DATE: PROJECT NO.: 23-6476
GLENWOOD PLACE WATER MAIN IMPROVEMENTS
This CONSTRUCTION CONTRACT is made and entered into this 2°d day of May, 2023 by and between
the City of Santa Ana, California, a charter city and municipal corporation organized and existing under
the Constitution and laws of the State of California (hereinafter "CITY"), and Vido Samarzich, hic.
(hereinafter "CONTRACTOR").
!o/-.W LZ(AV)
(Ear-rT1A1Mk fro)
WITNESSETH:
The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows:
1. CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and
oexpense necessary to construct and complete in a good and workmanlike manner and to the satisfaction
tiof the City Engineer of the CITY, the Glenwood Place Water Main Improvements (hereinafter referred
c to as the "WORK OF IMPROVEMENT") identified in and in accordance with the Contract
Documents prepared by the City's Public Works Agency and approved by the City Council.
2. The complete Construction Contract consists of the "Contract Documents" as defined by the Standard
Specifications for Public Works Construction and which include the following
• Notice Inviting Bids
• Information to Bidders
• Bid Proposal
• Bid Bond
• Contract Form
• Contract Bonds
• General Provisions
• Special Provisions
• Technical Provisions and Project Plans
• Community Workforce Agreement
• Appendices
In case of conflict between the Contract Documents, the precedence of documents shall be as
established in the Standard Specifications for Public Works Construction.
3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the WORK OF
IMPROVEMENT the sum total amount not to exceed Nine Hundred Seventy -Eight Thousand Four
Hundred and Fifty Five Dollars and No Cents ($978,455.00), as set forth and identified in the BID
PROPOSAL, which is attached hereto and incorporated herein as Exhibit "A."
The BID PROPOSAL contains a schedule of unit price(s) or lump sum(s) based on approximate
quantities only, and the City does not expressly or by implication agree that the actual amount of work
will correspond therewith, but reserves the right to increase or decrease the amount of any class or
portion of the work or to omit portions of the work as may be deemed necessary or advisable.
w. 09/01/2017 Pagel of 3
4. CONTRACTOR agrees to complete the WORK OF IMPROVEMENT within the time specified in
the Time for Completion of Improvements section of the BID PROPOSAL (Exhibit "A") including
commencing construction within the timeframe therein specified after issuance of a Notice to Proceed.
The CONTRACTOR will pay, and will require all subcontractors to pay, all employees on the WORK
OF IMPROVEMENT a salary or wage at least equal to the prevailing salary or wage established for
such work as set forth in the wage determinations for this work in accordance with applicable State
and Federal law.
6. If applicable, the CONTRACTOR shall adhere to the CITY'S Community Workforce Agreement
(CWA), a pre -hire collective bargaining agreement, which establishes the labor relations policies and
procedures for CONTRACTOR to follow in the crafts persons employed to complete the WORK OF
IMPROVEMENT as more fully described in the CWA. The CWA may be found on the City's website
at: http://www.santa-ana.ore/pwa/documents/CWA.odf
CONTRACTOR shall, after award of this Contract, furnish two bonds to be approved by the CITY,
one in the amount of One Hundred Percent (100%) of the Contract price, to guarantee the faithful
performance of the work (Performance Bond), and one in the amount of One Hundred Percent (100%)
of the Contract price to guarantee payment of all claims for labor and materials furnished (Payment
Bond). This Contract shall not become effective until such bonds are supplied to and approved by the
CITY.
CONTRACTOR shall, prior to the release of the performance and payment bonds or the retention
payment, furnish a warranty performance and payment bond (Warranty Bond). Said Warranty Bond
shall also be required as a condition of project acceptance. For projects up to Five Hundred Thousand
Dollars ($500,000), the Warranty Bond amount shall be the greater of Ten Thousand Dollars ($10,000)
or Twenty Percent (20%) of the final contract price. For projects above Five Hundred Thousand
Dollars ($500,000), the Warranty Bond amount shall be the greater of One Hundred Thousand Dollars
($100,000) or Ten Percent (10%) of the final contract price.
9. CONTRACTOR shall, after award of this Contract, furnish Certificates of Liability Insurance and
Worker's Compensation Insurance as outlined in the General Provisions, to be approved by the CITY.
10. INDEMNIFICATION.
To the fullest extent allowed by law, CONTRACTOR and its Subcontractors hereby agree to defend,
indemnify, and hold harmless CITY, its City Council, boards and commissions, officers, agents,
employees, representatives and volunteers (hereinafter collectively referred to as "Indemnitees"),
through legal counsel acceptable to CITY, from and against any liability, claims, actions, costs,
damages or losses, including reasonable costs and attorney's fees, for injury, including death to any
person or damage to any property, arising directly or indirectly from, or in any manner relating to, any
of the following:
(i) Performance or nonperformance of the Work of Improvement by CONTRACTOR or its
Subcontractors of any lower tier;
(ii) Performance or nonperformance by CONTRACTOR or its Subcontractors of any lower tier,
of any of the obligations under the Contract Documents;
Page 2 of 3
(iii) The construction activities of CONTRACTOR or its Subcontractors of any lower tier, either
on the project site or on other properties;
(iv) The payment or nonpayment by CONTRACTOR of any of its Subcontractors of any lower
tier, for Work of Improvement performed on or off the project site; and
(v) Any personal injury, property damage or economic loss to third persons related to and arising
from the performance or nonperformance by CONTRACTOR or its Subcontractors of any
lower tier, of the Work of Improvement.
(vi) The indemnity obligations of Subcontractors provided by this Section shall be included in all
subcontract documents issued by CONTRACTOR.
Nothing in the Contract Documents shall be construed to give rise to any implied right of indemnity in
favor of CONTRACTOR against CITY or any other hzdemnitee.
IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the day and
year first above written.
ATTEST:
a
, *
JENNIFER L. HALL--'
Clerk of the Council
APPROVED AS TO FORM:
SONIA R. CARVALHO
City Attorney
JOHN FUNK
Chief Assistant City Attorney
FOR APPROVAL:
NABIL SABA, PE
xecutive Director
Public Works Agency
CITY OF SANTA ANA
1
KRISTINE RIDGE
City Manager
CONTRACTOR:
Vido Samarzich, Inc.
I� — ViDo L, SA..+A2z'erl
NAME:
TITLE: VI GE PRs/uEN'f
Page 3 of 3
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 23-6476
GLENWOOD PLACE WATER MAIN IMPROVEMENTS
BID PROPOSAL
TO: CITY COUNCIL OF THE CITY OF SANTA ANA
FROM: Vido Samarzich. Inc.
REQUIREMENT:
The undersigned bidder declares that they have carefully examined the location of the proposed
work, that they have examined the Contract Documents in its entirety and hereby proposes to
furnish all material and do all the work required to complete the said work in accordance with
said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the
following schedule:
Item
Description
Qty
Unit
Unit Price
Amount
1
Mobilization/Demobilization
1
LS
$
$
(max.5%of total bid)
45,000.00
45,000.00
2
12" Class 305 (DR 14) C900 PVC
630
LF
$
$
Pipe
247.00
155,610.00
3
1"Copper Water Service
13
EA
$
$
3,500.00
45,500.00
4
2" Copper Water Service
I
EA
$
$
8,000.00
18,000.00
5
6" Fire Service
7
EA
$
$
9,000.00
63,000.00
6
8" Fire Service
3
EA
$
$
12,000.00
36,000.00
7
12" Resilient Wedge Gate Valve
3
EA
$
$
7,000.00
21,000.00
8
Fire Hydrant
2
EA
$
$
14,000.00
28,000.00
9
2" Blow Off Assembly
2
EA
$
$
7,000.00
14,000.00
10
Vertical Offset (As -Needed)*
5
EA
$
$
7,500.00
37,500.00
it
1"Air and VacuumReleaseVaive
1
EA
$
$
(As -Needed)*
5,500,00
5,500.00
12
Additional Potholing (As -Needed)*
10
EA
$
$
500.00
5,000.00
13
CCTV Inspection of Existing Sewer
1,100
LF
$
$
Main
5.00
5,500.00
14
CCTV Inspection of Existing Sewer
15
EA
$
$
Lateral
350.00
5,250.00
P-I ofP-17
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 23-6476
GLENWOOD PLACE WATER MAIN IMPROVEMENTS
Item
Description
Qty
Unit
Unit Price
Amount
15
Unclassified Excavation
780
CY
$
$
100.00
78,000.00
16
Asphalt Concrete
1,180
TN
$
$
125.00
147,500.00
17
Asphalt Rubber Hot Mix (ARI 1M)
250
TN
$
$
230.00
57,500.00
18
Cold Mill (2")
10,500
SF
$
$
1.75
18,375.00
19
PCC Sidewalk (T=4")
470
SP
$
$
16.00
7,520.00
20
PCC Driveway Approach
2,740
SF
$
$
20.00
54,800.00
21
PCC Cross -Gutter
1,200
SF
$
$
25.00
30,000.00
22
PCC Curb & Gutter (A-2-8)
420
LF
$
$
95.00
39,900.00
23
Adjust Manhole Frame and Cover
3
EA
$
$
1,500.00
4,500.00
24
Project Advertisement Sign
I
EA
$
$
1,500.00
1,500.00
25
Abandon in Place Existing
I
LS
$
$
Water Main
20,000.00
20,000.00
26
Signing & Striping
I
LS
$
$
4,000.00
4,000.00
27
Construction Permit
l
LS
$15,000
$15,000
28
As -Built Plans
I
LS
$25,000
$25,000
P-2 of P-17
ADDENDUM NO. ONE
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 23-6476
GLENWOOD PLACE WATER MAIN IMPROVEMENTS
TOTAL BASE BID l 78r 453. 00
The lowest responsible bidder shall be selected based on the total base bid. The City reserves the
right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any).
The quantity for this bid item is shown for bid comparison only. This bid item shall not be
subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual
amount for this item will be dictated by the actual quantity used, and the Agency reserves the
right to increase or decrease the quantity of this item accordingly.
t This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications
TIME FOR COMPLETION OF IMPROVEMENTS AND LIOUIDATED DAMAGES
The undersigned bidder hereby proposes to complete the Work for the total base bid amount
shown above, within thirty (30) working days after the commencement date stated in the Notice
to Proceed.
The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the
Standard Specifications, shall be $3,250 per calendar day.
Name of Firm
Signature of BIl
Title Vice President
(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
Corporation: Vido Samarzich, Inc.
President: Vido Samarzich
Vice President: Vido L. Samarzich
Secretary: Monika Samarzich
P-3 ofP-17
Ruvalcaba, Anqelica
From: City of Santa Ana <certificate-request@ctraxjdidata.com>
Sent: Wednesday, May 24, 2023 11:02 AM
To: Ruvalcaba, Angelica; Reyes, Erendida; Castro, Jose; lisa@socalinsurance.com; Furjanic,
Suzi; Rodriguez, Teresa; vidosam@yahoo.com
Subject: Internal Notice of Compliance
NOTICE OF COMPLIANCE
CITY STAFF: PRINT THIS PAGE AND INCLUDE WITH AGREEMENT TO THE CLERK OF THE COUNCIL
Contractor Vido Samarzich, Inc.
Name:
Project 23-6476
Number:
Project Glenwood Place Water Main Improvements
Name:
The Certificate of Insurance (COI) submitted indicates that the coverages are in compliance with the
insurance requirements. No further action is required at this time.
The compliant coverage(s) are:
EXPIRATION
TYPE OF INSURANCE
POLICY NUMBER
COI DATE
DATE
AUTOMOBILE LIABILITY
5164139EO975E
11/09/2024
05/08/2023
GENERAL LIABILITY
VCGP028763
12/23/2023
05/02/2023
PROFESSIONAL LIABILITY
WAIVER
05/18/2024
05/24/2023
WORKERS COMPENSATION AND EMPLOYERS' WSD507134900
LIABILITY
05/22/2024 05/23/2023
FILE NAME
23-6476 COI G L
UL WC_EXP 12-
23-23_ AL _EXP
11-09-23.pdf
COI - GL Santa
Ana On Call.pdf
Professional
Liability
Letter.pdf
COI -Gland
Workers Comp
Glenwood
Updated 5-23-
2023. pdf
1
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
CONTRACT CHANGE ORDER
Project Number Project No. 23-6476 Glenwood Water Main Improvements Change Order Number 1
To Vdo Samarzich Inc. Contractor
You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and
specifications on this contract.
NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER.
Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time.
Change requested by PUBLIC WORKS AGENCY
EXTRA WORK AT AGREED UNIT PRICE
1. Delete bid items 16, 17, and 18.
ITEM# DESCRIPTION
16 Asphalt Concrete
17 Asphalt Rubber Hot Mix
18 Cold Mill (2")
ESTIMATED
ESTIMATED
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1,180
TN
$125.00
($147,500.00)
250
TN
$230.00
($57,500.00)
10,500
SF
$1.75
($18,375.00)
2. Delete bid item quantity for items 2, 10, and 15.
ESTIMATED
ITEM# DESCRIPTION QUANTITY
02 12" Class 305 PVC Pipe 105.5
10 Vertical Offset (As -Needed)* 4
15 Unclassified Excavation 427.48
ESTIMATED TOTAL = ($223,375.00)
ESTIMATED
UNIT UNIT PRICE
AMOUNT
LF $247.00
($26,000.00)
EA $7,500.00
($30,000.00)
CY $100.00
($42,748.00)
ESTIMATED TOTAL = ($98,748.00)
Page 1 of 3
3. Construct PCC Street on Glenwood and remaining AC paving on Standard Avenue per PCO #1,
#3, and #5.
ITEM# DESCRIPTION
1.1 PCC Street
1.2 Revised Standard Ave.
Grind & Overlay
AGREED AGREED
QUANTITY UNIT UNIT PRICE AMOUNT
19,875 SF $32.00 $636,000.00
1 LS $99,963.25 $99,963.25
ESTIMATED TOTAL = $735.963.25
EXTRA WORK AT AGREED COST
4. Contractor to use slurry backfill for utility protection per PCO #6. AGREED PRICE = $13,996.37
TOTAL AGREED CHANGE ORDER COST = $749 959 62
TOTAL AGREED CONTRACT INCREASE COST = $427 836 62
Page 2 of 3
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
CONTRACT CHANGE ORDER
Project Number Project No. 23-6476 Glenwood Water Main Improvements Change Order Number
To Vido Samarzich Inc. Contractor
You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and
specifications on this contract.
NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER.
Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time.
Change requested by PUBLIC WORKS AGENCY
The compensation both time and cost set forth in this change order comprises the total compensation
due the Contractor, all Subcontractors, and all Suppliers for all work performed per this change order,
including impact on unchanged work. By signing this change order, the Contractor acknowledges and
agrees on behalf of himself, all Subcontractors, and all Suppliers, that the stipulated compensation
includes payment for all work contained in this change order, plus all payment for interruption of
schedules, extended field overhead, home office overhead, profit, delay, and all impact, ripple effect or
cumulative impact on all other work under this Contract. The signing of this change order constitutes full
mutual accord and satisfaction for all changes and work performed on this project, and that the time and
cost paid per this change order constitutes the total equitable adjustments owed the Contractor, all
Subcontractors, and all Suppliers for all work performed on this project. The Contractor on behalf of
himself, all Subcontractors, and all Suppliers agrees to waive all rights, without exception or reservation
of any whatsoever to file any further claim related to this project.
TOTAL COST THIS CHANGE ORDER: DECREASE $ 322,123.00 INCREASE $ 749,959.62
By reason of this order the CONTRACT TIME completion will be adjusted as follows: 0 non-compensable working days
We the undersigned contractor have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide
all equipment, furnish all materials, except as may otherwise be noted above, and perform all service necessary for the work above specified, and will accept
as full payment therefor the prices shown above.
Accepted, Date 02/23/2024 Contractor Vido Samarzich Inc.
ByIJ Title
Vice President
Approval recommended by 1. �L"," Dale
PUBLIC WORKS AGENCY EXECUTIVE DIRECTOR
Approved by
y�z6/Zt{