Item # 11
City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
January 19, 2021
TOPIC: Approve Appropriation Adjustments, Amend CIP, and Award Construction
Contract South Main Street Corridor Improvements Project
AGENDA TITLE:
Approve appropriation adjustments, approve amendments to the FY 2020-21 Capital
Improvement Program, and award a construction contract to C.S. Legacy Construction,
Inc. in the amount of $12,759,695 for the South Main Street Corridor Improvements
Project with an estimated total delivery cost of $18,309,245 (Project Nos. 17-9001,18-
6911, 19-6940 20-6958, 21-6014, 21-6451, 21-6461) (Non -General & General Fund)
RECOMMENDED ACTION
1. Approve an appropriation adjustment to recognize $3,791,468 of prior year fund
balance in the Sanitary Sewer Fund, Capital Recovery Charges, Prior Year
Carryforward revenue account and appropriate the same amount to the Sanitary
Sewer Fund, Capital Recovery Charges, Improvements Other Than Building
expenditure account.
2. Approve an appropriation adjustment to recognize $3,863,143 of prior year fund
balance in the Water Fund, Public Works Water Revenue, Prior Year Carryforward
and appropriate the same amount to the Acquisition & Construction, Water Utility
Capital Projects, Water Capital Project expenditure account.
3. Approve an appropriation adjustment to recognize $71,407 of prior year fund
balance in the Peebler Fund Capital Project Revenue, Prior Year Carryforward and
appropriate the same amount to the Peebler Fund Capital Project, Improvements
Other Than Building expenditure account.
4. Approve an amendment to the Fiscal Year 2020-21 Capital Improvement Program
to include $3,791,468 in construction funds for the South Main Street Sewer
Improvements Project (Project No. 21-6451).
5. Approve an amendment to the Fiscal Year 2020-21 Capital Improvement Program
to include $3,863,143 in construction funds for South Main Street Water
Improvements Project (Project No. 21-6461).
6. Reject Bid Protest and award a construction contract to C.S. Legacy Construction,
Inc., the lowest responsible bidder, in accordance with the base bid and bid
alternatives 1, 2, 3, 4, 5, 7, and 8 in the amount of $12,759,695, for construction of
the South Main Street Corridor Improvements Project, for the term beginning
January 19, 2020 and ending upon project completion, and authorize the City
Approve Appropriation Adjustments, Amend Cl P, and Award Construction Contract South
Main Street Corridor Improvements Project
January 19, 2021
Page 2
Manager to execute the contract subject to non -substantive changes approved by
the City Manager and the City Attorney.
7. Approve the Project Cost Analysis for a total estimated construction delivery cost
of $18,309,245, which includes $12,759,695 for the construction contract,
$1,599,050 for contract administration, inspection and testing; and a $3,950,500
project contingency for unanticipated or unforeseen work.
DISCUSSION
The South Main Street Corridor is a diverse and vibrant community with rich history and
culture. The South Main Street Corridor Improvements Project is the implementation of
many years of effort, community input and planning which resulted in the South Main
Street Vision Plan that was adopted in 2016. This project will create a safer and more
vibrant street for the community by revitalizing a 2.5-mile stretch of Main Street from First
Street to Dyer Road (Exhibit 1).
The construction scope of work includes monument signs, enhanced lighting,
hardscaping, landscaping, irrigation, traffic signals, signing, striping, and street pavement
rehabilitation, which will take place concurrently as part of a Water Resources Division
project. These improvements will establish a sense of arrival, safe walkability, and
promote effective placemaking through traffic calming, hardscape softening, and
community monuments.
In order to ensure all infrastructure is addressed as part of the South Main Corridor
project, the Water Resources Division identified needed water and sewer improvements.
The proposed improvements will replace aging and deficient water mains, sewer mains,
fire hydrants, sewer maintenance holes, water services, and sewer laterals within the
project limits. The proposed appropriation adjustment and Capital Improvement Projects
amendments will allow for these improvements to be included and built in coordination
with the South Main Street Improvements (Exhibit 2).
Public Outreach and Contractor Participation
To provide an opportunity for local vendors to submit bids, the City notified a total of 809
regional vendors via PlanetBids, many of which are Santa Ana based. One hundred
fifteen vendors requested bidding documents, and a total of seven bids were received.
Bids were not received from any Santa Ana contractors.
As legally required, a Notice Inviting Bids was advertised in the Orange County Register
newspaper on September 1 and September 5, 2020. The project was also advertised in
PlanetBids from September 1, 2020 through November 4, 2020. Bids were received
electronically via PlanetBids on November 4, 2020.
Approve Appropriation Adjustments, Amend Cl P, and Award Construction Contract South
Main Street Corridor Improvements Project
January 19, 2021
Page 3
Bid Results Summary
RANK
BIDDER'S NAME
LOCATION
BASE BID +
ALTERNATE
BID 1,2,3,4,5,7,&
8
1
C.S. Legacy Construction, Inc.
Chino
$ 12,759,695
2
Lonerock, Inc.
Irvine
$ 13,015,290
3
Excel Paving Co.
Long Beach
$14,459,791
4
EBS General Engineering, Inc.
Corona
$14,517,390
5
Beador Construction
Corona
$15,159,700
6
Griffith Company
Santa Fe Springs
$15,699,283
7
PUB Construction, Inc.
Diamond Bar
$17,794,905
A total of seven bids were received and all were deemed responsive. C.S. Legacy
Construction, Inc. submitted the lowest responsive base bid in the amount of
$9,018,834.03 (Exhibit 3). As specified in the bid documents, the lowest bid shall be
determined on the basis of the Base Bid. The City has the option to add one, all, or a
combination of alternate bids. Based on the bid analysis and a contractor's reference
check, staff recommends awarding the construction contract to C.S. Legacy Construction,
Inc., in the amount of the base bid and bid alternates 1, 2, 3, 4, 5, 7, and 8, totaling
$12,759,695 (Exhibit 4).
A Bid Protest was submitted to the City by the second lowest bidder, Lonerock, Inc. who
challenged the responsiveness of the apparent low bidder. Subsequently, a hearing was
held on November 25, 2020 in which Lonerock, Inc articulated their position on the
Protest. Ultimately, the City's legal counsel and Public Works staff found the minor
irregularities in the C.S. Legacy Construction, Inc. bid to be immaterial. Staff
recommends waiving the protest and awarding the contract to C.S. Legacy Construction
Inc.
Project Delivery
To deliver a complete project, in addition to the construction contract, the estimated total
project delivery cost includes construction administration, inspection, and testing, along
with an allowance for contingencies to account for unexpected or unforeseen conditions.
Construction administration and inspection includes construction management;
implementation of the City's Community Workforce Agreement requirements; inspection
of the Contractor's work to ensure contract compliance, workmanship, and quality; and
materials testing.
Approve Appropriation Adjustments, Amend Cl P, and Award Construction Contract South
Main Street Corridor Improvements Project
January 19, 2021
Page 4
As indicated in the Cost Analysis (Exhibit 5) and as summarized in the table below, the
estimated total construction delivery cost of the project is $18,309,245. In accordance
with the Public Works Agency's "Dig -Once" philosophy, during construction, the condition
of the waterline will be assessed. If it is determined that repairs or replacement are
needed, this work will be added to the project to avoid unnecessary future impacts to the
new improvements or disruptions to the community. An allowance of $2,500,000 is
budgeted for this potential water main work and will only be used if needed.
Project Item
Total
Construction Contract
$12,759,695
Construction Administration, Inspection, Testing
$1,599,050
Project Contingencies
$1,450,500
Water Main Repair Contingencies
$2,500,000
TOTAL CONSTRUCTION DELIVERY COST
$18,309,245
ENVIRONMENTAL IMPACT
In accordance with the California Environmental Quality Act, the recommended actions
are exempt from further review. Categorical Exemption Environmental Review Nos. ER-
2020-102, ER-2020-103, ER-2020-104, ER-2020-105, ER-2020-109, and ER-2020-110
were filed for the project.
FISCAL IMPACT
As indicated in the Cost Analysis, the estimated total construction delivery cost of the
project is $18,309,245, which includes construction, contract administration, inspection,
testing, and authorized contingencies of $3,950,500. Approval of the requested
Appropriation Adjustments will provide the following funding:
1. Recognize $3,791,468 from prior year fund balance in the Sanitary Sewer Fund,
Capital Recovery Charges, Prior Year Carryforward revenue account (No.
05417001-50001) and appropriate the same amount to the Sanitary Sewer Fund,
Capital Recovery Charges, Improvements Other Than Building expenditure
account (No. 05717647-66220).
2. Recognize $3,863,143 from prior year fund balance in the Water Fund, Public
Works Water Revenue, Prior Year Carryforward revenue account (No. 06017002-
50001) and appropriate the same amount to the Acquisition & Construction, Water
Utility Capital Projects, Water Capital Project expenditure account (No. 06617647-
66301).
3. Recognize $71,407 from prior year fund balance in the Peebler Fund Capital
Project Revenue, Prior Year Carryforward revenue account (no. 41818002-50001)
Approve Appropriation Adjustments, Amend Cl P, and Award Construction Contract South
Main Street Corridor Improvements Project
January 19, 2021
Page 5
and appropriate the same amount to the Peebler Fund Capital Project,
Improvements Other Than Building expenditure account (No. 41818830-66220).
All funds are available for expenditure in Fiscal Year 2020-21; however, any remaining
balances not expended at the end of the fiscal year will be carried forward into FY 2021-
22 for expenditure.
The following table summarizes the funds budgeted for expenditure to deliver
construction of this project:
Accounting
Fiscal
Unit -Account
Fund
Accounting Unit -
Amount
Year
No.
Description
Account No. Description
Project No.
APPROPRIATION ADJUSTMENTS
2020-
05417647-
Sanitary
Capital Recovery Charges,
21
66220
Sewer
Improvements Other Than
$3,791,468
21-6451
Capital
Building
2020-
06617647-
Water
Water Utility Capital
21
66301
Acquisition &
Projects,
$3,863,143
21-6461
Construction
Water Capital Project
Peebler Fund Capital
2020-
41818830-
CDA Capital
Projects,
$71,407
21
66220
Improvements Other Than
Building
EXISTING BUDGET
41818830-
Peebler Fund Capital
2020-
66220
CDA Capital
Projects,
$3,702,362
21
(17-9001)
Improvements Other Than
Building
2020-
41818831-
South Main Redevelopment
21
66220
CDA Capital
Project, Improvements
$2,024,774
17-9001
Other Than Building
2020-
01117621-
General
Bus Shelter Program,
21
66220
Fund
Improvements Other Than
$180,500
21-6014
Building
03217662-
Measure M
Measure M2 Local
2020-
66220
Street
Fairshare,
$607,000
21
(18-6911)
Construction
Improvements Other Than
Building
Approve Appropriation Adjustments, Amend Cl P, and Award Construction Contract South
Main Street Corridor Improvements Project
January 19, 2021
Page 6
Accounting
Fiscal
Unit -Account
Fund
Accounting Unit -
Amount
Year
No.
Description
Account No. Description
Project No.
Gas Tax SB1 Road
20
05917665-
Select Street
Maintenance &
21
66220
Construction
Rehabilitation Account,
$1,148,541
(20-6958)
Improvements Other Than
Building
2020-
05417647-
Sanitary
Capital Recovery Charges,
21
66220
Sewer
Improvements Other Than
$2,365,000
21-6451
Capital
Building
Gas Tax SB1 Road
20
05917665-
Select Street
Maintenance &
21
66220
Construction
Rehabilitation Account,
$555,050
(19-6940)
Improvements Other Than
Building
Total
$18,309,245
EXHIBIT(S)
1. Location Map
2. Amended 20/21 CIP Sheets
3. Bid Proposal
4. Construction Contract
5. Cost Analysis
Submitted By:
Nabil Saba, Executive Dir Public Works
Approved By: Kristine Ridge, City Manager