HomeMy WebLinkAboutItem 27 - SB 1 Fiscal Year Funds Public Works Agency
www.santa-ana.org/public-works
Item # 27
City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
June 20, 2023
TOPIC: SB 1 Fiscal Year Funds
AGENDA TITLE
Approve Resolution for the Fiscal Year 2023-24 Senate Bill 1 Local Streets and Roads,
Road Repair and Accountability Act Funding Program to Receive an Estimated Funding
Amount of $7,673,409 for Capital Improvement Projects (Non-General Fund)
RECOMMENDED ACTION
Adopt a Resolution affirming the Fiscal Year 2023-24 Senate Bill 1 projects list and
anticipated Road Maintenance and Rehabilitation Account (RMRA) funding in the
amount of $7,673,409, to be submitted to the California Transportation Commission for
budgeting the Fiscal Year 2023-24 Capital Improvement Program and maintaining
eligibility for Road Repair and Accountability Act funding.
DISCUSSION
In April 2017, Senate Bill 1 (SB1), the Road Repair and Accountability Act of 2017
(Chapter 5, Statutes of 2017), was passed by the Legislature and signed into law by the
Governor of California to address basic road maintenance, rehabilitation, and critical
safety needs on both the state highway and the local streets systems. During the RMRA
program application period, each year local agencies are required to adopt a Resolution
that includes a list of planned eligible projects that will utilize respective fiscal year
RMRA funding, and submit the Resolution to the California Transportation Commission
(CTC) (Exhibit 1). Each proposed RMRA-funded project must be specifically
differentiated from the Highway Users Tax Account (HUTA) funding.
The City will receive funding in an estimated amount of $7,673,409 in Fiscal Year 2023-
24 (FY23-24) from RMRA revenues. Each year, the City must submit a proposed RMRA
projects list to the CTC, and as required, provide updates on the project progress. The
proposed projects list must include a project description, specific location, proposed
schedule for its completion, and the project’s estimated useful life. The proposed
RMRA-funded projects will be incorporated into the FY23-24 Capital Improvement
Program (CIP) Budget, and staff has prepared Fiscal Year FY23-24 CIP Project Sheets
for each of the projects (Exhibit 2). Therefore, staff recommends that the City Council
adopt a resolution recognizing the proposed FY 23-24 RMRA-funded project list.
SB 1 Fiscal Year Funds
June 20, 2023
Page 2
3
5
2
8
ENVIRONMENTAL IMPACT
There is no environmental impact associated with the action.
FISCAL IMPACT
Pursuant to the California Transportation Commission’s Annual Reporting Guidelines for
Local Streets and Roads Funding, Staff has identified five FY23-24 CIP projects to be
funded with anticipated FY23-24 RMRA revenues, as well as previously proposed and
adopted projects that may also utilize FY23-24 RMRA revenues in the tables shown
below. The proposed FY23-24 CIP budget was prepared using the California
Department of Finance RMRA January 2023 estimate of $7,673,409.
FY23-24 CIP - SB1 Road Repair and Accountability Act Project List
Project Location Cost
Grand Avenue Rehabilitation McFadden Avenue to First Street $518,120
Main Street Rehabilitation Warner Avenue to Edinger Avenue $400,000
Euclid Street Rehabilitation
City Limit to McFadden Avenue,
McFadden Avenue to First Street,
First Street to Hazard Avenue
$1,039,880
Fairview Avenue Rehabilitation City Limit to Segerstrom Avenue $2,893,610
Bristol Street Rehabilitation Santa Clara Avenue to Memory Lane $1,480,000
Warner Avenue Rehabilitation Main Street to Grand Avenue $1,300,000
Previously Proposed SB1 Road Repair and Accountability Act Project List
First Street Rehabilitation Grand Avenue to Tustin Avenue
Westminster Avenue
Rehabilitation
Harbor Boulevard to Newhope Street
MacArthur Boulevard Rehabilitation Fairview Avenue to Raitt Street
Seventeenth Street Rehabilitation Fairview Avenue to Bristol Street
$41,799
Grand Total: $7,673,409
EXHIBIT(S)
1. Resolution and Proposed List of Projects for FY 2023-24
2. FY 2023-24 RMRA CIP Project Sheets
Submitted By: Nabil Saba, P.E., Executive Director – Public Works Agency
Approved By: Kristine Ridge, City Manager
R esolution No. 2023-XXX
Page 1 of 4
RESOLUTION NO. 2023-XXX
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
SANTA ANA ADOPTING A LIST OF PROJECTS TO BE
FUNDED FOR FISCAL YEAR 2023-24 BY SB 1: THE ROAD
REPAIR AND ACCOUNTABILITY ACT OF 2017
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SANTA ANA AS
FOLLOWS:
Section 1. The City Council of the City of Santa Ana hereby finds, determines and
declares as follows:
A.Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017, was
passed by the Legislature and signed into law by the Governor in April 2017 in order to
address the significant multi-modal transportation funding shortfalls statewide.
B.SB 1 includes accountability and transparency provisions that will ensure
the residents of the City of Santa Ana are aware of the projects proposed for funding in
our community and which projects have been completed each fiscal year.
C.The City of Santa Ana must establish a list of all projects to receive funding
from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, which
must include a description and the location of each proposed project, a proposed
schedule for the project’s completion, and the estimated useful life of the improvement.
D.The City will receive an estimated $7,673,409 in RMRA funding in Fiscal
Year 2023-24 from SB 1.
E.This is the seventh year in which the City of Santa Ana is receiving SB 1
funding and will enable the City to continue essential road maintenance and rehabilitation
projects, safety improvements, repairing and replacing aging bridges, and increasing
access and mobility options for the traveling public that would not have otherwise been
possible without SB 1.
F.The City used a Pavement Management System to develop the SB 1 project
list to ensure revenues are being used on the most high-priority and cost-effective projects
that also meet the priorities of the community for transportation investment.
G.The funding from SB 1 will help the City maintain and rehabilitate seven
streets/roads throughout the City this year and future streets/roads rehabilitations, bridge
projects, and active transportation projects in the future.
H. The 2020 California Statewide Local Streets and Roads Needs Assessment
found that the City’s streets and roads are in good condition and this revenue will help us
EXHIBIT 1
Resolution No. 2023-XXX
Page 2 of 4
maintain the overall quality of our road system and over the next decade will allow us the
opportunity to enhance our overall streets and roads condition.
I. The SB 1 project list and overall investment in our local streets and roads
infrastructure with a focus on basic maintenance, safety, investing in complete streets
infrastructure, and using cutting-edge technology, materials and practices, will have
significant positive co -benefits statewide.
Section 2. The City of Santa Ana adopts the following list of newly proposed
projects to be funded in-part or solely with RMRA revenues for Fiscal Year 2023-24.
Project Name
Location
Description
Proposed
Project
Start date
Proposed
Project
Completion
date
Estimated
Useful
Life
Grand Avenue
McFadden Avenue to First Street Road
Rehabilitation
7/1/23 12/31/24 20 years
Warner
Avenue
Main Street to Grand Avenue Road
Rehabilitation
7/1/23 12/31/24 20 years
Section 3. The following previously proposed and adopted projects may also
utilize Fiscal Year 2023-24 RMRA revenues in their delivery. With the relisting of these
projects in the adopted fiscal year resolution, the City is reaffirming to the public and the
State our intent to fund these projects with RMRA revenues:
Project Name
Location
Description
Proposed
Project
Start date
Proposed
Project
Completion
date
Estimated
Useful
Life
Main Street Warner Avenue to Edinger
Avenue
Road
Rehabilitation
7/1/23 8/31/23 20 years
Euclid Street City Limit to McFadden Avenue,
McFadden Avenue to First Street,
First Street to Hazard Avenue
Road
Rehabilitation
9/18/23 3/15/24 20 years
Fairview Street City Limit to Segerstrom Avenue Road
Rehabilitation
7/1/23 12/31/24 20 years
Bristol Street Santa Clara Avenue to Memory
Lane
Road
Rehabilitation
7/1/23 12/31/24 20 years
First Street Grand Avenue to Tustin Avenue
(Previously listed as Grand
Avenue to First Avenue)
Road
Rehabilitation
7/1/23 12/31/24 20 years
Westminster
Avenue Harbor Boulevard to Newhope
Street
Road
Rehabilitation
7/1/23 12/31/24 20 years
MacArthur
Boulevard Fairview Street to Raitt Street Road
Rehabilitation
7/1/23 12/31/24 20 years
Resolution No. 2023-XXX
Page 3 of 4
Seventeenth
Street Fairview Street to Bristol Street Road
Rehabilitation
7/1/23 12/31/24 20 years
Section 4. This Resolution shall take effect immediately upon its adoption by
the City Council, and the Clerk of the Council shall attest to and certify the vote adopting
this Resolution.
ADOPTED this 20 th day of June, 2023.
_
Valerie Amezcua
Mayor
APPROVED AS TO FORM:
Sonia R. Carvalho, City Attorney
By:
Jose Montoya
Assistant City Attorney
AYES: Councilmembers
NOES: Councilmembers
ABSTAIN: Councilmembers
NOT PRESENT: Councilmembers _
Resolution No. 2023-XXX
Page 4 of 4
CERTIFICATE OF ATTESTATION AND ORIGINALITY
I, Jennifer L. Hall, City Clerk, do hereby certify the attached Resolution No. 2023 -_____ to
be the original resolution adopted by the City Council of the City of Santa Ana on June 20,
2023.
Date:
City Clerk
City of Santa Ana
CITY OF SANTA ANA FY 23/24CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
PROJECT DESCRIPTION:
Reconstruction/resurfacing of existing pavement and
replacement/installation of missing or damaged, curbs, gutters,
sidewalks, driveway approaches, and wheelchair ramps within this
segment of roadway.
PROJECT NEED:
The City's Pavement Management Program (PMP) has been
developed to prioritize and recommend the most cost-effective roadway
repairs, and maximize the return from available funding for street
pavement. This segment of Grand Avenue pavement rehabilitation is
identified as a high priority in the PMP.
PROJECT TITLE:
Grand Ave Roadway Rehab:
McFadden Ave to 1st St
PROJECT CATEGORY:
Street Improvements
Arterial Street Rehabilitation
LOCATION MAP
AGENCY:DIVISION:CONTACT:DATE:
Public Works CIP Engineering Jason Gabriel, Principal Civil Engineer 20-Jun-2023
PROJECT COSTS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30
Construction 518,120 ------
Engineering -------
TOTAL 518,120 ------
SOURCE OF FUNDS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30
GAS TAX -------
RMRA SB1 518,120 ------
TOTAL 518,120 ------
EXHIBIT 2
CITY OF SANTA ANA FY 23/24CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
PROJECT DESCRIPTION:
Reconstruction/resurfacing of existing pavement and
replacement/installation of missing or damaged, curbs, gutters,
sidewalks, driveway approaches, and wheelchair ramps within this
segment of roadway.
PROJECT NEED:
The City's Pavement Management Program (PMP) has been
developed to prioritize and recommend the most cost-effective roadway
repairs, and maximize the return from available funding for street
pavement. This segment of Main Street pavement rehabilitation is
identified as a high priority in the PMP.
PROJECT TITLE:
Main St Rehab: Warner to Edinger
PROJECT CATEGORY:
Street Improvements
Arterial Street Rehabilitation
LOCATION MAP
AGENCY:DIVISION:CONTACT:DATE:
Public Works CIP Engineering Sean Thomas, Senior Civil Engineer 20-Jun-2023
PROJECT COSTS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30
Construction 400,000 ------
TOTAL 400,000 ------
SOURCE OF FUNDS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30
GAS TAX -------
RMRA SB1 400,000 ------
TOTAL 400,000 ------
CITY OF SANTA ANA FY 23/24CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
PROJECT DESCRIPTION:
Reconstruction/resurfacing of existing pavement and
replacement/installation of missing or damaged, curbs, gutters,
sidewalks, driveway approaches, and wheelchair ramps within this
segment of roadway.
PROJECT NEED:
The City's Pavement Management Program (PMP) has been
developed to prioritize and recommend the most cost-effective roadway
repairs, and maximize the return from available funding for street
pavement. This segment of Euclid Street pavement rehabilitation is
identified as a high priority in the PMP.
PROJECT TITLE:
Euclid St Rehab: City Limit to
McFadden
PROJECT CATEGORY:
Street Improvements
Arterial Street Rehabilitation
LOCATION MAP
AGENCY:DIVISION:CONTACT:DATE:
Public Works CIP Engineering Sean Thomas, Senior Civil Engineer 20-Jun-2023
PROJECT COSTS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30
Construction 497,880 ------
Engineering -------
TOTAL 497,880 ------
SOURCE OF FUNDS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30
RMRA SB1 497,880 ------
TOTAL 497,880 ------
CITY OF SANTA ANA FY 23/24CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
PROJECT DESCRIPTION:
Reconstruction/resurfacing of existing pavement and
replacement/installation of missing or damaged, curbs, gutters,
sidewalks, driveway approaches, and wheelchair ramps within this
segment of roadway.
PROJECT NEED:
The City's Pavement Management Program (PMP) has been
developed to prioritize and recommend the most cost-effective roadway
repairs, and maximize the return from available funding for street
pavement. This segment of Euclid Street pavement rehabilitation is
identified as a high priority in the PMP.
PROJECT TITLE:
Euclid St Rehab: McFadden to 1st
PROJECT CATEGORY:
Street Improvements
Arterial Street Rehabilitation
LOCATION MAP
AGENCY:DIVISION:CONTACT:DATE:
Public Works CIP Engineering Sean Thomas, Senior Civil Engineer 20-Jun-2023
PROJECT COSTS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30
Construction 370,000 ------
Engineering -------
TOTAL 370,000 ------
SOURCE OF FUNDS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30
RMRA SB1 370,000 ------
TOTAL 370,000 ------
CITY OF SANTA ANA FY 23/24CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
PROJECT DESCRIPTION:
Reconstruction/resurfacing of existing pavement and
replacement/installation of missing or damaged, curbs, gutters,
sidewalks, driveway approaches, and wheelchair ramps within this
segment of roadway.
PROJECT NEED:
The City's Pavement Management Program (PMP) has been
developed to prioritize and recommend the most cost-effective roadway
repairs, and maximize the return from available funding for street
pavement. This segment of Euclid Street pavement rehabilitation is
identified as a high priority in the PMP.
PROJECT TITLE:
Euclid St Rehab: 1st to Hazard
PROJECT CATEGORY:
Street Improvements
Arterial Street Rehabilitation
LOCATION MAP
AGENCY:DIVISION:CONTACT:DATE:
Public Works Design Engineering Sean Thomas, Senior Civil Engineer 20-Jun-2023
PROJECT COSTS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30
Construction 172,000 ------
Engineering -------
TOTAL 172,000 ------
SOURCE OF FUNDS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30
RMRA SB1 172,000 ------
TOTAL 172,000 ------
CITY OF SANTA ANA FY 23/24CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
PROJECT DESCRIPTION:
Reconstruction/resurfacing of existing pavement and
replacement/installation of missing or damaged, curbs, gutters,
sidewalks, driveway approaches, and wheelchair ramps within this
segment of roadway.
PROJECT NEED:
The City's Pavement Management Program (PMP) has been
developed to prioritize and recommend the most cost-effective roadway
repairs, and maximize the return from available funding for street
pavement. This segment of Fairview Avenue pavement rehabilitation is
identified as a high priority in the PMP.
PROJECT TITLE:
Fairview Ave Rehab: City Limits to
Segerstrom
PROJECT CATEGORY:
Street Improvements
Arterial Street Rehabilitation
LOCATION MAP
AGENCY:DIVISION:CONTACT:DATE:
Public Works CIP Engineering Edward Torres, Senior Engineer 20-Jun-2023
PROJECT COSTS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30
Construction 2,893,610 ------
Engineering -------
TOTAL 2,893,610 ------
SOURCE OF FUNDS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30
RMRA SB1 2,893,610 ------
TOTAL 2,893,610 ------
CITY OF SANTA ANA FY 23/24CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
PROJECT DESCRIPTION:
Reconstruction/resurfacing of existing pavement and
replacement/installation of missing or damaged, curbs, gutters,
sidewalks, driveway approaches, and wheelchair ramps along
Bristol Street between Santa Clara Avenue and Memory Lane.
PROJECT NEED:
This segment of roadway has been identified as a high priority by the
City's Pavement Management System. The pavement is deteriorating
due to weather, age, and heavy usage. Some of the adjacent curbs,
gutters, driveway approaches, curb ramps, and sidewalks are also in
various states of disrepair and require replacement.
PROJECT TITLE:
Bristol St Rehab: Santa Clara to
Memory Ln
PROJECT CATEGORY:
Street Improvements
Arterial Street Rehabilitation
LOCATION MAP
AGENCY:DIVISION:CONTACT:DATE:
Public Works CIP Engineering Sean Thomas, Senior Civil Engineer 20-Jun-2023
PROJECT COSTS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30
Construction 1,480,000 ------
TOTAL 1,480,000 ------
SOURCE OF FUNDS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30
RMRA SB1 1,480,000 ------
TOTAL 1,480,000 ------
CITY OF SANTA ANA FY 23/24CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
PROJECT DESCRIPTION:
This project will widen Warner Avenue between Main Street and
Oak Street from 2 to 3 lanes in each direction. The project also
includes additional left turn lanes at Main Street, bus turn outs,
raised medians, and bike lanes along Warner Avenue between Main
Street and Oak Street.
PROJECT NEED:
The MPAH (Master Plan of Arterial Highways) Strategic Plan Technical
Report identified the need for Warner Avenue to be widened to a six-
lane major arterial to meet MPAH requirements. The existing Average
Daily Traffic (ADT) is in excess of 29,600 vehicles per day. The
proposed improvements will allow the segment to accommodate future
traffic volumes at a Level of Service A and increase operational
efficiency.
PROJECT TITLE:
Warner Ave Improvements: Phase 1
- Main to Oak
PROJECT CATEGORY:
Street Improvements
Street/Bridge Improvements &
Widening
LOCATION MAP
AGENCY:DIVISION:CONTACT:DATE:
Public Works CIP Engineering Jason Gabriel, Principal Civil Engineer
PROJECT COSTS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30
Construction 800,000 ------
Right-Of-Way -------
TOTAL 800,000 ------
SOURCE OF FUNDS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30
DAF: DA-IV -------
MEASURE M2 COMPETITIVE -------
RMRA SB1 800,000 ------
TSIA AREA E -------
TOTAL 800,000 ------
20-Jun-2023
CITY OF SANTA ANA FY 23/24CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
PROJECT DESCRIPTION:
This project will widen Warner Avenue between Oak Street and
Grand Avenue from 2 to 3 lanes in each direction. The project will
also include additional left turn lanes at Grand Avenue, bus pads,
raised medians, and a protected bike lane.
PROJECT NEED:
The MPAH (Master Plan of Arterial Highways) Strategic Plan Technical
Report identified the need for Warner Avenue to be widened to a six-
lane major arterial to meet MPAH requirements. The existing Average
Daily Traffic (ADT) is in excess of 29,600 vehicles per day. The
proposed improvements will allow the segment to accommodate future
traffic volumes at a Level of Service A and increase operational
efficiency.
PROJECT TITLE:
Warner Ave Improvements: Phase 2
- Oak to Grand
PROJECT CATEGORY:
Street Improvements
Street/Bridge Improvements &
Widening
LOCATION MAP
AGENCY:DIVISION:CONTACT:DATE:
Public Works CIP Engineering Jason Gabriel, Principal Civil Engineer
PROJECT COSTS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30
Construction 5,151,910 ------
Right-Of-Way 1,410,130 ------
TOTAL 6,562,040 ------
SOURCE OF FUNDS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30
M2 LOCAL FAIRSHARE 1,287,170 ------
MEASURE M2 COMPETITIVE 4,331,030 ------
RMRA SB1 500,000 ------
TRANSP SYSTEM IMPRV
AREA
99,010 ------
TSIA AREA E 204,830 ------
TSIA AREA F 140,000 ------
TOTAL 6,562,040 ------
20-Jun-2023