Loading...
HomeMy WebLinkAboutIDS GROUP, INC. (6)NSURANCE ON FILE IORK MAY PROCEED A-2023-088-12 NTIL INSURANCE EXPIRES S LR/4X rw CLERK 6=PwAlt)l��i CONSULTANT AGREEMENT BETWEEN THE CITY OF SANTA ANA AND (W C� IDS GROUP, INC. FOR ON -CALL ENGINEERING SERVICES THIS AGREEMENT is made and entered into on this 16th day of May, 2023 by and between IDS Group, Inc. ("Consultant"), and the City of Santa Ana, a charter city and municipal corporation v organized and existing under the Constitution and laws of the State of California ("City"). `v RECITALS A. On February 21, 2023 the City issued a Request for Proposal No. 23-030, by which it desired to retain a Consultant having special skill and knowledge in the field of: Professional Engineering Services on an on -call basis for the City's Public Works Agency. B. Consultant submitted a responsive proposal that was among those selected by the city. Consultant represents that it is able and willing to provide such services described in the scope of work that was included in the RFP No. 23-030. C. In undertaking the performance of this Agreement, Consultant represents that it is knowledgeable in its field and that any services performed by Consultant under this Agreement will be performed in compliance with such standards as may reasonably be expected from a professional consulting firm in the field. NOW THEREFORE, in consideration of the mutual and respective promises, and subject to the terms and conditions hereinafter set forth, the parties agree as follows: 1. SCOPE OF SERVICES Consultant shall perform the services that were described in the scope of work included in the RFP No. 23-030, during the term of this Agreement, the tasks and obligations including all labor, materials, tools, equipment, and incidental customary work required to fully and adequately complete the services described and set forth in "Scope of Services - Exhibit A", attached hereto and incorporated by reference, and as further described in Consultant's Proposal, attached hereto an incorporated herein by this reference as "Consultant's Proposal - Exhibit B". 2. COMPENSATION a. City neither warrants nor guarantees any minimum or maximum compensation to Consultant under this Agreement. Consultant shall be paid only for actual services performed under this Agreement at the rates and charges identified in Consultant's Fee Proposal, which is attached hereto and fully incorporated herein by this reference as "Compensation - Exhibit C". Consultant is one of fifteen (15) separate consultants selected to provide services on an on -call basis under RFP 23-030. The total compensation for services provided by all consultants selected under RFP 23-030 shall not exceed the shared aggregate amount of $5,000,000.00 during the term of this Agreement, including any extension periods, as set forth in Section 3, below. b. Payment by City shall be made within forty-five (45) days following receipt of proper Page 1 of 10 invoice evidencing work performed, subject to City accounting procedures. Payment need not be made for work which fails to meet the standards of performance set forth in the Recitals which may reasonably be expected by City. c. Notwithstanding any contrary terms contained within Consultant's Fee Proposal, Consultant's fees shall not exceed 3% annually over the term of this Agreement, including any extension periods, unless directly affected by Prevailing Wage laws. 3. TERM This Agreement shall commence on May 16, 2023 and end on May 15, 2026, with the option for the City to grant up to a one, two-year extension, exercisable by a writing by the City Manager and the City Attorney, unless terminated earlier in accordance with Section 15, below. 4. INDEPENDENT CONTRACTOR Consultant shall, during the entire term of this Agreement, be construed to be an independent Consultant and not an employee of the City. This Agreement is not intended nor shall it be construed to create an employer -employee relationship, a joint venture relationship, or to allow the City to exercise discretion or control over the professional manner in which Consultant performs the services which are the subject matter of this Agreement; however, the services to be provided by Consultant shall be provided in a manner consistent with all applicable standards and regulations governing such services. Consultant shall pay all salaries and wages, employer's social security taxes, unemployment insurance and similar taxes relating to employees and shall be responsible for all applicable withholding taxes. 5. OWNERSHIP OF MATERIALS This Agreement creates a non-exclusive and perpetual license for City to copy, use, modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property embodied in plans, specifications, studies, drawings, estimates, and other documents or works of authorship fixed in any tangible medium of expression, including but not limited to, physical drawings or data magnetically or otherwise recorded on computer diskettes, which are prepared or caused to be prepared by Consultant under this Agreement ("Documents & Data"). Consultant shall require all subcontractors to agree in writing that City is granted a non-exclusive and perpetual license for any Documents & Data the subcontractor prepares under this Agreement. Consultant represents and warrants that Consultant has the legal right to license any and all Documents & Data. Consultant makes no such representation and warranty in regard to Documents & Data which were provided to Consultant by the City. City shall not be limited in any way in its use of the Documents and Data at any time, provided that any such use not within the purposes intended by this Agreement shall be at City's sole risk. 6. INSURANCE Consultant shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with Page 2 of 10 the performance of the work hereunder and the results of that work by the Consultant, its agents, representatives, employees or subcontractors. a. Consultant shall not commence work for the City until it has provided evidence satisfactory to the City that it has secured all insurance required under this Section. In addition, Consultant shall not allow any subeonsultant to commence work on any subcontract until it has secured all insurance required under this Section. b. Insurance coverage shall be at least as broad as: (i) Commercial General Liability (CGL): Insurance Services Office Form CG 00 01 covering CGL on an "occurrence" basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this projectilocation (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit. (ii) Automobile Liability: Insurance Services Office Form Number CA 0001 covering, Code 1 (any auto), or if Consultant has no owned autos, Code 8 (hired) and 9 (non -owned), with limit no less than $1,000,000 per accident for bodily injury and property damage. (iii) Workers' Compensation insurance as required by the State of California, with Statutory Limits, and Employer's Liability Insurance with limit of no less than $1,000,000 per accident for bodily injury or disease. (iv) Professional Liability (Errors and Omissions) Insurance appropriates to the Consultant's profession, with limit no less than $2,000,000 per occurrence or claim, $2,000,000 aggregate. (v) If the Consultant maintains broader coverage and/or higher limits than the minimums shown above, the City requires and shall be entitled to the broader coverage and/or the higher limits maintained by the Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City. d. Other Insurance Provisions. The insurance policies are to contain, or be endorsed to contain, the following provisions: (i) Additional Insured Status. The City, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the Consultant including materials, parts, or equipment furnished in connection with such work or operations. Page 3 of 10 General liability coverage can be provided in the form of an endorsement to the Consultant's insurance (at least as broad as ISO Form CG 20 10 11 85 or both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 forms if later revisions used). (ii) Primary Coverage. For any claims related to this contract, the Consultant's insurance coverage shall be primary insurance primary coverage at least as broad as ISO CG 20 01 04 13 as respects the City, its officers, officials, employees, and volunteers. Any insurance or self- insurance maintained by Y.e City, its officers, officials, employees, or volunteers shall be excess of the Consultant's insurance and shall not contribute with it. (iii)Notice of Cancellation. Each insurance policy required above shall state that coverage shall not be canceled, except with notice to the City. (iv)Waiver of Subrogation. Consultant hereby grants to City a waiver of any right to subrogation which any insurer of said Consultant may acquire against the City by virtue of the payment of any loss under such insurance. Consultant agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer. (v) Self -Insured Retentions. Self -insured retentions must be declared to and approved by the City. The City may require the Consultant to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention. The policy language shall provide, or be endorsed to provide, that the self -insured retention may be satisfied by either the named insured or City. (vi)Acceptability of Insurers. Insurance is to be placed with insurers authorized to conduct business in the state with a current A.M. Best's rating of no less than ANTI, unless otherwise acceptable to the City. (vii) Claims Made Policies. If any of the required policies provide coverage on a claims -made basis: • The Retroactive Date must be shown and must be before the date of the contract or the beginning of contract work. • Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the contract of work. Page 4 of 10 • If coverage is canceled or non -renewed, and not replaced with another claims -made policy form with a Retroactive Date prior to the contract effective date, the Consultant must purchase "extended reporting" coverage for a minimum of five (5) years after completion of contract work. (viii) Verification of Coverage. Consultant shall furnish the City with original Certificates of Insurance including all required amendatory endorsements (or copies of the applicable policy language effecting coverage required Ly'uais clause) and a copy of the Declarations and Endorsement Page of the CGL policy listing all policy endorsements to City before work begins. However, failure to obtain the required documents prior to the work beginning shall not waive the Consultant's obligation to provide them. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time. (ix)Subcontractors. Consultant shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Consultant shall ensure that City is an additional insured on insurance required from subcontractors. (x) Special Risks or Circumstances. City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances. 7. INDEMNIFICATION Consultant agrees to defend, and shall indemnify and hold harmless the City, its officers, agents, employees, contractors, special counsel, and representatives from liability: (1) for personal injury, damages, just compensation, restitution, judicial or equitable relief arising out of claims for personal injury, including death, and claims for property damage, which may arise from the negligent operations of the Consultant, its subcontractors, agents, employees, or other persons acting on its behalf which relates to the services described in section 1 of this Agreement; and (2) from any claim that personal injury, damages, just compensation, restitution, judicial or equitable relief is due by reason of the terms of or effects arising from this Agreement. This indemnity and hold harmless agreement applies to all claims for damages, just compensation, restitution, judicial or equitable relief suffered, or alleged to have been suffered, by reason of the events referred to in this Section or by reason of the terms of, or effects, arising from this Agreement. The Consultant further agrees to indemnify, hold harmless, and pay all costs for the defense of the City, including fees and costs for special counsel to be selected by the City, regarding any action by a third party challenging the validity of this Agreement, or asserting that personal injury, damages, just compensation, restitution, judicial or equitable relief due to personal or property rights arises by reason of the terms of, or effects arising from this Agreement. City may make all reasonable decisions with respect to its representation in any legal proceeding. Notwithstanding the foregoing, to the extent Consultant's services are subject to Civil Code Section 2782.8, the above indemnity Page 5 of 10 shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant. 8. INTELLECTUAL PROPERTY INDEMNIFICATION Consultant shall defend and indemnify the City, its officers, agents, representatives, and employees against any and all liability, including costs, for infringement of any United States' letters patent, trademark, or copyright infringement, including costs, contained in the work product or documents provided by Consultant to the City pursuant to this Agreement. .:I*• 9. RECORDS Consultant shall keep records and invoices in connection with the work to be performed under this Agreement. Consultant shall maintain complete and accurate records with respect to the costs incurred under this Agreement and any services, expenditures, and disbursements charged to the City for a minimum period of three (3) years, or for any longer period required by law, from the date of final payment to Consultant under this Agreement. All such records and invoices shall be clearly identifiable. Consultant shall allow a representative of the City to examine, audit, and make transcripts or copies of such records and any other documents created pursuant to this Agreement during regular business hours. Consultant shall allow inspection of all work, data, documents, proceedings, and activities related to this Agreement for a period of three (3) years from the date of final payment to Consultant under this Agreement. 10. CONFIDENTIALITY If Consultant receives from the City information which due to the nature of such information is reasonably understood to be confidential and/or proprietary, Consultant agrees that it shall not use or disclose such information except in the performance of this Agreement, and further agrees to exercise the same degree of care it uses to protect its own information of like importance, but in no event less than reasonable care. "Confidential Information" shall include all nonpublic information. Confidential information includes not only written information, but also information transferred orally, visually, electronically, or by other means. Confidential information disclosed to either party by any subsidiary and/or agent of the other party is covered by this Agreement. The foregoing obligations of non-use and nondisclosure shall not apply to any information that (a) has been disclosed in publicly available sources; (b) is, through no fault of the Consultant disclosed in a publicly available source; (e) is in rightful possession of the Consultant without an obligation of confidentiality; (d) is required to be disclosed by operation of law; or (e) is independently developed by the Consultant without reference to information disclosed by the City. 11. CONFLICT OF INTEREST CLAUSE Consultant covenants that it presently has no interests and shall not have interests, direct or indirect, which would conflict in any manner with performance of services specified under this Agreement. Page 6 of 10 12. NON-DISCRIMINATION Consultant shall not discriminate because of race, color, creed, religion, sex, marital status, sexual orientation, gender identity, gender expression, gender, medical conditions, genetic information, or military and veteran status, age, national origin, ancestry, or disability, as defined and prohibited by applicable law, in the recruitment, selection, teaching, training, utilization, promotion, termination or other employment related activities or any services provided under this Agreement. Consultant affirms that it is an equal opportunity employer and shall comply with all applicable federal, state and local laws and regulations. ter.: 13. EXCLUSIVITY AND AMENDMENT This Agreement represents the complete and exclusive statement between the City and Consultant, and supersedes any and all other agreements, oral or written, between the parties. In the event of a conflict between the terms of this Agreement and any attachments hereto, the terms of this Agreement shall prevail. This Agreement may not be modified except by written instrument signed by the City and by an authorized representative of Consultant. The parties agree that any terms or conditions of any purchase order or other instrument that are inconsistent with, or in addition to, the terms and conditions hereof, shall not bind or obligate Consultant or the City. Each party to this Agreement acknowledges that no representations, inducements, promises or agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any party, which is not embodied herein. 14. ASSIGNMENT Inasmuch as this Agreement is intended to secure the specialized services of Consultant, Consultant may not assign, transfer, delegate, or subcontract any interest herein without the prior written consent of the City and any such assignment, transfer, delegation or subcontract without the City's prior written consent shall be considered null and void. Nothing in this Agreement shall be construed to limit the City's ability to have any of the services which are the subject to this Agreement performed by City personnel or by other consultant and/or contractors retained by City. 15. TERMINATION This Agreement may be terminated by the City upon thirty (30) days written notice of termination. hi such event, Consultant shall be entitled to receive and the City shall pay Consultant compensation for all services performed by Consultant prior to receipt of such notice of termination, subject to the following conditions: a. As a condition of such payment, the Executive Director may require Consultant to deliver to the City all work product(s) completed as of such date, and in such case such work product shall be the property of the City unless prohibited by law, and Consultant consents to the City's use thereof for such purposes as the City deems appropriate. b. Payment need not be made for work which fails to meet the standard of performance specified in the Recitals of this Agreement. Page 7 of 10 16. WAIVER No waiver of breach, failure of any condition, or any right or remedy contained in or granted by the provisions of this Agreement shall be effective unless it is in writing and signed by the party waiving the breach, failure, right or remedy. No waiver of any breach, failure or right, or remedy shall be deemed a waiver of any other breach, failure, right or remedy, whether or not similar, nor shall any waiver constitute a continuing waiver unless the writing so specifies. 17. JURISDICTION -VENUE This Agreement has been executed and delivered in the State of California and the validity, interpretation, performance, and enforcement of any of the clauses of this Agreement shall be determined and governed by the laws of the State of California. Both parties further agree that Orange County, California, shall be the venue for any action or proceeding that may be brought or arise out of, in connection with or by reason of this Agreement. 18. PROFESSIONAL LICENSES Consultant shall, throughout the term of this Agreement, maintain all necessary licenses, permits, approvals, waivers, and exemptions necessary for the provision of the services hereunder and required by the laws and regulations of the United States, the State of California, the City of Santa Ana and all other governmental agencies. Consultant shall notify the City immediately and in writing of its inability to obtain or maintain such permits, licenses, approvals, waivers, and exemptions. Said inability shall be cause for termination of this Agreement. 19. NOTICE Any notice, tender, demand, delivery, or other communication pursuant to this Agreement shall be in writing and shall be deemed to be properly given if delivered in person or mailed by first class or certified mail, postage prepaid, or sent by fax or other telegraphic communication in the manner provided in this Section, to the following persons: To City: Jennifer L. Hall Clerk of the City Council City of Santa Ana 20 Civic Center Plaza (M-30) P.O. Box 1988 Santa Ana, CA 92702-1988 Fax: 714- 647-6956 Page 8 of 10 With courtesy copies to: Nabil Saba Executive Director, Public Works Agency City of Santa Ana 20 Civic Center Plaza (M-xx) P.O. Box 1988 Santa Ana, California 92702 Fax: To Consultant: Adrian Anderson Associate Principal IDS Group, Inc. 1 Peters Canyon Road, Suite 130 Irvine, CA 92606 A party may change its address by giving notice in writing to the other party. Thereafter, any communication shall be addressed and transmitted to the new address. If sent by mail, communication shall be effective or deemed to have been given three (3) days after it has been deposited in the United States mail, duly registered or certified, with postage prepaid, and addressed as set forth above. If sent by fax, communication shall be effective or deemed to have been given twenty-four (24) hours after the time set forth on the transmission report issued by the transmitting facsimile machine, addressed as set forth above. For purposes of calculating these time frames, weekends, federal, state, County or City holidays shall be excluded. 20. MISCELLANEOUS PROVISIONS a. Each undersigned represents and warrants that its signature herein below has the power, authority and right to bind their respective parties to each of the terms of this Agreement, and shall indemnify City fully, including reasonable costs and attorney's fees, for any injuries or damages to City in the event that such authority or power is not, in fact, held by the signatory or is withdrawn. b. All Exhibits referenced herein and attached hereto shall be incorporated as if fully set forth in the body of this Agreement. [signatures on following page] Page 9 of 10 SIGNATURE PAGE FOR CONSULTANT AGREEMENT BETWEEN CITY OF SANTA ANA AND IDS GROUP, INC. FOR ON -CALL ENGINEERING SERVICES IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year first above written. ATTEST: CITY OF SA7A L KRISTINE RIDGE lerk City Manager APPROVED AS TO FORM: SONIA R. CARVALHO City Attorney By: J HAN T. MART Z Assistant City Attorney RECOMMENDED FOR APPROVAL: /4r�BIti BABA (/ Executive Director Public Works Agency CONSULTANT: SAID HILMY President Page 10 of 10 EXHIBIT A SCOPE OF SERVICES Appendix ATTACHMENT SCOPE OF WORK CITY OF SANTA ANA REQUEST FOR PROPOSALS FOR ON -CALL ENGINEERING SERVICES RFP NO.23-030 INTRODUCTION/BACKGROUND The City of Santa Ana intends to retain Civil Engineering Consultants on an as -needed or "on -call" basis. A Professional Services Agreement will be entered into with several of the qualified firms Civil Engineering consultant(s) to provide professional services for a variety of projects on an on -call basis. On an on -call, as -needed basis, the selected firm(s) may later be asked to provide professional engineering services proposals on specific, project -by -project basis, based on an agreed -upon specific scope of services and fees. In general, work consists of general engineering design projects. Funding sources for each project may vary for each project/task order assigmnent shall comply with the funding agency's requirements. The projects may include water and sewer infrastructure design and rehabilitation improvements, storm drain improvements; sidewalks, bike paths, curb and glitter replacement; slung seal of residential streets; repair and overlay of asphalt concrete and/or PCC streets; signing, striping, neighborhood traffic studies, traffic signal modifications; landscaping and irrigation systems; park and recreational design, grant application writing, and other related projects as required. On occasion, environmental and planning support services may also be requested. The City may need consultant services for mapping and legal description preparation, construction management, staking and inspection. Occasionally the City may also need geotechnical, electrical, mechanical, structural, and other specific infiastructure related services. The consultant shall be able to assist the City through this contract to provide the necessary services. The consultant shall utilize in-house staff and/or sub -consultants to complete the assignments to meet the City standards. For specialized work for which the prime consultant shall require a sub -consultant, the prime consultant shall serve as an administrative liaison between the City and the sub -consultant. Prime consultant mark-ups for sub -consultant work will not be allowed. All proposals, plans, drawings, specifications, estimates, grant applications, and/or studies will be subject to the final approval and satisfaction of the City of Santa Ana. City of Santa Ana RFP 23-030 Page A1.1 Scope of Services The work consists of general engineering design and cost estimating for civil works projects, City facilities, Parks and other related projects as required. The work in general, consists of work in the following areas and not limited to: Civil- Design • Transportation/Traffic - Structural • Geotechnical - Land Surveying • Architectural • Landscape Architectural and Irrigation - Environmental • Electrical • Mechanical • Instrumentation and Control Systems • Fire Protection • Land Surveying • Financial and Economic Consulting Engineering In addition to general engineering design projects Consultants may be asked to perform the following tasks: - Hydraulic modeling of the water distribution, storm water, and sewer collection systems - Evaluations, studies and recommendations related to water wells, reservoirs, water treatment systems, disinfection systems, pressure control systems, and sewage lift stations, - Electrical and industrial control systems evaluations, studies, drawings, documentation and recommendations • Mapping Services - Legal Description Preparations • Grant Writing- Services - Environmental/Planning Support • Construction Management Support • Pavement Management • Special Engineering Studies/Reports/Compliance and Investigations - Regulatory Compliance with Federal and State and Local Agencies - Financiallcash flow analysis- public works programs • Assessment and District Formation Services Sustainable Infrastructure Services - Right of Way Studies If there are any exceptions to the core of requested services, proposers shall list said exceptions in their proposal (matrix form). City of Santa Ana RFP 23-030 Page Al-2 For specialized work for which the prime consultant shall require a sub -consultant, the prime consultant shall serve as an administrative liaison between the City and the sub -consultant. The selected consultants mast have the expertise, experience, and demonstrated resources available to perform the work described in this RFP. General Requirements and Proiect Deliverables The Consultant's services for plans specifications and estimating (rS&E) for engineering project preparation and special studies/investigations shall include and in be in conformance with the latest editions of the following: Title 24 of the California Code of Regulations (California Building Standards Code). American Water Works Association, California Department of Transportation, the Americans with Disabilities Act, the City of Santa Ana Municipal Code (SAMC), professional Standards established by the City, and or federal, state and local guidelines established in the project. As part of the preparation of the PS&E, the consultant shall prepare the special provisions pertaining to the items of work included in the plans that are not addressed on the latest editions of the applicable standards. The Consultant shall have complete responsibility for the accuracy and completeness of all documents and plans prepared. The plans will be reviewed by the City of Santa Ana for conformity with the requirements of the Agreement. Reviews by the City of Santa Ana do NOT include detailed review or checking of design or the accuracy with which such designs are depicted in the documents and the plans. The documents and plans furnished under the Agreement shall be of a quality acceptable to the City of Santa Ana. The criteria for acceptance shall be a product of neat appearance, well organized, technically and grammatically correct, checked, and dated and having the maker and checker identified. The Consultant shall have project management control procedures in effect during the entire time work is being performed under the Agreement. This task shall include the following: • Project Management Plan — the consultant shall provide a detailed management plan including information and coordination with other agencies to ensure compliance and completion of the (PS&E) packages. This plan shall include all milestones and task breakdown for each of the tasks and subtasks included therein. The project management shall be submitted to the Project Manager for review and within 15 calendar days of the issued Notice to Proceed • Deliverables • Quality Control/Quality Assurance (QA/QC) Plan • Project Schedule/Invoicing • Project Correspondence In case of conflict, ambiguities, discrepancies, errors, or omissions, the consultant shall submit the matter to the City for clarification. City of Santa Ana RFP 23-030 Page Al-3 The Consultant shall perform engineering design services resulting in contract documents (plans, specifications and cost estimates "PS&E") for various projects on an as -needed basis. However, work tasks may include studies or a variety of engineering tasks. If requested by the City, the Consultant shall provide a Work Plan which includes a detailed schedule of the assigned project prior to the issuance of Notice to Proceed and/or Task Order. Specific Task Orders with Notices to Proceed ("NTPs") will be provided for project(s) at the discretion of the City. Work required per Task Order shall comply with the Scope of Services and additional provisions in each Task Order and this agreement. The following services/items shall include but are not be limited to: 1. Research existing records of utility companies and agencies and coordinate the proposed improvements with existing field conditions. 2. Conduct an environmental assessment for each project and prepare all documentation required to comply with California Environmental Quality Act (CEQA), and or National Environmental Protection Act (NEPA). (If required) 3. Provide all field survey and topographic work necessary to complete the design effort. Design level survey and base mapping of the project site shall be prepared in US Customary English units by a California licensed Land Surveyor in accordance with the City guidelines and in Microstation V8i Computer Aided Design and Drafting (CADD) format. The horizontal datum shall be NAD 83 and the vertical datum shall be NAVD 88. All survey field notes shall be on forms provided by the City, shall be neatly completed in pencil, and shall become property of the City upon completion of the project. Informal field investigations including marking of removal areas may be required for some of the sidewalk, curb and gutter, and pavement replacement projects. 4. Complete the design of projects including plans, specifications, and engineer's construction cost estimate. The Consultant shall contact manufacturers and/or contractors to verify the engineer's estimate prior to submitting to the City. Specifications shall be prepared in Microsoft Word and an electronic copy of the final version shall be furnished to the City. The City will provide the specification boilerplate to the Consultant. 5. if requested, all preliminary and bid sets of plans shall be plotted on bond or velum paper using Microstation V8i CADD software program. All drawings shall be completed per the City of Santa Ana CADD Standards and any special provisions thereof. For interim submittals, the City may opt to receive only PDF versions of the plans for reviewing purposes. If so, the Consultant team will provide plans and/or specifications accordingly. 6. All original plan sheets, the title sheet of the specifications, calculations, and reports shall be signed and stamped by the Consultant's licensed professional engineer responsible/in-charge of the project. City of Santa Ana RFP 23-030 Page Al-4 If a pact of the on -call project scope, the Consultant shall provide support services during the bidding and construction phases of the project, including, but not limited to: a. Respond to bidder inquiries during the bidding process, including preparation of any addenda. Following award of the construction contract, the Consultant shall attend the pre -construction meeting. b. Review and approve all submittals and shop plan drawings required supporting the constriction contract. The Consultant shall complete shop drawings reviews within two (2) weeks of receipt. Contract Change Order revi ,r,vs shall be completed within two (2) working days of receipt. c. Respond to written Requests for Information (RFI) to provide clarification or resolve discrepancies in the contract documents. Responses shall be completed within three (3) working days. d. Provide periodic field reviews and bring to the attention of the City of Santa Ana any defects or deficiencies in the work by the construction contractor which the Consultant may observe. The Consultant shall have no authority to issue instruction on behalf of the City of Santa Ana, or to deputize another to do so. 8. If included in the on -call project scope, upon completion of construction, the Consultant shall prepare as -built plans and submit them to the City. The Consultant shall incorporate all changes to the plans electronically with all necessary revision notations. Once plans have been updated, a signed set of as -built plans shall be submitted to the City with an electronic copy (in Microstation V8i CADD and pdf formats) of the final as -built drawings via CD ore - mail. 9. The Consultant shall monitor the project progress, maintain project files, and control the quality of the work performed by in-house staff and/or sub -consultants. Incomplete (not meeting targeted completion) or poor quality work will not be accepted. The Consultant shall revise the documents within a revised schedule set by the City, which may require overtime. No additional compensation necessary for the consultant to complete this work to the satisfaction of the City shall be approved by the City for the required revisions. It is the responsibility of the Consultant to produce a professional -level quality of work product. 10. If included in the on -call project scope, attend meetings with the City staff as required. 11. If included in the on -call project scope, the Consultant shall coordinate plan check, design topics, permits and any other issues with the City, other Agencies, and all utility companies as required. At the direction of the City, the Consultant shall be the liaison with affected agencies. 12. If included in the on -call project scope, the Consultant shall be responsible for reviewing and approving addenda and clarifications to plans and specifications. All information regarding the plans and specifications and or documentation related to the project and approved by the City, will then become property of the City. City of Santa Ana RFP 23-030 Page Al-5 A more detailed scope of work will be provided when/if a specific project or Task Order proposal is requested of a consultant. All tasks orders shall include the staff title, hours, hourly rate and totals as related to the project. Construction Plans, Standard Specifications and Estimate (PS&E) Preliminary Design - Attend project scope meeting with City Staff to review project details. Consultant shall field review, inspect and conduct all necessary surveys to prepare a Preliminary Design Report (PDR) or alternatives, preliminary cost estimate and preferred alternative as requested by the project manager. A (PS&E) package shall be submitted to review at 30% design for independent City review. A (PS&E) package shall be submitted to review at 60% design for independent City review. A (PS&E) package shall be submitted to review at for FINAL independent design review. The City will review and comment on the PS&E packages with a turnaround goal of (2) weeks. One (1) copy of the documents with comments will be returned to the consultant. Unless, several agencies are involved in the review process multiple documents with comments will be provided to the consultant. After the final design comments have been incorporated the consultant shall provide the City with final (PS&E) package ready forbid. See Section - General Requirements and Project Deliverables Section. Proiect Schedule and Progress: Progress review meetings shall be held at intervals deemed appropriate by the City. The Consultant shall furnish two copies of all completed work or partially completed update/status since the last progress review meeting. Progress reports shall be submitted monthly in electronic format indicating achievements and project schedule progress. City Resuonsibilities: The City will provide information in its possession relevant to the preparation of the required information in the RFP. The City will provide only the staff assistance and the documentation specifically in referred to herein. Furnish scope of work and provide general direction as needed for the assigned project All plan check coordination within the City - Advertise, award, and administer of construction contract Electronic files (sample plans & specifications, City of Santa Ana's CADD Standards) Electronic files for title sheets and sheet borders Facilitate meeting space and coordination and City facilities City of Santa Ana RFP 23-030 Page Al-6 Fee Proposal: hi addition to Section IV.B.3 (Submittal Requirements: Fee Proposal) fee schedule shall be structured as follows: The fee proposal shall include the film's standard hourly fee schedule, and/or project fee schedule where applicable and as outlined in this this documents. A list of all positions and hourly rates required to perform the services described herein shall remain valid for one (1) Rill calendar year following contract execution. Subsaruent rates shall be renegotiated between the firm and the City. A more detailed scope of work will be provided when/if a specific project or Task Order proposal is requested of a consultant. Other Terms and Conditions: 1. The project will be implemented in compliance with the City of Santa Ana's policies, as well as Prevailing Wages and State/Federal Requirements. 2. The City regards the inclusion of California based designs, engineering, and construction professionals, facilities, and services as part of the Team to be highly desirable, but not mandatory. 3. The City reserves the right to amend this Request for Proposal by addendum prior to the final dates of submission. 4. All reports, proposals, or other data or materials which are submitted shall become the sole property of the City of Santa Ana with the exception of the confidential Financial Capacity information and sealed fee proposals which will be returned to all proposers after award of contract to the selected Team 5. All products used or developed in the execution of any contract resulting from this request will remain in the public domain at the completion of this project. 6. The City has an affirmative action program. The purpose of the affirmative action program is to encourage certified minority business enterprises and women business enterprises. All submitting firms must have established affirmative action programs approvable by the City. During the RFP stage, all firms will need to complete a "Certification of Non -Discrimination by Contractors" for each firm on their team. City of Santa Ana RFP 23-030 Page At-7 EXHIBIT B CONSULTANT'S PROPOSAL .1 A ■ City of Santa Ana On -Call Engineering Services RFP #23-030 March 14, 2023 Submitted by: IDS GROUP 1 Peters Canyon Road, Suite 130, Irvine, CA 92606 T: 949.387.8500 A F: 949.387.0800 A www.idsgi.com AA IDS GROUP March 14, 2023 Mr. Sean Thomas City of Santa Ana Public Works Agency 20 Civic Center Plaza, M-36 Santa Ana, CA 92701 SUBJECT: Request for Proposals I On -Call Engineering Services RFP No. 23-030 Dear Mr. Thomas, IDS Group, Inc. (IDS) understands that the City of Santa Ana (City) is in the process of pre -qualifying firms for various capital improvement projects within the City. IDS appreciates the opportunity to submit its qualifications for the City's capital improvement program for the next three years. IDS is an award -winning engineering -architectural (E/A) firm which offers multi -disciplinary consulting services through a staff of 80 professionals. In addition to civil engineering, IDS provides specialized in-house — structural, electrical, mechanical, plumbing engineering services, architecture, landscape architecture, and cost estimating services. IDS' Value to the City of Santa Ana • Team Expertise: IDS' civil engineering team will be working directly with the City, providing local knowledge in site engineering designs for municipal projects. Our civil engineering's street rehabilitation, storm water improvements, traffic, and ADA design capabilities balance costs with our client's objectives and permitting requirements. IDS' Project Manager, Adrian Anderson, brings 25 years of civil engineering expertise collaborating with municipalities and regional agencies across Southern California where he has overseen teams that provide similar scope -of -services to the City. Our in-house expertise will be enhanced by our land surveying and geotechnical engineering partners to allow us the ability to explore the best possible engineering solutions and greatest potential benefit for the City and project success. • Civil Engineering Services Focused on Public Agencies: The IDS team has completed similar project elements for many public and municipal agencies including the City of Rialto, City of Chino, County of Los Angeles, County of Orange, City of San Bernardino, County of Riverside, City of Riverside, City of West Covina, City of La Palma, City of Glendora, City of Murrieta, City of Menifee, City of Long Beach, City of Anaheim, City of Costa Mesa, City of Huntington Beach, City of Fountain Valley, City of La Habra, and the City of Irvine. • Positive Client Track Record: A testament to the quality of our customer service is represented by the fact that approximately 80% of our clientele is repeat business. 1 Peters Canyon Road, Suite 130, Irvine, California 92606 ♦ 949.387.85000 ♦ 949.387.0800 ♦ w idsgi.com Mr. Sean Thomas March 14, 2023 Page 2 Mr. Adrian Anderson, PE, Associate Principal - Civil Engineering Division of IDS Group, will be the main point -of -contact for the City. Any questions pertaining to our submittal can be directed to Adrian at 949.387.8500 Ext. 509 or via email adrian. anderson@idsgi.com. Mr. Said Hilmy, PhD, SE, LEED AP, Principal of IDS Group, hereby acknowledges that he will be the contract administrator for this submittal and will negotiate and contractually bind the firm regarding matters pertaining to this submittal. We thank the City of Santa Ana for the opportunity to submit these qualifications. IDS acknowledges receipt of Addendum No. 1 dated February 27, 2023. IDS takes no issue to Appendix Attachment 2 - Agreement. The IDS team looks forward to applying its technical expertise and providing design solutions to the challenges faced by the City of Santa Ana. Sincerely, IDS Group, Inc. Adrian Anderson, PE Associate Principal - Civil Engineering Division i _SO Said Hilmy, PhD, SE, LEED AP Principal / Contract Administrator IDS GROUP City of Santa Ana I On -Call Engineering Services RFP NO.: 23-030 Table of Contents 1. Statement of Qualifications a. Cover b. Contract Sgreement c. Firm and Team d. Understanding of Need...............................................................................................................................20 e. Agreement f. Referen 2. Scope of Services and Schedule.................................................................................................25 3. Fee Proposal (Submitted in a separate sealed envelope and electronically in PlanetBids) 4. Certifications.......................................................................................................................................................29 Attachment 3-1: Non -Collusion Affidavit Attachment 3-2: Non -Lobbying Certification Attachment 3-3: Non -Discrimination Certification _ IDS GROUP Page iv IAP fffsm i 1. Firm and Team Experience City of Santa Ana I On -Call Engineering Services RFP NO.: 23-030 Firm Profile IDS Group, Inc. (IDS) is a multidisciplinary architectural and engineering consulting firm with roots spanning over 60 years. With a staff of over 80 professionals, our integrated design team provides added value through our specialized divisions — architecture and structural, civil, mechanical, plumbing, and electrical engineering, as well as cost estimating services, maximizing service efficiency. IDS is committed to project excellence, providing turnkey design solutions to the building and infrastructure industries. IDS incorporates sustainable, energy -efficient, and environmentally conscious designs as a significant component of each project. We are recognized for our use of water -efficient plant materials, recycled materials, and water -efficient irrigation systems. IDS is a member of the Green Building Council, on design teams for LEED-certified building projects, and employs numerous full-time LEED Accredited Professionals. IDS is headquartered in Irvine, CAwith offices in LosAngeles and San Diego, ensuring local knowledge and providing our clients with quick response time. As a multi -disciplinary engineering and architectural firm, IDS has the practical knowledge, insight, and resources to offer comprehensive services and specialized solutions to our clients. In -House Services "IDS" stands for Integrated Design Services, as our service delivery model. We bring a focused understanding of engineering and architectural services to public agencies with an inherent curiosity, sound technical expertise, where we apply this knowledge to each project's unique set of circumstances. Civil Engineering The Civil Engineering division of IDS was established in 1961 in Irvine, California. Through a series of acquisitions and mergers, the company expanded to include all of the disciplines needed for engineering design services. IDS Group provides specialized civil engineering design, planning and entitlement, surveying and mapping, construction survey, LEED, sustainable design, construction administration, and traffic engineering services to public agencies, owners, and developers of retail, commercial, office, industrial, institutional, and residential projects throughout the United States. IDS GROUP, INC. 60 PROVIDING INTEGRATEU DESIGN SERVICES Year Incorporated in California: 2999 Form of Organization: California S Corportiun Number of Employees: 80 Office Locations: Corporate Headquarters: 1 Peters Canyon Rd., Ste. 130 Irvine, CA l 75 Personnel 11845 West Olympic Blvd., Ste. 515 Los Angeles, CA 90064 ♦ 3 Personnel 9636 Tierra Grande, Suite 200 San Diego, CA 92126 ♦ 2 Personnel How We Differ QL1 our Ince9rz[ee.11.1. learn provides added value mmu& our speeai zed I, Apuse divisors It- ae, ea pmiessmnals maum zing seMm etlitleery A:-'3 IDS GROUP Page 2 City of Santa Ana I On -Call Engineering Services RFP NO.: 23-030 The following lists illustrate our in-house civil engineering and capabilities: Civil Engineering • Preparation of Construction Documents • Pavement Rehabilitation Plans • Traffic Control Plans • Signing and Striping Plans • Street Improvement Plans • Strut/Intersection Widening • Rough and Precise Grading Plans • Storm Drain Improvement Plans • Hydrology and Hydraulic Analysis and Reports • Water Quality Management and Design • Detention and Retention Basins Design • Sewer Improvement Plans • Domestic Water Improvement Plans • Dry Utility Coordination • Joint Utility Plans • Slope Protection Plans • Underground Fire Improvement Plans • Street Lighting Plans • Storm Water Pollution Prevention Plans • Utility Tunneling Plans • Construction Cost Estimates • Permit Processing Surveying and Mapping • Topographic Maps and Aerial Mapping • Encumbrance and Utility Maps • Boundary and Lot Surveys • ALTA Land Title Surveys • Tentative Parcel and Tract Maps • Condo Plans • Lot Line Adjustments • Parcel Mergers • Record Data Maps • Final Maps • Record of Surveys • Legal Descriptions and Plats for Easements • Dedications and Vacations • GPS and GIS Surveys Construction Survey • Construction Staking for Grading • Paving and Hardscape • Curb and Gutter/ Improvement Staking • Site Layout • Building Control • Utilities Our civil team offers a wide array of expertise and experience working on street improvements including pavement rehabilitation and ADA compliance projects. Our Civil Engineer's roadway, ADA, traffic, signing and striping design capabilities balances costs first with our client's objectives and permitting requirements. Our utility design experience includes the design and rerouting of water lines, sewer systems, storm drain systems, electrical power, and data lines. Our team also provides preliminary engineering studies and master planning through final design and construction support for public works, drainage facilities, hydrology and hydraulics, water utilities, sewerand dry utilities. Our survey department provides all design surveys, topographic surveys, boundary, ALTA, right-of-way engineering and construction surveys for public works and private sector projects. IDS seamlessly integrates civil engineering services with in-house design professionals who specialize in structures, mechanical, electrical, plumbing, and architecture in order to provide a well-rounded balance of design capabilities for our clients as a value-added service. City of Anaheim ARTIC Path of Travel to Angels Stadium A.AL IDS GROUP Page 3 City of Santa Ana I On -Call Engineering Services RFP NO.: 23-030 Structural Engineering Our structural engineering division is a recognized leader in the design, assessment, review, and seismic retrofit of buildings and site improvements. The depth of our work includes the design of new buildings utilizing steel, concrete, and masonry, the assessment and retrofit of numerous buildings of all sizes, the evaluation, and repair of distressed structures, peer and plan review, constructability review, and forensic engineering. Our team has been honored by numerous local and national awards for innovative and outstanding design, including the Project of the YearAwards byASCE. Before the closure of the El Toro Marine Base, IDS conducted Structural Engineering assessment of all existing buildings. Architecture IDS' architectural division provides design, planning, programming, project management, and renovation services to public and private clients throughout California. Our architectural services involve building assessments, alterations, and modifications, accessibility studies, ADA compliance studies and design, ZNE, LEED, fire and life safety assessment and design, code review, space planning, remodeling, repair of damaged and deteriorated structures, and expansions and additions to existing facilities. Our architectural services involve building assessments, alterations, and modifications, accessibility studies, ADA compliance studies and design, fire and life safety assessment and design, code review, space planning, remodeling, repair of damaged and deteriorated structures, and expansions and additions to existing facilities. Project experience of IDS staff encompasses new construction, renovation, re -adaptation, and tenant improvements to a variety of building types. *, IDS GROUP Landscape Architecture IDS has a dedicated team that specializes in building healthy places for communities through the practices of landscape architecture and ecological restoration. The team focuses on the relationship between land and people where we are only as healthy as our surroundings. Most of the team's work lies in municipalities, counties and other California agencies working closaiy with clients and stakeholder groups to design and build healthy communities and improve quality of life. The projects designed draw from natural and cultural histories of the land and improve the natural ecological systems. Specialized expertise includes historic preservation, adaptive re -use, cultural landscapes, cultural and natural history interpretation, ecological restoration, sustainable design, drought tolerant planting, low water irrigation systems, and context -integrated design. Mechanical and Plumbing Engineering Our award -winning mechanical engineering division is comprised of professional engineers and designers who are experts in the fields of heating, ventilating, air conditioning, plumbing, piping, and fire protection. We have provided design services for HVAC, plumbing, and fire protection systems for countless public projects and facilities. These projects encompass new construction, retrofit, modernization, and expansions of facilities. Our work has received the highest recognition from ASHRAE on numerous occasions. Electrical Engineering IDS' electrical engineering division brings extensive experience in a wide variety of projects that includes the preparation of engineering studies, analyses, plan reviews, preparation of drawings and specifications for new construction projects; construction cost estimates; field investigations; concept studies; reports, and post -construction support for electrical engineering projects. Page 4 2 City of Santa Ana I On -Call Engineering Services RFP NO.: 23-030 Cost Estimating Our in-house cost estimator is experienced in supporting both new construction and complex renovation projects, and possess extensive knowledge of a variety of tenant improvement types. Utilizing the latest in cost control methods, IDS ensures clients' projects are well planned and expertly executed. In the delivery of its cost 'services, IDS provides reliable, accurate estimates while meeting its client's most critical deadlines. Sustainable Engineering The firm's project approach begins with a complete assessment of project requirements to achieve a LEED certification or provide a sustainable design without certification. To meet the project requirements our team will investigate all sustainability options including photovoltaic solar system, commercial and residential fuel cell systems, geothermal ground source heat pump systems, low energy LED lighting products, water conservation design solutions, day lighting harvesting, low -flow plumbing fixtures and high SEER air conditioning equipment. Zero Net Energy (ZNE) IDS' professional mechanical, electrical, and plumbing engineers are experienced in Net Zero Engineering. Our team seeks ways to improve the efficiency of HVAC and electrical systems in buildings and apply smart net -zero energy design and strategies. ADA Access Compliance Our expert ADA (Americans with Disabilities Act) team offers detailed ADA facility surveys and preparation of Transitional Plans, plan reviews, training, and product consulting on a regular basis to healthcare facilities, large corporations, and federal, state and local government clients. *, IDS GROUP Bidding and Construction Administration Support IDS has significant experience with providing practical, cost effective, fastlefficient solutions and high -quality construction documents and drawings and significant experience in construction support and on -site construction administration services for public projects. Building Information Modeling (BIM) Building on decades of hands-on experience in Building Information Modeling (BIM), IDS is committed to creating value for our clients through innovative and fully integrated design solutions. IDS' BIM platform helps our multi -discipline design and construction teams improve project efficiency by optimizing performance and response - time of visualizations and simulations to create unprecedented data rich models. Our clients are experiencing the benefits of BIM that extend long past the completion of a project - including improved constructability, better -performing buildings and more efficient project delivery. They have also included Construction cost savings, Schedule compression and Energy reductions. Page 5 City of Santa Ana I On -Call Engineering Services RFP NO.: 23-030 Sub -Consultant Teaming Partners AESCO (Geotechnical and Environmental Engineering) AESCO is headquartered in Huntington Beach, California and currently have eighteen employees. The firm is SBE, DBE, WBE, and CBE certified. AESCO's laboratory is certified by DSA, Caltrans and City of Los Angeles. AESCO has been involved in a number of projects involving geotechnical and environmental engineering and QA/QC construction materials testing and inspection for the City of Santa and other Southern California public agencies. AESCO's scope of work for geotechnical engineering includes foundation and pavement design, settlement problems, compaction monitoring and testing, shallow and deepened foundations, pressure injected footings, earth retaining structures, landslide analysis and control, expansive/collapsing soils, underpinning and special foundations, construction dewatering and drainage, pipelines and utilities, liquefaction analyses, and fault evaluation; laboratory testing is performed using ASTM, AASHTO, and other applicable specifications and guidelines; environmental engineering including Phase II investigations for hydrocarbons and heavy metals, methane testing, soil vapor monitoring; and construction materials testing and inspections including mortar, masonry, concrete, reinforcing steel, soils, welding, fireproofing, rebar, aggregate, asphalt, and structural steel. Relevant Project Experience with the City of Santa Ana • Civic Center Drive Repavement Coast Surveying (Surveying, Mapping) Founded in 1981, CoastSurveying, Inc. (Coast) specializes in surveying, mapping, aerial photogrammetry, and right-of-way mapping. Approximately 95% of the firm's work is for public agencies throughout Southern California. Coast is certified DBE, SBE, and MBE and has a staff of 20 with four highly qualified and licensed professional land surveyors. Coast has built a solid reputation by consistently performing quality services, responding immediately to client requests, and delivering timely and budget -sensitive projects. The firm has supported numerous clients on project sites, and depending on the requirement's urgency, survey crews' mobilization has occurred within 24 hours ofthe 'notice to proceed.' At Coast, their mission is to perform all work at a level that exceeds the standard level of care for the surveying profession. This objective encompasses making quality control checks at every stage of every project, from initial scope review and cost estimating, through field surveying and the generation of deliverables, to final invoicing. Coast employs proven project control methods for both field surveys and office tasks. They believe that every Coast team member has a role in ensuring the information we deliver to our clients is the requested information and delivered on schedule and within budget. Coast has found that no single surveying task is the same as another. They are flexible to adapt methods and quality controls to fit each challenge. This approach is critical to successfully meet clients' needs. Relevant Project Experience with IDS • Los Angeles World Airports - Roadways, Utilities, and Enabling (RUE) Projects *- IDS GROUP Page 6 U 0o v i Q • I y I C 1I Q J tr N W b D E m W e S c S U c ❑ w a N w Ev O ro p p ro a t� �" rJi >�i W� in �, L? UN pp ❑ii TG fin, V_c E� V • Q w V W � E d z - u m c4 ro a c Q Y C C S E d ro > D c Y L Y o i � Ul w L_ N N 9 m ❑ E C N J U d` Y u F • Na ry o FU ro > w a O. C uNQ. i L w << d V �p C J C a v O w ow ae m> Tq roA ca roA Z0a= V V � ❑ � � � �4 Education BS, Civil Engineering, California State University, Long Beach Professional Credential Civil Engineer, CA #60955 Education BS, Civil Environmental Engineering, University of Southern California Professional Credentials Civil Engineer, CA#68486 Storm Water Pollution Prevention Plan (SWPPP) Qualified SWPPP Developer (QSD) Qualified SWPPP Practitioner (QSD) CA, #23488 A__W, IDS GROUP City of Santa Ana I On -Call Engineering Services RFP NO.: 23-030 Adrian Anderson, PE Associate Principal / Civil Project Manager Adrian has over 25-years of experiencewith various street improvement projects ranging from new roadway alignment studies, to widening and rehabilitation, ADA access, and active transportation. He leads the civil engineering group at IDS overseeing PS&E tasks, project reports, and other civil documents. . Relevant Project Experience • Los Angeles World Airports, Roadways, Utilities & Enabling Projects, Paving & Street Design • Los Angeles World Airports, Roadways, Utilities & Enabling Projects, Security & Gate Improvements • Riverside County Sheriff Dept., Coroner Facility Parking Lot Improvements, Drainage, and Water Quality • City of Orange Water Division Warehouse Replacement & Relocation • Pierce College Storm Water Implementation • Cal Poly Pomona Arabian Horse Center Restoration Storm Drain System and Treatment Nathan Kerstiens, PE, QSD/QSP Civil Engineer Mr. Kerstiens provides advance knowledge of civil engineering design and technical guidance to the civil and CAD production teams. He brings quality to each project undertaken at IDS from design through construction. Relevant Project Experience • Los Angeles World Airports (LAWA), Roadways, Utilities & Enabling Projects, Security & Gate Improvements • Topanga Elementary Charter School Access Design, Paving and Drainage Improvements • City of Chino, Riverside Drive ADA Access Ramp • City of Chino, Pipeline Ave ADA Access Ramp • County of Orange Yale Navigation Center • Martin Luther King Jr. Medical Center Storm Water Quality Treatment Plans a Education BS, Civil Engineering, California State University, Long Beach Professional Credential Civil Engineer, CA #C94131 Education Bachelor of Science, Civil Engineering, University of the Philippines Professional Credential Engineer -in -Training (EIT) A 4 IDS GROUP City of Santa Ana I On -Call Engineering Services RFP NO.: 23-030 Jason Wetterich, PE Civil Engineer Jason is highly skilled in civil design where his expertise is in grading, hydrology and water quality management studies for both public agency and private projects. He utilizes both Civil 3D and AutoCAD for production work on a daily basis. Relevant Project Experience • Los Angeles World Airports, Roadways, Utilities & Enabling Projects, Paving & Street Design • Los Angeles World Airports, Roadways, Utilities & Enabling Projects, Security & Gate Improvements • Riverside County Sheriff Dept., Coroner Facility Parking Lot Improvements, Drainage, and Water Quality • City of Orange Water Division Warehouse Replacement & Relocation • Mt. San Antonio College Sow Barn and Sheep Sorting Pens Low Impact Development (LID) and Drainage Improvements Abbegail Roman-Esperanza, EIT Sr. Civil Designer and Storm Water Compliance Ms. Roman-Esperanza leads IDS' civil team in the design of storm drains and water quality and quality control of project that entail storm water design and studies. She is a thoughtful team player who takes a proactive and engaged approach to working with her colleagues and public agency stakeholders. Relevant Project Experience • Riverside County Sheriff Dept., Coroner Facility Parking Lot Improvements, Drainage, and Water Quality • Pierce College Storm Water Implementation • Mt. San Antonio College Sow Barn and Sheep Sorting Pens Low Impact Development (LID) and Drainage Improvements • Cal Poly Pomona Arabian Horse Center Restoration Storm Drain System and Treatment Page 9 O Education Master of Architecture, Southern California Institute of Architecture Professional Credential Architect, CA#C15573 Education Master of Science, Civil Engineering, University of Southern California Bachelor of Science, Civil Engineering, University of Southern California City of Santa Ana I On -Call Engineering Services RFP NO.: 23-030 John Silber, RA Lead Architect Mr. Silber has been an active member of the architecture and urban design of Southern California for more than 30 years. As an award - winning architect John's experience covers a broad range of urban projects, including a number in areas of special interest, such as the link public education creates betwee , culture and economic vitality. Relevant Project Experience • Los Angeles World Airports, Roadways, Utilities & Enabling Projects, Security & Gate Improvements • City of Orange Water Division Warehouse Replacement & Relocation • City of Irvine Bill Barber Park Shade Structure • City of Norwalk Transportation & Public Facility Improvement • City of Commerce Veterans Memorial Park Recreation Center Faisal Dakhil, BSCE, MSCE Cost Estimator Mr. Dakhil has over 30 years of pre -construction, construction management, and estimating experience in a wide spectrum of projects ranging in values from $1 million to more than $250 million. As Senior PM and Chief Estimator, Faisal has accumulated a long track record of successful jobs coming in under budget and on -time, resulting in substantial savings for the clients. Relevant Project Experience • Mt. San Antonio College Sow Barn and Sheep Sorting Pens Low Impact Development (LID) and Drainage Improvements • County of Orange Yale Navigation Center • City of Glendora Finkbiner Park, Glendora, CA • City of Commerce Veterans Memorial Park Recreation Center • City of Irvine, Bill Barber Park Shade Structures, Irvine, CA "',,, IDS GROUP Page 10 Education Doctorate, Structural Engineering, Cornell University MS, Structural Engineering, Cornell University BS, Civil Engineering, Cairo University Professional Credentials Civil Engineer, CA#C-43988 Structural Engineer, CA#S-3680 LEED Accredited Professional Education MS, Structural Engineering, California Polytechnic University, Pomona Professional Credentials Structural Engineer, CA #S5186 Civil Engineer, CA#C42855 City of Santa Ana I On -Call Engineering Services RFP NO.: 23-030 Said Hilmy, PhD, PE, SE, LEED AP Principal / Contract Administrator Dr. Hilmy has over 29 years of experience in structural engineering design and analysis and project management. Mr. Hilmy specialties are related to providing organizational leadership with a focus on quality control in the delivery of construction documents as well as excellent customer service. Relevant Project Experience • Los Angeles World Airports, Roadways, Utilities & Enabling Projects, Paving & Street Design • Los Angeles World Airports, Roadways, Utilities & Enabling Projects, Security & Gate Improvements • Riverside County Sheriff Dept., Coroner Facility Parking Lot Improvements, Drainage, and Water Quality • City of Orange Water Division Warehouse Replacement & Relocation • Pierce College Storm Water Implementation • Cal Poly Pomona Arabian Horse Center Restoration Storm Drain System and Treatment Jaime Rosenbach, PE, SE Lead Structural Engineer With over 32 years' experience in the field of structural design, Mr. Rosenbach has been involved in the design of newstructures, evaluation and retrofit of existing structures, remodels and modernization of existing buildings, and has conducted and reported numerous forensic seismic investigations. Jaime has extensive field experience having provided construction administration services as well as code compliance review services and plan check services for numerous projects. Relevant Project Experience • Los Angeles World Airports, Roadways, Utilities & Enabling Projects, Paving & Street Design • Topanga Elementary Charter School Access Design, Paving and Drainage Improvements • Santa Ana River Crossing Bridge Structural Assessment Riverside County, CA • City of Orange Water Division Warehouse Replacement & Relocation A *,IDS GROUP Page 11 Education Master of Science, Civil Engineering, University of California, Irvine Professional Credential Professional Structural Engineer, CA #S5020 Professional Civil Engineer, CA #C46592 Education MS, Civil Engineering, Rensselaer Polytechnic Institute Professional Credentials Professional Structural Engineer, CA #S6747 Professional Civil Engineer, CA #C84504 A `-'" I®S GROUP City of Santa Ana I On -Call Engineering Services RFP NO.: 23-030 Victor Mercado, PE, SE Structural Engineer Mr. Mercado is a 20+ year veteran at IDS Group with hands-on experience in structural design of steel structures, concrete frame or shear wall structures, masonry structures and timber structures for community -oriented projects. Relevant Project Experience' • City of Orange Water Division Warehouse Replacement & Relocation • Mt. San Antonio College Sow Barn and Sheep Sorting Pens Low Impact Development (LID) and Drainage Improvements • County of Orange Yale Navigation Center • County of Orange Public Works Tier 1 & Tier 3 Assessment of Buildings 10, 11A, 11B, 12A, 12B & 14 • City of Commerce Veterans Memorial Park Recreation Center Matthew Michnewich, MS, SE Structural Engineer Mr. Michnewich is a licensed Structural Engineer in California with eight years of experience in design and analysis of buildings. His areas of expertise include seismic evaluation and retrofit of existing buildings, and new construction of concrete and steel buildings. Mates passion for seismic engineering and extensive knowledge of both structural behavior and building codes have quickly made him a leader on important and complex projects. Relevant Project Experience • Topanga Elementary Charter School Access Design, Paving and Drainage Improvements • City of Orange Water Division Warehouse Replacement & Relocation • Cal Poly Pomona Arabian Horse Center Restoration Storm Drain System and Treatment • Los Angeles County Probation Department - Los Padrinos Parking Garage No. 18 Building Evaluation Page 12 Education Bachelor of Science, Mechanical Engineering, California State Polytechnic University, Pomona Professional Credential Professional Mechanical Engineer, CA #M30841 Education Bachelor of Science, Electrical Engineering, in Holy Angel University in the Philippines Professional Credential Professional Electrical Engineer, CA #C16367 A IL IDS GROUP City of Santa Ana I On -Call Engineering Services RFP NO.: 23-030 Darren Smith, PE, BEAP Lead MEP Manager Darren Smith is a registered mechanical engineer with more than 23 years of experience in both design bid build and design build projects. Darren is a very experienced design engineer and project manager with extensive experience in designing and managing numerous construction projects requiring strong cross communication at various levels of project ownership. Relevant Project Experience Los Angeles World Airports, Roadways, Utilities & Enabling Projects, Paving & Street Design • County of Orange Yale Navigation Center • Mt. San Antonio College Sow Barn and Sheep Sorting Pens Low Impact Development (LID) and Drainage Improvements • Department of General Services Junipero Serra State Office Building Manny Ocampo, PE Lead Electrical Engineer Mr. Ocampo has 33 years of electrical engineering experience and presently holds seven (7) professional electrical active professional registrations in the United States. Manny has provided electrical engineering consulting services to public and private agencies for municipalities, building assessments, warehouses, tilt -ups buildings, office buildings, high rise and mid -rise buildings, mixed use buildings, hospitals, clinics, shopping centers, restaurant chains industrial buildings and power generating plants. His expertise includes electrical design, and power plants construction, inspections, QA/QC and audits. Relevant Project Experience • Los Angeles World Airports, Roadways, Utilities & Enabling Projects, Security & Gate Improvements • Los Angeles World Airports, Roadways, Utilities & Enabling Projects, Shell Station Electrical Improvements • Riverside County Sheriff Dept., Coroner Facility Parking Lot Improvements, Drainage, and Water Quality • City of Orange Water Division Warehouse Replacement & Relocation Page 13 0 Education Masters Landscape Architecture, University of Arizona Professional Credential Professional Landscape Architect, CA: #4183 Education AA, Architectural Engineering Technology, Central New Mexico College Professional Credential NABCEP Certification for Photovoltaic System Design & Installation A * IDS GROUP City of Santa Ana I On -Call Engineering Services RFP NO.: 23-030 joy Lyndes, PLA, FASLA Landscape Architect Ms. Lyndes brings a broad range of municipal, local and state agency expertise specializing in transportation and facilities planning, design and construction oversight of complete streets, facilities programming and smart growth. Her practice focuses on health and wellbeing as one of the key pircrities of our community regeneration framework, fostering long-term health outcomes in our neighborhoods and public spaces. Her experience includes landscape programming, planning, design, construction documents, and construction administration for local, State and Federally funded projects. Relevant Project Experience • County of Orange Yale Navigation Center • Aerospace Corporation Pocket Park, El Segundo, CA • Leo Carrillo Historic Ranch Park, Carlsbad, CA • University of Arizona Bryant Banister Laboratory of Tree Ring Research, Tucson, AZ Electrical Project Manager Bob Kramer has 39 years of experience of diverse electrical systems including solar photovoltaic, solar thermal, architectural lighting, and electrical, instrumentation, and power distribution engineering design with automation layout in AutoCAD. His expertise is reflected in solar photovoltaic, lighting and power distribution, electrical feasibility studies, building automation systems, fire alarm systems, and medium voltage (2.4kV-5kV-12kV) utility infrastructure distributed on upgrade projects. Relevant Project Experience • Los Angeles World Airports, Roadways, Utilities & Enabling Projects, Shell Station Electrical Improvements • City of Orange Water Division Warehouse Replacement & Relocation • City of Costa Mesa Electric Vehicle Charging Station • City of Irvine Great Park Photovoltaic Infrastructure Development Page 14 City of Santa Ana I On -Call Engineering Services RFP NO.: 23-030 Relevant Experience Los Angeles World Airports, Infrastructure Improvement Projects I Los Angeles, CA Los Angeles World Airports - Roadways, Utilities, and Enabling Projects IDS is working with the prime consultant on street improvements that serve the area adjacent to the proposed Los Angeles International Airport (LAX) Consolidated Rental Car (ConRAC) and surrounding facilities. This project is an important component of the Los Angeles World Airports (LAWA) Landside Access Modernization Program (LAMP). The roadway improvements design will reduce congestion and enabla passengers to efficiently access LAX, provide direct connections from the local highways to the ConRAC and surrounding facilities, and reduce traffic impacts to local communities. The La Cienega Boulevard & Century Boulevard intersection will be rehabilitated and restriped, within existing curb limits, to improve traffic flow through the area. Improvement include new traffic signal heads, poles, and mast arms, the addition of audible pedestrian signals, loop detectors, update of the regulatory signage to agree with the revised striping configuration, and curb ramp and crosswalk redesign. Los Angeles World Airports - Security and Gate Improvements • Civil Engineering • Street Rehabilitation / Improvements • Mechanical, Plumbing, and Electrical Upgrades • Architecture • Re -striping reconfiguration • Coordination with multiple agency and community stakeholders Engineering design for security improvements to the perimeter gates and posts at eight (8) LAWA and Airport Police operated locations and three (3) tenant operated locations. • Gates/Posts upgraded to include one set of K-12 (M50) certified crash gates (17 total) and controls designed for installation along the perimeter of the airside or the landside approach. • Relocation of gate arms to be outside the rolling gates such that the gate arm will be the first gate that vehicles approach to prevent casual contact with rolling gates. • Utility mapping • LED lighting • Upgraded cameras for each of the posts and gates, excluding tenant gates. • Intercoms for security posts upgrades • Coordination with multiple stakeholders and community groups. Los Angeles International Airport Infrastructure Upgrades IDS working with the prime consultants for two critical infrastructure projects which service LAX: Airport Police and tenant operated locations and the re-establishment of permanent power to a Shell Gas Station for the 98th Street Duct Banks. Key Staff: Adrian Anderson, Jason Wetterich, Nathan Kerstiens, Harry Nguyen, Victor Lopez, Jaime Rosenbach, Darren Smith, Joyeuse Dufitumukiza, Manny Ocampo, John Silber, Shelley Sivak, and Michael Reed Project Dates: 2021 - On -going Contract Amounts: $330,000 (street improvements) 1 $389,458 (security & gates) 1 $13,001 (Shell Gas Station) Client References: Christian Seed (Commercial Manager for ARUP on behalf of LAWA for the Street Improvements and Infrastructure Upgrades) Phone: (310) 578-4400; Anthony Kirby (Principal for ARUP on behalf of LAWA for the Security and Gate Improvements Project) Phone: (310) 343-2616 1 Email: Anthonv.Kirbv0afuo.c0m AA IDS GROUP Page 15 City of Santa Ana I On -Call Engineering Services RFP NO.: 23-030 Riverside County Sheriff's Department Parking Lot Improvements for Coroner Bureau West Facility, Perris, California On -call task order contract with the Riverside County Sheriff's Department to provide civil engineering design services to redesign and grade the existing parking lot at the coroner facility in Perris, California. The 60,000 sf area is not paved and access to the parking lot is challenging especially flooding after a rain event. The IDS team is working with the agency to make needed improvements including paving, proper grading, drainage, and striping for the parking lot. Key Staff: Adrian Anderson, Jason Wetterich, Harry Nguyen, Abbegail Roman-Esperanza, Gill Iradukunda, Alan Lopez, Manny Ocampo, and Robert Perez Project Dates: June 2021 - on -going Contract Amount: $99,654 Client Reference: Riverside County Sheriff's Department Ramon Tadrous, Director Project Management Office Phone: (951) 955-5951 Email: rtadrous@riversidesheriff.org • Civil Engineering • Land Surveying • Geotechnical Study • Civil Improvement Plan • Water Quality Management Plan • Storm Water Management Plan (SWPPP) • Electrical Improvements • Construction Phase Services & IDS GROUP Page 16 City of Santa Ana I On -Call Engineering Services RFP NO.: 23-030 City of Orange Water Division I Warehouse Relocation Orange, California _, The IDS team is currently providing engineering design services for the replacement and relocation of the City of Orange Water Division warehouse. The existing warehouse location is now home to the City's new Fire Department Headquarters located at 105 South Water Street. The warehouse will be relocated to 1130 E. Almond Avenue. Warehouse Key Elements: • 5,000 sf building built on the southeast portion of the Water Division's existing yard on E. Almond Avenue • The covered structure over the outdoor materials for asphalt, backfill, gravel, and spoils will be in compliance with the National Pollutant Discharge Elimination System (NPDES) • Essential Service Facility • Civil Engineering • Land Surveying • Grading Plan • Vehicular Circulation Plan • Water Quality Management Report • Specifications • Structural and Electrical Engineering, Architectural Design Services • Cost Estimates Construction Documents Key Staff: Adrian Anderson, Jason Wetterich, Joyeuse Dufitumukiza, Matthew Michnewich, Victor Mercado, Bob Kramer, MannyOcampo, JohnSilber, and Song Brandner Project Dates: 2020 - on -going Contract Amount: $260,258 Client Reference: City of Orange Jeannette Guereca, PE City of Orange Phone: (714) 744-5525 Email: jguereca@cityoforange.org • The covered structure will be designed to address water pollution by regulation at the point source and minimizing erosion runoff into the storm drain system. A k IDS GROUP Page 17 City of Santa Ana I On -Call Engineering Services RFP NO.: 23-030 Los Angeles Community College District I Pierce College Stormwater Implementation Woodland Hills, California On -call task order contract with the Los Angeles Community College District to provide civil engineering design services for a stormwater bio-filtration capture and use program. The project is located in the northeast and south portion of the Los Angeles Pierce College (LAPC) campus. The program consists of three projects, which includes: 1) the Northeast North — Storm Water Implementation, 2) the Northeast South — Storm Water Implementation, and 3) Stadium Parking Lot 5 Bio-filtration. Key Staff: Adrian Anderson, Abbegail Roman-Esperanza, and Shelley Sivak Project Dates: August 2022 - on -going Contract Amount: $1,460,435 Client Reference: Los Angeles Community College District Alex Hoss, AIA Regional Program Manager Phone: (858) 774-1779 Email: alex.hoss@build-Iaccd.org • Civil Engineering • Land Surveying • Utility Infrastructure Analysis • Civil Improvement Plan • Storm Drain Improvement Plan • Specifications • City of Los Angeles Encroachment Permit • Agency Plan Approval • Construction Phase Services A- IDS GROUP Page 18 City of Santa Ana I On -Call Engineering Services RFP NO.: 23-030 Riverside Drive Street Rehabilitation and ADA Ramps IDS provided civil engineering and land surveying services to assist the city in their efforts to rehabilitate approximately one mile of Riverside Drive between Fair Oaks Avenue and Central Avenue. The civil engineering team was responsible for preparing street improvement plans to construct over sixty (60) directional ADA ramps at eight (8) intersections and rehabilitation of approximately four thousand linear feet of Riverside Drive using a combination of grind & overlay and removal and replacement. The 40-page plan set included enlarged intersection paving detail sheets, enlarged individual ramp detail sheets, plan and profile sheets, typical cross section sheets, and signing and striping sheet. Pipeline Avenue and Ramona Street Rehabilitation and ADA Ramps IDS provided civil engineering and land surveying services to assist the city in their efforts to rehabilitate portions of Pipeline Ave and Ramona Ave and construct new access ramps in the City of Chino. The scope of work included collection of field data and topographic and boundary survey mapping. IDS survey crew was responsible for the collection of field data using 9 conventional survey methods and our office survey team was able to prepare a topographic base map survey . r.7� which allowed for the design and preparation of street improvement plans. Additional responsibilities included perpetuating existing centerline monuments, setting accessory monuments, and filing records with the County Surveyor's office. IDS' civil engineering team was responsible for preparing street improvement plans to construct over thirty (30) directional ADA ramps at seven (7) intersections and rehabilitate portions of the existing street where necessary. The plan set included enlarged individual ramp detail sheets, typical cross section sheets, and signing and striping sheets. Key Staff: Nathan Kerstiens Project Dates: 2017 - 2020 1 Contract Amount: $153,749 Client Reference: City of Chino I Ms. Karen Campbell, Project Manager Phone: (909) 334-3250 1 Email: kampbell@cityofchino.org A, IDS GROUP Page 19 City of Santa Ana I On -Call Engineering Services RFP NO.: 23-030 d. Understanding of Need Project Management Work Plan IDS' current and projected backlog of projects will enable us to provide an efficient turnaround. We are sufficiently staffed with licensed engineers and designers and architects, and our team has the required specialized and in-depth resources necessary to ensure that project assignments will be performed according to schedule. Methodology IDS is committed to an architecture that is practical, innovative, sophisticated, and relevant to our place and time. We follow three general rules in our approach for a successful completion of a project: • Understanding of the City's Goals related to the specific project (task order) • Provide proactive communications during the evaluation or design process • Verify and measure the achieved goals Providing a collaborative �) partnership with the City lI Management Plan: IDS will work within the City standards and guidelines to ensure project success from design through completion. Our Management Plan is based upon a hierarchical team approach and is led by the corresponding Project Manager. In this management plan, the Project Manager will assemble a project team for each project assignment, matching the special capabilities of our staff and / or consultants with the requirements of the project. The Project Manager is committed to meeting staffing and schedule requirements necessary for successful project completion. Project communication begins with establishing project responsibilities, organizational structure, and clear lines of reporting within the consulting team. Based on our experience in similar projects, we have developed a clear and efficient management procedure for our services. The Project Manager will: Provide a licensed Project Engineer with extensive related work experience and training to meet the project needs. Ensure that the team is supported with the commitment of necessary resources of the firm(s) to respond to the project needs for a successful project completion, ensurethat qualified professionals with related work experience will be assigned for design review and design services respectively. A_'%- IDS GROUP Page 20 City of Santa Ana I On -Call Engineering Services RFP NO.: 23-030 • Develop the project schedule and monitor the progress of the project through standing team meeting and monitor the review budget at various stages. Provide progress reports and facilitate the review of the work. • Monitor the technical performance of the project team, ensure quality and consistency (QC), and ensure detection and resolution of project performance issues before they become problems. • Ensure that the City is clearly informed of the progress and status of the project. • Enhance working relationships of team members and the City. QUALITY ASSURANCE / QUALITY CONTROL Determine Project Requirements • Use of Department Standards Implement Procedures for Project Development • Use of Recognized References and Programs Coordinate with Project Subcontractors Awareness of Project Pan and Timeline coordinate Document Review&Approval • Open Commun"Iratlon Among Team Members Maintain Communication to Resolve Issues • Appropriate Storage of Project Documents Provide ulda /. p119111 he QC Issues • Timely Documemll ' _ .. au Maintemince of Prof 211111 • r • Completing Assignments In a Quality Manner Acwrdingto ProjectPlan • Communicate with Project Team and Manager • Enrordng Compliance with Plans &Specificalans. • Verify Mat Work is Technically Correct • Implementation of Testing& Inspection Pmgfam. • Verify Work Conforms to Project Plan &QA Plan • Implementation of Safely Procedure. • Leading Productive Ometmction Meetings. • IDprWgh R¢w¢w of Mejpr SubminaB and Resporea to flFl. •• PedodicSite Visits OuringCorKVuNon. • Review Projeclin light of Roject Constraints ConsM,itabllity. ---—_,—�^— —� TeMnicalCmrectness pear Resentatian This Itnesof-responsibly chart is actually adapted • verify work Conforms to Project Plain &QA Plan jfrom IDS Group Internal QA/QC Program manual. Our program requires the review of all architectural/engineering work by a QC Manager, who is qualified in these types of reviews. The main objective of this program is to satisfy the City's expectations for quality work from our design team and to limit the exposure of the City to problems that may arise during construction. The QC Manager and will be in continuous contact with our project manager throughout the progress of the assessment and design. Our practice stresses response to project requirements, adherence to applicable codes and regulations, developing work products consistent with standards prevailing in the profession, and producing reports conforming to our established in-house standards. Throughout the course of the project, our Project Manager will be in continuous contact with our team members to ensure efficient use of the capabilities of the entire team. The QC Manager will interact frequently with the City's core group to ensure that we understand the requirements and preferences and to assure adherence to the project schedules and deliverables in a timely manner. A IDS GROUP Page 21 City of Santa Ana I On -Call Engineering Services i _ RFP NO.: 23-030 PROJECT CONTROLS IDS provides skills and decision -making capabilities honed from many years of experience serving our clients. The overarching goal will be to ensure that project work is performed in strict accordance with contract documents, the project's schedule and budget, and governmental requirements. These services will primarily fall within the following four functional categories: • Cost Management: Provide accounting guidelines and budgets, establish cost control mechanisms, provide forecasts, validate project estimates, develop estimates, and negotiate change orders, anai.Vao cash flow, generate change order contingency reports, and develop estimates for alternative strategies for cost reduction scenarios. • Time Management: Ensure timely decision -making and actions regarding RFIs, submittals, schedule development, schedule review, monitoring of schedule resources and analysis of time extension requests. • Quality Management: Provide quality assurance and control functions necessary for constructability review and inspection. Enforce codes, regulations, design criteria, and safety requirements; and • Project/Contract Administration: Ensure that all the administrative tasks that must take place during project execution are accounted for. PROJECT BUDGET & COST CONTROL IDS believes that a comprehensive project budget should addresses all phases of the project and that a Cost Account Structure will be established so that costs are distinguishable at all levels of management. This budget will track costs performed from design through construction and actual costs invoiced through progress payments. The budget will be further refined as design activities continuous throughout the project and cost data becomes available. This process provides the City the ability to verify adherence to the project budget and scope of work. PROJECT REPORTING PROCEDURES IDS will provide reports that compare budget to actual costs, analyze cash flow and identify trends, present budget and schedule forecasts to the identified milestones. The reporting systems will include summaries and graphics. Reports will be designed to provide information at the different levels of detail required by the City's staff, or other project participants and decision -makers. Our proficiency with the industry's scheduling tools, such as PlanSwift® and Microsoft Project, enable us to control any project's time functions. Moreover, IDS has successfully used cost control systems on numerous projects. We have identified, captured, reported, and controlled costs using PlanSwift® and other client - required systems. The project controls systems can be set up on a facility -commodity basis such that roll -up reports can be created giving visibility to individual facility or individual commodity status. A IDS GROUP Page 22 City of Santa Ana I On -Call Engineering Services RFP NO.: 23-030 VALUE ENGINEERING, LIFE CYCLE COST ANALYSIS, AND BID ALTERNATE DESIGNATION IDS performs in-house cost estimates to identify opportunities for alternate bids that will provide flexibility for our clients as they balance between the project scope for construction and the cost of construction. The first path to value engineering savings is constructability. Our construction cost estimator provides an internal constructability review. which will allow the design team to eliminate scope that will later prove to be impractical to build and therefore costly. The second path to value engineering is the search for alternates that provide nearly equal performance at less initial cost. When considering these initial cost savings, IDS provides a life cycle cost analysis of the alternatives so that our clients can make informed choices. Value Engineering Project Example: The City of Rancho Santa Margarita City Hall and Bell Tower Regional Community Center required repairs due to water intrusion. IDS was retained as the architect of record (AOR) for the project. The initial cost estimates indicated that the project would come in significantly over budget. IDS value engineered portions of the work with alternative designs and determined constructability savings for the city. Prior to bidding, IDS identified add alternates in the bid documents. The project was on a $1,800k construction cost trajectory, however, due to the IDS team's value engineering efforts, the City awarded a contractor who bid of $1,450k. APPROVALPROCEDURE Effective construction management requires accurate and thorough communication and documentation management. IDS will serve as the communications liaison between the City's staff and the project contractor. We will provide field support to assist in an expedited review of construction -related issues such as Requests for Information (RFI), Submittals, Quality Control deficiencies and Change Orders. We will focus on adherence to formal procedures for logging, reviewing, processing, and expediting approvals. e. Willingness to Comply with Agreement Terms IDS' Associate Principal / Civil Project Manager, Adrian Anderson and Principal, Said Hilmy have reviewed the sample master agreement. IDS takes no exception to the master agreement. �, IDS GROUP Page 23 City of Santa Ana I On -Call Engineering Services tl' ' RFP NO.: 23-030 f. References The following public agencies have done business with IDS in the last five years where the scope of services are similar to the City of Santa Ana On -Call Engineering Services. Riverside County Sheriff's Department Parking Lot Improvements for Coroner Bureau West Facility, Perris, California On -call task order contract with the Riverside County Sheriff's Department to provide civil engineering design services to redesign and grade the existing parking lot at the coronerfacility in Perris, California. if r. Client Reference: Riverside County Sheriff's Department Ramon Tadrous, Director Project Management Office Phone: (951) 955-5951 Email: rtadrous@riversidesheriff.org City of Lancaster I El Dorado Park The IDS engineering team is working with the City of Lancaster on a phased planning and design for the El Dorado Park Improvements project. El Dorado Park is a vital community resource to the city. Improvements are being done to enhance the environment which is located in a densely populated area surrounded by residential neighborhoods, an elementary school, and commercial businesses. The project features a new community building, wellness stations, accessible walkways, skate park, plaza seating with overhead shade structure, and splash pad. Client Reference: Mr. Adam Lewis, City Engineer Phone: (661) 723-6009 Email: alewis@cityoflancasterca.gov Los Angeles Community College District I Pierce College Stormwater Implementation Woodland Hills, California On -call task order contract with the Los Angeles Community College District to provide civil engineering design services for a stormwater bio-filtration capture and use program. Client Reference: Los Angeles Community College District Alex Hoss, AIA Regional Program Manager Phone: (858) 774-1779 Email: alex.hoss@build-Iaccd.org .._, DS GROUP Page 24 City of Orange Water City of Santa Ana I On -Call Engineering Services RFP NO.: 23-030 Scope of Services IDS' approach to all task order assignments will be to act as the City's Engineering Design consultant for all design and approval -related activities. The discussion of scope of work and services below are general and would need to be modified to suit each specific project assignment. The following paragraphs contain the basic steps to take a project from conception to bidding. Note that not all projects will involve all steps, projects that consist only of studies or due diligence report will of course have different deliverables as outlined in the City Guidelines of projects delivery. Schematic Design • Field Review/Code Compliance: Research project scope thorough field review and interviews with key stakeholders. The findings of the field review and interviews will be compared to the relevant materials furnished by the city and to applicable codes including current ADA codes. • Schematic Design: Develop schematic designs and associated cost estimates for the project. The schematic designs will form the basis of initial presentation and review. The schematic designs will also be utilized to develop environmental technical studies and subsequent environmental documents. • Incorporate Plans with City's Standards: The finished plans will be prepared consistent with the City's business standards. Design Development • Experienced Team: Mobilize a team of experts suited to the project scope, immediately following the approval of the conceptual design and authorization of a design contract. The team will be led by the project manager with oversight from the supervising principal. • Kick-off Meeting: Assemble the project team with the City's representatives for a project kick- off meeting during which the conceptual design will be reviewed, and a timeline for the design development phase and construction document phase will be established. • Meeting with Stakeholders: Meet with all project stakeholders and review agencies to update all project scope aspects and to establish a sequence for the project review and approval, such that all reviews proceed in a logical fashion to minimize conflicting review comments and schedule impacts. • Progress Meetings: Maintain a regular schedule of progress meetings throughout the design progress. A schedule of milestone progress submittals will also be established based upon the scope and the most logical sequence to fast -track the design process. A lL IDS GROUP Page 26 City of Santa Ana I On -Call Engineering Services RFP NO.: 23-030 • Milestone Review: Hold milestone reviews. All milestones will conform to the approved schedule and will conclude with a team meeting to solidify the direction of the design. • Coordination: Coordinate with all internal review staff and document and track comments for incorporation into the final design. Any deviations from the original scope documents or deviations from design standards will be immediately reported and confirmed with the design team. Throughout the design development phase, we will aggressively coordinate with all agencies having jurisdiction. ., • Documents delivered at 80% Progress Set: At the 80% of Design DevelapAent progress, we meet with the City to review the 80% progress set of design development documents. We will implement any changes required. • Critical Path Schedule: We will assist in the coordination of a Critical Path Schedule for construction. • Completion of Design Development: At 100% of Design Development, we will deliver the Design Development progress set as hard copies, AutoCAD, and PDF file format. Construction Documents • CD Development: Proceed with preparation of construction documents upon authorization from the City after completion of design development. • Construction Documents: Delivered documents will be as set forth in the scope of work and will include required building permit review/responses and permit ready documents. • Preconstruction Review: Execute a comprehensive pre -construction review of the project to avoid any conflicting design issues, or specification misinterpretations or plan ambiguities. The extensive construction experience of the IDS staff will be particularly beneficial in this respect. • Cost Estimate: Issue a final construction cost estimate and schedule along with the completed construction documents including specifications. Bidding Assistance • Bid Review: Assist in bid review and award, following bid advertisement and acceptance. • Pre -Bid Meeting: We will attend the pre -bid meeting. • RFI Response: Promptly respond to all Requests for Information during the bidding process and assist in Issuing Amendments if needed. • Construction Observation I Administration • Submittals: Diligently document all responses and record observations from all field visits. • Contractor's Pay Request: Assist in the evaluation of contractor pay requests and extra work authorizations if required. • Inspection: Complete timely site inspections and attend site meetings. • Close-out: Assist with project punch lists and project close-out. 4, IDS GROUP Page 27 c Los Angeles World Airports a`2 City of Santa Ana I On -Call Engineering Services RFP NO.: 23-030 Appendix ATTACHMENT 3-1: NON -COLLUSION AFFIDAVIT CERTIFICATIONS NON -COLLUSION AFFIDAVIT (Title 23 United States Code Section 112 and Public Contract Code Section 7t06) To the CITY OF SANTA ANA DEPARTMENT OF PUBLIC WpAICA In accordance with Title 23 United States Code Section 112 and Public Contract Code 7106 the BIDDER declares that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the BIDDER has not directly or indirectly induced or solicited any other BIDDER to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived or agreed with any BIDDER or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the BIDDER has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the BIDDER or any BIDDER, or to fix any overhead, profit, or cost element of the bid price, or of that of any other BIDDER, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the BIDDER has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. Note: The above Non -collusion Affidavit is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Nan -collusion Affidavit. BIDDERS are cautioned that making a Use certification may subject the certifier to criminal prosecution. Signed State of G County of Su Bribed swam to (or affirmed) before me on this day of /&AA. 20ZZS by _ and/14 proved to me on the basis of satisfactory evidence to he the person(s) who appeared before me. Notary Public Signature Notary Public Seal City of Santa Ana RFP Page A3-1 _' ID.S GROUP Page 30 City of Santa Ana I On -Call Engineering Services RFP NO.: 23-030 Appendix ATTACHMENT 3-2: NON -LOBBYING CERTIFICATION CERTIFICATIONS The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that: l . No federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officei; employee of any federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any federal contract, the malting of any federal grant, the making of any federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any federal contract, grant, loan, or cooperative agreement. 2. If any funds other than federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence any officer or employee of any federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this federal contract, grant loan, loan or cooperative agreement, the undersigned shall complete and submit a "Disclosure of Lobbying Activities". This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U. S. Code. Any person who fails to file the required certification shall he subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of this certification be included in all lower tier subcontracts, which exceed $100,000 and that all such sub recipients shall certify and disclose accordingly. IDS Group, Inc. Signed and Printed Title Principal Date March 14, 2023 Said Hilmy City of Santa Ana RFP Pace A3-2 _-10S GROUP Page 31 City of Santa Ana I On -Call Engineering Services RFP NO.: 23-030 Appendix ATTACHMENT 3-3: NON-DISCRINW4ATION CERTIFICATION CERTIFICATIONS The undersigned consultant or corporate officer, during the performance of this contract, certifies as follows: The Consultant shall not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The Consultant shall take affirmative action to ensure that applicants are employed, and that employees are treated' ltlong employment without, regard to their race, color, religion, sex, or national origin. Such action shall include, but not be limited to, the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Consultant agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause. 2. The Consultant shall, in all solicitations or advertisements for employees placed by or on behalf of the Consultant, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, or national origin. 3. The Consultant shall send to each labor union or representative of workers with which he/she has a collective bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or workers' representatives of the Consultant's commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employment. 4. The Consultant shall comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor. 5. The Consultant shall furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his/her books, records, and accounts by the administering agency and the Secretary of Labor for purposes of investigation, to ascertain compliance with such rules, regulations, and orders. 6. In the event of the Consultant's non-compliance with the nondiscrimination clauses of this contract or with any of the said rules, regulations, or orders, the contract may be canceled, terminated, or suspended in whole or in part and the Consultant may be declared ineligible for further Government contracts or federally assisted construction contracts in accordance with procedures authorized in Execution Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or as otherwise provided by law. 7. The Consultant shall include the portion of the sentence immediately preceding paragraph (1) and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless exempted City of Santa Ana RFP Page A3-3 IDS GROUP Page 32 0 City of Santa Ana I On -Call Engineering Services RFP NO.: 23-030 by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontract or purchase order as the administering agency may direct as means of enforcing such provisions, including sanctions for noncompliance; provided, however, that in the event the Consultant becomes involved in, or is threatened with, litigation with a sub -consultant or vendor as a result of such direction by the administering agency, the Consultant may request that the United States enter into such litigation to protect the interests of the United States. 8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats. 1939, and as amended, No discrimination shall be made in the employment of persons upon public works because of race, religious creed, color, national origin, ancestry, physical handicaps, mental condition, marital status, or sex of such persons, except as provided in Section 1420, and any consultant of public works violating this Section is subject to all the penalties imposed for a violation of the Chapter. Signed: Title: Principal Finn: IDS Group, Inc. Date: March 14, 2023 City of Santa Ana RFP Page A3-4 A i IDS GROUP Page 33 AA IDS GROUP 1 Peters Canyon Road, Suite 130 1 Irvine, California 92606 1 T: (949) 387-8500 1 www.idsgi.com EXHIBIT C COMPENSATION Consultant's Fee Proposal including hourly rates if applicable •-u 'P �41 1 \•..'XN.^.\ IIIL, �f 6 City of Santa Ana On -Call Engineering Services RFP #23-030 March 14, 2023 Submitted by: IDS GROUP 1 Peters Canyon Road, Suite 130, Irvine, CA 92606 T: 949.387.8500 A F: 949.387.0800 A www.idsgi.com IDS GROUP, INC. 2023 Rate Sheet Principal $222 Associate Principal $208 Senior Project Manager I Associate $197 Project Manager $183 Senior Architect I Engineer $171 Senior Cost Estimator $158 Project Architect I Engineer $158 Designer Architect I Engineer $143 Engineering Designer - BIM $126 Architectural Job Captain I Designer $119 CAD Drafting Engineer I Architect $107 Office Administration $66 Expenses such as, but not limited to plan check fees, permits inspections, testing services, title company fees, special delivery charges, plotting/presentation boards, maps, aerial photographs, and reprographics / illustrations that may be required for community or other stakeholder presentations, shall be billed to the owner at Consultant's direct cost plus 5%. Burrola, Melissa From: City of Santa Ana <certificate-request@ctraxjdidata.com> Sent: Thursday, June 8, 2023 9:57 AM To: Lillian.hu@idsgi.com; Burrola, Melissa Subject: Internal Notice of Compliance NOTICE OF COMPLIANCE CITY STAFF: PRINT THIS PAGE AND INCLUDE WITH AGREEMENT TO THE CLERK OF THE COUNCIL Contractor IDS Group, Inc. Name: Project TBD (111) Number: Project CONSULTANT AGREEMENT BETWEEN THE CITY OF SANTA ANA AND Name: IDS GROUP, INC. FOR ON -CALL ENGINEERING SERVICES The Certificate of Insurance (COI) submitted indicates that the coverages are in compliance with the insurance requirements. No further action is required at this time. The compliant TYPE OF INSURANCE AUTOMOBILE LIABILITY GENERAL LIABILITY PROFESSIONAL LIABILITY are: WORKERS COMPENSATION AND EMPLOYERS' LIABILITY POLICY EXPIRATION NUMBER DATE COI DATE FILE NAME i COI -City of BA7R248947 ' 05/01/2024 j 05/01/2023 Santa Ana A- 2022-193-IDS Group-23-24.pdf COI -City of 680911717919 05/01/2024 05/01/2023 1 Santa Ana A- 2022-193-IDS Group-23-24.pdf i COI -City of 107008332 11/12/2023 05/01/2023 Santa Ana A- 2022-193-IDS Group-23-24.pdf COI -City of 72WEGAX2CTE 05/01/2024 05/01/2023 Santa Ana A- 2022-193-IDS Group-23-24.pdf 1