749 4,006 377 6,337 317 321 380 55,391 7,355 13,251 677 1,421 3,41.9 663 1,590 155 21,176 28,531 316,602 15,830 3,804 18,996 96,811 26,169 10,407 28,654 4,841 11,617 2,235 355,232 180,734 535,966 -3- 4. Track (Intl. Rubber Crossings) Material Handling at Storehouse Transportation to Site of Job Use Taxes Estimated Cost of Material Labor Salaries Expenses Vacation, Paid Holiday Retirement and Unemployment Tax Health and Welfare Benefits and Group Life Insurance Workman's Comp. and Liab. Ins. Excise Tax Estimated Cost of Labor Estimated Cost of Labor and Material (Perm.) 5. Loading Dock (Perm.) Material Handling at Storehouse Transportation to Site of Job Use Taxes Estimated Cost of Material Labor Salaries Expenses Vacation, Paid Holiday Retirement and Unemployment Tax Health and Welfare Benefits and Group Life Insurance Workman's Comp. and Liab. Ins. Excise Tax Estimated Cost of Labor Estimated Cost of Labor. and Material (Perm.) 6. Paving (incl. removing 2 trees) (Perm.) Material Handling at Storehouse Transportation to Site of Job Use Taxes Estimated Cost of Material 341,382 17,069 17,069 20,483 137,449 15,490 14,776 35,159 7,683 16,494 2,062 9,464 473 461 568 2,769 1, 21.8 298 714 138 332 31 48,110 2,405 193 2,887 396,003 229,113 10,966 5,500 53,595 625,116 1.6, 466 -4 - Paving (Incl. removing 2 trees) (Perm.) (cont'd) Labor Salaries 26,094 Expenses 2,609 Vacation, Paid Holiday 2,805 Retirement and Unemployment Tax 6,732 Health and Welfare Benefits and Group Life Insurance 1,305 Workman's Comp. and Liab. Ins. 3,131 Excise Tax 309 Estimated Cost of Labor 66,405 Estimated Cost of Labor and Material (Perm.) 120,000 7. Remove Garage Building (Perm.) Material Handling at Storehouse Transportation to Site of Job Use Taxes Estimated Cost of Material Labor Salaries 1,863 Expenses 117 Vacation, Paid Holiday 200 Retirement and Unemployment Tax 482 Health and Welfare Benefits and Group Life Insurance 93 Workman's Comp. and Liab. Ins. 223 Excise Tax 22 Estimated Cost of Labor 3,000 Estimated Cost of Labor and Material (Perm.) 3,000 4420e -5-